# US 2021/0006162 A1 · Method for Operating a Voltage Converter

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0006162 A1
- Document ID: US20210006162A1
- Status: Published application
- Kind: A1
- Application number: 16/772,966
- Filed: 2018-12-06
- Published: 2021-01-07
- Earliest claimed: 2017-12-14
- Assignees: Vitesco Technologies GmbH
- Applicants: Vitesco Technologies Germany GmbH
- Inventors: Martin Ehrmann
- Web page: https://patentgrep.com/patent/US20210006162A1

## CPC

- H02M 3/1582: {Buck-boost converters (H02M3/1584 takes precedence)}
- H02M 1/08: Circuits specially adapted for the generation of control voltages for semiconductor devices incorporated in static converters
- H02M 1/0058: {by employing soft switching techniques, i.e. commutation of transistors when applied voltage is zero or when current flow is zero (using an auxiliary actively switched resonant commutation circuit connected to an intermediate DC voltage or between two push-pull branches of an inverter bridge H02M7/4811; in resonant inverters H02M7/4815; in inverters operating from a resonant DC source H02M7/4826)}
- Y02B 70/10: Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS

## Abstract

Various embodiments include a method for operating a bidirectional voltage converter with an input-side half-bridge, an output-side half-bridge, and a bridge branch having a bridge inductance, comprising: determining an actual mean bridge current value flowing through the bridge branch during a respective subsequent switching cycle T1 of the transistor switches in a respective current switching cycle T0; determining switch-on time points and switch-on durations of the respective transistor switches for the respective subsequent switching cycle T1; and switching on the respective transistor switches at the respective ascertained switch-on time points and for the respective ascertained switch-on durations in the respective subsequent switching cycle T1.

## Claims

### Claim 1

A method for the operation of a bidirectional voltage converter with an input-side half-bridge circuit having respectively a positive-voltage-side and a negative voltage side transistor switch connected in series with one another, an output-side half-bridge circuit having respectively a positive-voltage-side and a negative-voltage-side transistor switch connected in series with one another, and a bridge branch having a bridge inductance, the method comprising:
determining an actual mean bridge current value IL avg mess flowing through the bridge branch during a respective subsequent switching cycle T1 of the transistor switches in a respective current switching cycle;
determining switch-on time points and switch-on durations of the respective transistor switches for the respective subsequent switching cycle T1;
switching on the respective transistor switches at the respective ascertained switch-on time points and for the respective ascertained switch-on durations in the respective subsequent switching cycle T1.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein determining the switch-on time points and the switch-on durations includes using a predefined mean setpoint bridge current value IL_avg_soll.

### Claim 3 (depends on 2)

The method as claimed in claim 2, further comprising:
calculating a current difference ΔI between the ascertained actual mean bridge current value IL_avg_mess and the specified mean setpoint bridge current value IL_avg_soll;
calculating a duty cycle correction value ΔDC based on the current difference ΔI; and
determining the switch-on time points and the switch-on durations includes using the calculated duty cycle correction value ΔDC.

### Claim 4 (depends on 1)

The method as claimed in claim 1, further comprising:
determining an instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b of the bridge current (IL) in the respective current switching cycle T0, wherein the instantaneous bridge current should flow through the bridge branch at the time at which one of the transistor switches is switched over from a switched-on state into a switched-off state; and
the switch-on time points and the switch-on durations are furthermore ascertained with the ascertained instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b.

### Claim 5 (depends on 4)

The method as claimed in claim 4, wherein the instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b depends at least in part on the bridge inductance and charge transfer capacitances of the transistor switches.

### Claim 6 (depends on 4)

The method as claimed in claim 4, further comprising:
determining a period duration based at least in part on the instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b in the respective subsequent switching cycle T1; and
switching on or off the transistor switches in the respective subsequent switching cycle T1 for the ascertained period duration.

### Claim 7 (depends on 6)

The method as claimed in claim 6, wherein:
determining the switch-on time points and the switch-on durations includes using a predefined mean setpoint bridge current value IL avg soll; and
determining the period duration depends at least in part on the actual mean bridge current value IL_avg_mess.

### Claim 8 (depends on 1)

The method as claimed in claim 1, further comprising:
measuring an input voltage at the input-side half-bridge circuit and an output voltage at the output-side half-bridge circuit in the respective current switching cycle T0;
comparing the input voltage and the output voltage to one another; and
determining the switch-on time points, the switch-on durations, and/or the period duration based at least in part on the result of the comparison between the input voltage and the output voltage.

