# US 2021/0063174 A1 · Information processor, information processing method, and computer-readable recording medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0063174 A1
- Document ID: US20210063174A1
- Status: Published application
- Kind: A1
- Application number: 16/903,031
- Filed: 2020-06-16
- Published: 2021-03-04
- Earliest claimed: 2019-08-29
- Assignees: Subaru Corporation
- Applicants: Subaru Corporation
- Inventors: Kazutaka SAITO; Toshiyuki OMURA; Atsushi YASUMURO; Kazumasa MIURA; Masami OISHI; Hideki OGAWA; Masanobu TANAKA
- Web page: https://patentgrep.com/patent/US20210063174A1

## CPC

- G01C 21/3446: {Details of route searching algorithms, e.g. Dijkstra, A*, arc-flags or using precalculated routes}
- G01C 21/3461: {Preferred or disfavoured areas, e.g. dangerous zones, toll or emission zones, intersections, manoeuvre types or segments such as motorways, toll roads or ferries}
- G01C 21/3492: {employing speed data or traffic data, e.g. real-time or historical (traffic control systems for road vehicles involving transmission of navigation instructions to the vehicle G08G1/0968)}
- G01C 21/3697: {Output of additional, non-guidance related information, e.g. low fuel level (G01C21/3679 takes precedence)}
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)

## Abstract

An information processor includes a route evaluation unit, a route selection unit, and a course creation unit. The route evaluation unit calculates route evaluation points for each of proposed routes in each of segments, on the basis of a condition of a road in the relevant one of the proposed routes. The segments are coupled between respective two nearest neighbors of a sequence from a starting point to a destination point through one or more via-points. The route selection unit selects, on the basis of the route evaluation points, one proposed route from the proposed routes for each of the segments. The course creation unit connects the proposed routes selected by the route selection unit, to create a course from the starting point to the destination point.

## Claims

### Claim 1

An information processor, comprising:
a route evaluation unit configured to calculate route evaluation points for each of proposed routes in each of segments, on a basis of a condition of a road in the relevant one of the proposed routes, the segments being coupled between respective two nearest neighbors of a sequence from a starting point to a destination point through one or more via-points;
a route selection unit configured to select, on a basis of the route evaluation points, one proposed route from the proposed routes for each of the segments; and
a course creation unit configured to connect the proposed routes selected by the route selection unit, to create a course from the starting point to the destination point.

### Claim 2 (depends on 1)

The information processor according to claim 1, wherein
the route selection unit selects one proposed route from the proposed routes, on a basis of number of the route evaluation points.

### Claim 3 (depends on 1)

The information processor according to claim 1, wherein
the condition of the road includes a position of the road, a feature of the road, weather on the road, or public reputation of the road, or any combination thereof.

### Claim 4 (depends on 2)

The information processor according to claim 2, wherein
the condition of the road includes a position of the road, a feature of the road, weather on the road, or public reputation of the road, or any combination thereof.

### Claim 5 (depends on 1)

The information processor according to claim 1, wherein
necessary time for each of the proposed routes in a corresponding one of the segments is shorter than predetermined time.

### Claim 6 (depends on 2)

The information processor according to claim 2, wherein
necessary time for each of the proposed routes in a corresponding one of the segments is shorter than predetermined time.

### Claim 7 (depends on 1)

The information processor according to claim 1, wherein
the course creation unit is configured to create a different course from a distance-oriented or necessary-time-oriented course.

### Claim 8 (depends on 2)

The information processor according to claim 2, wherein
the course creation unit is configured to create a different course from a distance-oriented or necessary-time-oriented course.

### Claim 9 (depends on 1)

The information processor according to claim 1, further comprising:
an acquisition unit configured to acquire proposed via-points for the one or more via-points; and
a via-point setting unit configured to set at least one of the proposed via-points acquired by the acquisition unit, as the one or more via-points to be used in creating the course.

### Claim 10 (depends on 2)

The information processor according to claim 2, further comprising:
an acquisition unit configured to acquire proposed via-points for the one or more via-points; and
a via-point setting unit configured to set at least one of the proposed via-points acquired by the acquisition unit, as the one or more via-points to be used in creating the course.

### Claim 11 (depends on 1)

The information processor according to claim 1, further comprising:
a determination unit configured to make a determination as to whether or not the course created by the course creation unit satisfies a predetermined condition other than a condition based on the route evaluation points; and
a course setting unit configured to set the course created by the course creation unit as a proposed course for route guidance, on a condition that the determination unit determines that the course created by the course creation unit satisfies the predetermined condition.

### Claim 12 (depends on 2)

The information processor according to claim 2, further comprising:
a determination unit configured to make a determination as to whether or not the course created by the course creation unit satisfies a predetermined condition other than a condition based on the route evaluation points; and
a course setting unit configured to set the course created by the course creation unit as a proposed course for route guidance, on a condition that the determination unit determines that the course created by the course creation unit satisfies the predetermined condition.

### Claim 13 (depends on 11)

The information processor according to claim 11, wherein the determination unit determines whether or not the course created by the course creation unit includes a requisite place to be included in the course, as the determination as to whether or not the course created by the course creation unit satisfies the predetermined condition.

### Claim 14 (depends on 12)

The information processor according to claim 12, wherein the determination unit determines whether or not the course created by the course creation unit includes a requisite place to be included in the course, as the determination as to whether or not the course created by the course creation unit satisfies the predetermined condition.

### Claim 15

An information processing method, comprising:
calculating route evaluation points for each of proposed routes in each of segments, on a basis of a condition of a road in the relevant one of the proposed routes, the segments being coupled between respective two nearest neighbors of a sequence from a starting point to a destination point through one or more via-points;
selecting, on a basis of the route evaluation points, one proposed route from the proposed routes for each of the segments; and
connecting the proposed routes selected by the selecting, to create a course from the starting point to the destination point.

### Claim 16

A non-transitory computer-readable recording medium containing a program, the program causing, when executed by a computer, the computer to implement a method, the method comprising:
calculating route evaluation points for each of proposed routes in each of segments, on a basis of a condition of a road in the relevant one of the proposed routes, the segments being coupled between respective two nearest neighbors of a sequence from a starting point to a destination point through one or more via-points;
selecting, on a basis of the route evaluation points, one proposed route from the proposed routes for each of the segments; and
connecting the proposed routes selected by the selecting, to create a course from the starting point to the destination point.

### Claim 17

An information processor, comprising circuitry configured to:
calculate route evaluation points for each of proposed routes in each of segments, on a basis of a condition of a road in the relevant one of the proposed routes, the segments being coupled between respective two nearest neighbors of a sequence from a starting point to a destination point through one or more via-points;
make selection of one proposed route from the proposed routes for each of the segments, on a basis of the route evaluation points; and
connect the proposed routes selected by the selection, to create a course from the starting point to the destination point.
