# US 2021/0062640 A1 · Methods for Determining a Position of a Droppable Object in a Wellbore

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0062640 A1
- Document ID: US20210062640A1
- Status: Published application
- Kind: A1
- Application number: 17/002,130
- Filed: 2020-08-25
- Published: 2021-03-04
- Earliest claimed: 2019-08-28
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Demid Valeryevich DEMIDOV; Artem Valeryevich KABANNIK; Roman Vladimirovich KORKIN
- Web page: https://patentgrep.com/patent/US20210062640A1

## CPC

- E21B 47/095: by detecting an acoustic anomalies, e.g. using mud-pressure pulses
- E21B 33/16: using plugs for isolating cement charge; Plugs therefor {(stage cementing E21B33/146; spacer compositions C09K8/424)}
- E21B 33/165: {Cementing plugs specially adapted for being released down-hole (cementing heads E21B33/05)}
- E21B 23/04: operated by fluid means, e.g. actuated by explosion (E21B23/08 takes precedence)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The position of a droppable object (e.g., a cementing plug or drillpipe dart) in a cased wellbore may be determined in real time during a cementing operation. A pressure data acquisition system is installed at a wellsite and a pressure transducer is installed at the wellhead. As the droppable object travels through casing it encounters regions with a positive or a negative change of inner cross-sectional dimension. The droppable object generates a pressure pulse as it passes through the regions. The pressure pulse and associated reflections are detected by the pressure transducer, and the signals are processed mathematically to determine the current position of the droppable object.

## Claims

### Claim 1

A method for determining a position of a droppable object inside a casing string, comprising:
(i) installing the casing string into a liquid filled borehole, wherein the casing string comprises at least one region with a negative or a positive change of inner cross-sectional dimension;
(ii) installing a pressure data acquisition system at a wellsite, and a pressure transducer at a wellhead;
(iii) placing the droppable object inside the casing string;
(iv) pumping a fluid behind the droppable object, causing the droppable object to travel through the interior of the casing string and pass through the at least one region with a negative or a positive change of inner cross-sectional dimension, thereby generating a pressure pulse;
(v) recording the pressure data with a pressure transducer, and transmitting the pressure data to the pressure data acquisition system; and
(vi) processing the pressure data mathematically by obtaining the pressure pulses, pulse reflections or both, and determining the position of the droppable object.

### Claim 2 (depends on 1)

The method of claim 1, wherein the droppable object is a top cementing plug, or a bottom cementing plug, or a drill pipe dart.

### Claim 3 (depends on 1)

The method of claim 1, wherein the change of inner cross-sectional dimension is located at casing pipe joints, wherein the casing pipe joints comprise screw joints, weld joints or both.

### Claim 4

(canceled)

### Claim 5 (depends on 1)

The method of claim 1, wherein the mathematical processing of the pressure pulses and pulse reflections comprises cepstral analysis, comprising producing a pressure cepstrogram in coordinates of quefrency and time, and calculating the pressure pulse reflection time from the droppable object traveling through the casing string.

### Claim 6 (depends on 1)

The method of claim 1, wherein the mathematical processing further comprises determination of a tube wave velocity, based on the pressure pulse reflection time from a stationary object with a known position in the wellbore.

### Claim 7 (depends on 1)

The method of claim 1, where the reflection time from the droppable object is converted to the position of droppable object by multiplication by tube wave velocity.

### Claim 8 (depends on 1)

The method of claim 1, wherein the mathematical processing comprises analyzing a pressure spectrogram and determination of pressure pulses.

### Claim 9 (depends on 1)

The method of claim 1, wherein the mathematical processing comprises analyzing a normalized energy spectral density of the pressure data.

### Claim 10 (depends on 9)

The method of claim 9, wherein the normalized energy spectral density is computed by integrating the pressure spectrogram along the frequency axis followed by normalization.

### Claim 11 (depends on 1)

The method of claim 1, wherein the mathematical processing comprises a correlation between anticipated pressure pulses based on casing tally information and pressure pulses from the pressure spectrogram or normalized energy spectral density.

### Claim 12 (depends on 1)

The method of claim 1, wherein the locating of the droppable object is performed in real time during pumping, allowing an operator to control movement of the droppable object.

### Claim 13

(canceled)

### Claim 14

A method for cementing a borehole penetrating a subterranean formation, comprising:
(i) installing a casing string into the is liquid-filled borehole, wherein the casing string comprises at least one region with a negative or a positive change of inner cross-sectional dimension;
(ii) installing a pressure data acquisition system at a wellsite, and at least one pressure transducer at a wellhead;
(iii) placing a top cementing plug inside the casing string;
(iv) pumping a displacement fluid behind the top cementing plug, causing the top cementing plug to travel through the interior of the casing string and pass through the at least one region with a negative or a positive change of inner cross-sectional dimension, thereby generating a pressure pulse;
(v) using the at least one pressure transducer to detect the pressure pulse and transmit pressure data to the pressure data acquisition system, the pressure data comprising pressure pulse propagation velocity and reflection time; and
(vi) processing the pressure data mathematically and determining the position of the top cementing plug.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
(a) placing a bottom cementing plug inside the casing string;
(b) pumping a cement slurry behind the bottom cementing plug, causing the bottom cementing plug to travel through the interior of the casing string and pass through the at least one region with a negative or a positive change of inner cross-sectional dimension, thereby generating a pressure pulse;
(c) using the at least one pressure transducer to detect the pressure pulse and transmit pressure data to the pressure data acquisition system, the pressure data comprising a pressure pulse propagation velocity and a reflection time; and
(d) processing the pressure data mathematically and determining the position of the bottom cementing plug.

### Claim 16

(canceled)

### Claim 17 (depends on 14)

The method of claim 14, wherein the mathematical processing comprises cepstral analysis, comprising producing a pressure cepstrogram in coordinates of quefrency and time, and calculating the pressure pulse reflection time from the top or bottom wiper plug.

### Claim 18 (depends on 14)

The method of claim 14, wherein the mathematical processing further comprises determination of tube wave velocity, based on reflection time from a stationary object with a known position in the wellbore.

### Claim 19 (depends on 14)

The method of claim 14, wherein reflection time from the top cementing plug is converted to the position of the top cementing plug by multiplication by tube wave velocity.

### Claim 20 (depends on 14)

The method of claim 14, wherein the mathematical processing comprises analyzing a pressure spectrogram and determination of pressure pulses.

### Claim 21 (depends on 14)

The method of claim 14, wherein the mathematical processing comprises analyzing a normalized energy spectral density of the pressure data.

### Claim 22 (depends on 14)

The method of claim 14, wherein the normalized energy spectral density is computed by integrating the pressure spectrogram along the frequency axis followed by normalization.

### Claim 23 (depends on 14)

The method of claim 14, wherein the mathematical processing comprises a correlation between anticipated pressure pulses based on casing tally information and pressure pulses from the pressure spectrogram or normalized energy spectral density.

### Claim 24 (depends on 14)

The method of claim 14, wherein the locating of the cementing plug is performed in real time during pumping, allowing an operator to make instant decisions concerning treatment progress.

### Claim 25 (depends on 14)

The method of claim 14, wherein the velocity of tube wave propagation is taken from measurements recorded while cementing a previous section or a neighbouring well with similar characteristics.