### Claim 9 (depends on 8)

The method as claimed in claim 8, wherein determining the switch-on time points and the switch-on durations includes using a predefined mean setpoint bridge current value IL avg soll; the method further comprising:
determining an instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b of the bridge current in the respective current switching cycle T0, wherein the instantaneous bridge current should flow through the bridge branch at the time at which one of the transistor switches is switched over from a switched-on state into a switched-off state; and
the switch-on time points and the switch-on durations are furthermore ascertained with the ascertained instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b;
wherein, with a relationship between the measured input voltage U1 and the measured output voltage U2:
U2>k1*U1, wherein k1>1, in particular k1=1.2, in the subsequent switching cycle T1,
the positive-voltage-side transistor switch (S1) of the input-side half-bridge circuit (H1) is switched on continuously (continuously switched ‘high’);
the negative-voltage-side transistor switch (S2) of the input-side half-bridge circuit (H1) is switched off continuously (continuously switched ‘low’);
the negative-voltage-side transistor switch (S4) of the output-side half-bridge circuit (H2) is switched on from the beginning of switching cycle T1 for a first switch-on duration tein_S4, and switched off for the remaining time of the period duration Tper of the subsequent switching cycle T1; and
the positive-voltage-side transistor switch (S3) of the output-side half-bridge circuit (H2) is switched off from the beginning of switching cycle T1 for the first switch-on duration tein_S4, and switched on for the remaining time of the period duration Tper of the subsequent switching cycle T1;
wherein for the first switch-on duration tein_S4 the following apply:
tein_S4
=
2
·
L
·
(
Istart


1

a
-
IL_avg

_soll
)
·
[
U


2
·
(
1
+
Δ

DC
)
-
U


1
]
U


1
·
(
U


1
-
U


2
)
,
with IL_avg_soll>=0 amperes, or
tein_S4
=
2
·
L
·
(
Istart


1

b
-
IL_avg

_soll
)
·
[
U


1
-
U


2
·
(
1
+
Δ

DC
)
]
U


1
·
(
U


1
-
U


2
)
,
with IL_avg_soll<0 amperes.

### Claim 10 (depends on 9)

The method as claimed in claim 9, wherein the period duration Tper for the respective subsequent switching cycle T1 is ascertained on the basis of the following equations:
Tper
=
2
·
L
·
U


2
·
(
Istart


1

a
-
IL_avg

_soll
)
U


1
·
(
U


1
-
U


2
)
,
with IL_avg_soll>=0 amperes, or
Tper
=
2
·
L
·
U


2
·
(
IL_avg

_soll
-
Istart


1

b
)
U


1
·
(
U


1
-
U


2
)
,
with IL_avg_soll<0 amperes.

### Claim 11 (depends on 8)

The method as claimed in claim 8, wherein determining the switch-on time points and the switch-on durations includes using a predefined mean setpoint bridge current value IL avg soll; the method further comprising:
determining an instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b of the bridge current in the respective current switching cycle T0, wherein the instantaneous bridge current should flow through the bridge branch at the time at which one of the transistor switches is switched over from a switched-on state into a switched-off state; and
the switch-on time points and the switch-on durations are furthermore ascertained with the ascertained instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b; wherein, with a relationship between the measured input voltage U1 and the measured output voltage U2:
k2*U1<=U2<=k1*U1, where k2<=1, in particular k2=0.8, and k1>=1, in particular k1=1.2, that in the subsequent switching cycle T1,
the positive-voltage-side transistor switch (S1) of the input-side half-bridge circuit (H1) and the negative-voltage-side transistor switch (S4) of the output-side half-bridge circuit (H2) are switched on from the beginning of switching cycle T1 for a second switch-on duration tein_S4, and are switched off for the remaining time of the period duration Tper of the subsequent switching cycle T1,
the negative-voltage-side transistor switch (S2) of the input-side half-bridge circuit (H1) and the positive-voltage-side transistor switch (S3) of the output-side half-bridge circuit (H2) are switched off from the beginning of switching cycle T1 for the second switch-on duration tein_S4, and are switched on for the remaining time of the period duration Tper of the subsequent switching cycle T1,
wherein for the second switch-on duration tein_S4 the following apply:
tein_S4
=
2
·
L
·
(
IL_avg

_soll
-
Istart


2

a
)
·
[
U


2
+
(
U


1
+
U


2
)
·
Δ

DC
]
U


1
·
U


2
,
with IL_avg_soll>=0 amperes, or
tein_S4
=
2
·
L
·
[
(
U


1
+
U


2
)
·
Δ

DC
+
U


2
]
·
(
Istart


2

b
-
IL_avg

_soll
)
U


1
·
U


2
,
with IL_avg_soll<0 amperes.

