# US 2021/0032819 A1 · A precast segmental pier reinforced with both conventional steel bars and high-strength steel bars

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0032819 A1
- Document ID: US20210032819A1
- Status: Published application
- Kind: A1
- Application number: 16/967,287
- Filed: 2019-02-01
- Published: 2021-02-04
- Earliest claimed: 2018-02-05
- Assignees: Hengqin Gonge Technology Co., Ltd.
- Applicants: Hengqin Gonge Technology Co., Ltd.
- Inventors: Zhenyu WANG; Zhongkui CAI
- Web page: https://patentgrep.com/patent/US20210032819A1

## CPC

- E01D 19/02: Piers {(E01D19/005 takes precedence; towers for suspension bridges E01D19/14)}; Abutments (foundations E02D ){; Protecting same against drifting ice (against colliding vehicles E01F15/00)}
- E01D 21/00: Methods or apparatus specially adapted for erecting or assembling bridges
- E01D 2101/22: Masonry; Bricks
- E01D 2101/30: Metal (E01D2101/26 takes precedence)
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})

## Abstract

A precast segmental pier reinforced with both conventional steel bars and high-strength steel bars according to one or more embodiments of the present invention includes a footing, a segmental pier, longitudinal bars and unbonded post-tensioned tendons, characterized in that: the segmental pier is comprised of one or more precast segments, the longitudinal bars are comprised of both the conventional steel bar and the high-strength steel bar, connecting the footing and the segmental pier together with unbonded post-tensioned tendons to form an entire pier.

## Claims

### Claim 1

A precast segmental pier reinforced with first steel bars and second steel bars having higher strength than the first steel bars, comprising a footing, a segmental pier, longitudinal bars and unbonded post-tensioned tendons, characterized in that: the segmental pier is comprised of one or more precast segments, the longitudinal bars comprised of both the first steel bars and the second steel bars, connecting the footing and the segmental pier together with unbonded post-tensioned tendons to form an entire pier.

### Claim 2

A precast segmental pier reinforced with both first steel bars and second steel bars having higher strength than the first steel bars, comprising a footing, a segmented pier, longitudinal bars and unbonded post-tensioned tendons, characterized in that: the segmental pier is comprised of two or more precast segments, the longitudinal bars are comprised of both the first steel bars and the second steel bars, connecting the footing and the segmental pier together with unbonded post-tensioned tendons to form an entire pier; the first steel bar and the second steel bar only pass through several precast segments of the lower part of the segmental pier, and are not arranged along the entire pier.

### Claim 3 (depends on 1)

The precast segmental pier of claim 1, wherein the ratio of the reinforcement ratio of the first steel bar to the reinforcement ratio of the second steel bars is 0.5 to 2.0, and the longitudinal bars are arranged symmetrically and/or at intervals in the cross-section.

### Claim 4 (depends on 1)

The precast segmental pier of claim 1, wherein the upper surface and the lower surface of each precast segment are flat or be provided with one or more shear keys.

### Claim 5 (depends on 1)

The precast segmental pier of claim 1, wherein the first steel bars are HRB400, HRB500, HRBF400, HRBF500, HRB400E, HRB500E, HRBF400E or HRBF 500E, and the second steel bars are PSB785, PSB830, PSB930, PSB1080 or PSB1200.

### Claim 6 (depends on 1)

The precast segmental pier of claim 1, wherein corrugated ducts are reserved in the footing and each precast segment.

### Claim 7 (depends on 6)

The precast segmental pier of claim 6, wherein the corrugated ducts is realized by embedding a metal corrugated pipe in advance, the corrugated pipe is a circular metal corrugated pipe, the diameter of metal corrugated pipe is d, which d is the diameter of the longitudinal bar.

### Claim 8 (depends on 6)

The precast segmental pier of claim 6, wherein the embedded part of the metal corrugated pipe in the footing is no less than 36 d, which d is the diameter of longitudinal bar.

### Claim 9 (depends on 1)

The precast segmental pier of claim 1, wherein the lower end of the second steel bar is used together with an anchor matched with it so as to enhance the anchorage performance.

### Claim 10 (depends on 1)

The precast segmental pier of claim 1, wherein the lower end of the unbonded post-tensioned tendons are anchored in the footing, and the tendons sequentially pass through the ducts for post-tensioned tendons with smooth inner wall reserved in each precast segment when the pier is assembled, and the upper unbonded post-tensioned tendons are anchored in the recess for the anchor of post-tensioned tendons after tensioning; the unbonded post-tensioned tendons are steel strands, deformed steel bars or FRP bars.

### Claim 11 (depends on 7)

The precast segmental pier reinforced of claim 7, wherein the embedded part of the metal corrugated pipe in the footing is no less than 36 d, which d is the diameter of longitudinal bar.

### Claim 12 (depends on 2)

The precast segmental pier of claim 2, wherein the ratio of the reinforcement o of the first steel bar to the reinforcement ratio of the second steel bars is 0.5 to 2.0, and the longitudinal bars are arranged symmetrically and/or at intervals in the cross-section.

### Claim 13 (depends on 2)

The precast segmental pier of claim 2 wherein the upper surface and the lower surface of each precast segment are flat or be provided with one or more shear keys.

### Claim 14 (depends on 2)

The precast segmental pier of claims 2, wherein the first steel bars are HRB400, HRB500, HRBF400, HRBF500, HRB400E, HRB500E, HRBF400E or HR 500E, and the second steel bars are PSB785, PSB830, PSB930, PSB1080 or PSB1200.

### Claim 15 (depends on 2)

The precast segmental pier of claim 2, wherein the lower end of the second steel bar is used together with an anchor matched with it so as to enhance the anchorage performance.

### Claim 16 (depends on 2)

The precast segmental pier of claim 2, wherein the lower end of the unbonded post-tensioned tendons are anchored in the footing, and the tendons sequentially pass through the ducts for post-tensioned tendons with smooth inner wall reserved in each precast segment when the pier is assembled, and the upper unbonded post-tensioned tendons are anchored in the recess for the anchor of post-tensioned tendons after tensioning, and the unbonded post-tensioned tendons are steel strands, deformed steel bars or FRP bars.