Tripping Optimization
AssigneeExxonMobil Upstream Research Company
InventorsLei Wang, Melissa M. Lee, Jonathan B. Barry, Paul E. Pastusek
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorsLei Wang, Melissa M. Lee, Jonathan B. Barry, Paul E. Pastusek
Estimating the term…
Methods and systems for optimizing timing for drilling and tripping operation. An example method may include receiving a plurality of sensor data characterizing rig equipment and tripping status. The method may include identifying a plurality of multi-thread rig states based on the plurality of sensor data. The method calculates a plurality of optimal rig state characteristics (RSCs), wherein the plurality of optimal RSCs are calculated based on the plurality of sensor data as it relates to the plurality of multi-thread rig states. The method also performs a tripping operation with the rig equipment after applying the plurality of optimal RSCs. The method may also gather a plurality of updated sensor data from the rig equipment during the tripping operation for a recalculation of the plurality of optimal RSCs.
A method of optimizing timing for drilling and tripping operation comprising:
A system for drilling a wellbore and/or tripping operation, comprising:
The system of claim 17, wherein calculating the plurality of optimal RSCs uses aggregated statistics relating to the plurality of sensor data measured for a plurality of stands tripped in using the rig equipment.
A non-transitory machine readable medium comprising instructions configured to direct a processor to:
Dependencies are inferred from the claim text.