### Claim 12 (depends on 11)

The method as claimed in claim 11, wherein the period duration Tper for the respective subsequent switching cycle T1 is ascertained on the basis of the following equations:
Tper
=
2
·
L
·
(
IL_avg

_soll
-
Istart


2

a
)
·
(
U


1
+
U


2
)
U


1
·
U


2
,
with IL_avg_soll>=0 amperes, or
Tper
=
2
·
L
·
(
Istart


2

b
-
IL_avg

_soll
)
·
(
U


1
+
U


2
)
U


1
·
U


2
,
with IL_avg_soll<0 amperes.

### Claim 13 (depends on 8)

The method as claimed in claim 8, wherein determining the switch-on time points and the switch-on durations includes using a predefined mean setpoint bridge current value IL avg soll; the method further comprising:
determining an instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b of the bridge current in the respective current switching cycle T0, wherein the instantaneous bridge current should flow through the bridge branch at the time at which one of the transistor switches is switched over from a switched-on state into a switched-off state; and
the switch-on time points and the switch-on durations are furthermore ascertained with the ascertained instantaneous bridge current value Istart1a, Istart1b; Istart2a, Istart2b; Istart3a, Istart3b;
wherein, with a relationship between the measured input voltage U1 and the measured output voltage U2:
U2<k2*U1, where k2<1, in particular k2=0.8, that in the subsequent switching cycle T1,
the positive-voltage-side transistor switch (S3) of the output-side half-bridge circuit (H2) is switched on continuously (continuously switched ‘high’),
the negative-voltage-side transistor switch (S4) of the output-side half-bridge circuit (H2) is switched off continuously (continuously switched ‘low’),
the positive-voltage-side transistor switch (S1) of the input-side half-bridge circuit (H1) is switched on from the beginning of switching cycle T1 for a third switch-on duration tein_S1, and is switched off for the remaining time of the period duration Tper of the subsequent switching cycle T1, and
the negative-voltage-side transistor switch (S2) of the input-side half-bridge circuit (H1) is switched off from the beginning of switching cycle T1 for the third switch-on duration tein_S1, and is switched on for the remaining time of the period duration Tper of the subsequent switching cycle T1,
wherein for the third switch-on duration tein_S1 the following apply:
tein_S1
=
2
·
L
·
(
IL_avg

_soll
-
Istart


3

a
)
·
(
U


1
·
Δ

DC
+
U


2
)
U


2
·
(
U


1
-
U


2
)
,
with IL_avg_soll>=0 amperes, or
tein_S1
=
2
·
L
·
(
Istart


3

b
-
IL_avg

_soll
)
·
(
U


1
·
Δ

DC
+
U


2
)
U


2
·
(
U


1
-
U


2
)
,
with IL_avg_soll<0 amperes.

### Claim 14 (depends on 13)

The method as claimed in claim 13, wherein the period duration Tper for the respective subsequent switching cycle T1 is ascertained on the basis of the following equations:
Tper
=
2
·
L
·
U


1
·
(
Istart


3

a
-
IL_avg

_soll
)
U


2
·
(
U


2
-
U


1
)
,
with IL_avg_soll>=0 amperes, or
Tper
=
2
·
L
·
U


1
·
(
IL_avg

_soll
-
Istart


3

b
)
U


2
·
(
U


2
-
U


1
)
,
with IL_avg_soll<0 amperes.

### Claim 15

A voltage converter for bidirectional voltage conversion, the voltage converter comprising:
an input-side half-bridge circuit having a positive-voltage-side and a negative-voltage-side transistor switch connected in series with one another;
an output-side half-bridge circuit having a positive-voltage-side and a negative-voltage-side transistor switch connected in series with one another;
a bridge branch having a bridge inductance;
a measuring arrangement configured to measure a bridge current flowing through the bridge branch over the entire current switching cycle T0 for a respective subsequent switching cycle T1 of the transistor switches during the current switching cycle T0;
an ascertainment arrangement configured to determine an actual mean bridge current value IL_avg_mess from the measured bridge current and to determine switch-on time points and switch-on durations of the respective transistor switches for the respective subsequent switching cycle T1 from the actual mean bridge current value IL_avg_mess;
a control arrangement configured to switch each respective transistor switch on at the respective ascertained switch-on time point and for the respective ascertained switch-on durations in the respective subsequent switching cycle T1.
