# US 2020/0403897 A1 · Debugging arrangement for active ethernet cable

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0403897 A1
- Document ID: US20200403897A1
- Status: Published application
- Kind: A1
- Application number: 16/693,144
- Filed: 2019-11-22
- Published: 2020-12-24
- Earliest claimed: 2019-06-21
- Assignees: Credo Technology Group Limited
- Applicants: Credo Technology Group Limited
- Inventors: Yifei DAI; Yattung LAM; Rajan PAI
- Web page: https://patentgrep.com/patent/US20200403897A1

## CPC

- H04L 43/0829: Packet loss
- G06F 11/3636: {by tracing the execution of the program}
- H04L 43/0811: by checking connectivity
- H04L 43/18: Protocol analysers
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A cable, a manufacturing method, and a usage method, each facilitate product development, testing, and debugging. An illustrative embodiment of a cable manufacturing method includes: connecting a first connector plug to a first data recovery and re-modulation (DRR) device and to a first controller device; and coupling electrical signal conductors to the first DRR device to convey electrical transit signals to and from a second DRR device, the second DRR device being connected to a second connector plug. The first controller device is operable in response to a host command to initiate a debug dump by the first DRR device and to store the debug dump in a nonvolatile memory.

## Claims

### Claim 1

A cable manufacturing method that comprises:
connecting a first connector plug to a first data recovery and re-modulation (DRR) device and to a first controller device, the first controller device operable in response to a host command to initiate a debug dump by the first DRR device and to store the debug dump in a nonvolatile memory; and
coupling electrical signal conductors to the first DRR device to convey electrical transit signals to and from a second DRR device, the second DRR device being connected to a second connector plug.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first controller device is operable in response to power-on events to configure the first DRR device using contents from the nonvolatile memory.

### Claim 3 (depends on 1)

The method of claim 1, wherein the first DRR device converts between the electrical transit signals and multiple outgoing and incoming data lanes conveyed by dedicated pins on the first connector plug, and wherein the first connector plug further includes dedicated pins for a two wire bus that conveys the host command and provides host access to the debug dump.

### Claim 4 (depends on 1)

The method of claim 1, further comprising: packaging the first connector plug, the first DRR device, and the first controller device, as a first end connector of a cable; and packaging the second connector plug, the second DRR device, and a second controller device, as a second end connector of the cable.

### Claim 5 (depends on 4)

The method of claim 4, further comprising: plugging the first and second end connectors into interface ports of automated test equipment (ATE), the ATE transmitting data across the cable while monitoring for packet loss or link failure.

### Claim 6 (depends on 5)

The method of claim 5, further comprising: upon detection of packet loss or link failure by the ATE, sending the host command to initiate the debug dump.

### Claim 7 (depends on 6)

The method of claim 6, wherein the debug dump includes link status, frequency offset, and signal margin.

### Claim 8 (depends on 4)

The method of claim 4, further comprising:
plugging the first and second end connectors into interface ports of customer equipment, the customer equipment transmitting data across the cable while monitoring for packet loss or link failure;
upon detection of packet loss or link failure, initiating the host command to initiate the debug dump; and
plugging the first and second end connectors into interface ports of test equipment that retrieves the debug dump.

### Claim 9

A cable that comprises:
a first end connector having a first connector plug connected to a first data recovery and re-modulation (DRR) device and to a first controller device, the first controller device operable in response to a host command to initiate a debug dump by the first DRR device and to store the debug dump in a first nonvolatile memory;
a second end connector having a second connector plug connected to a second DRR device and to a second controller device; and
electrical signal conductors that convey electrical transit signals between the first and second DRR devices.

### Claim 10 (depends on 9)

The cable of claim 9, wherein the first controller device is operable in response to power-on events to configure the first DRR device using contents from the nonvolatile memory.

### Claim 11 (depends on 9)

The cable of claim 9, wherein the first DRR device converts between the electrical transit signals and multiple outgoing and incoming data lanes conveyed by the first host connector on dedicated pins, and wherein the first host connector further includes dedicated pins for a two wire bus that conveys the host command and provides host access to the debug dump.

### Claim 12 (depends on 9)

The cable of claim 9, wherein the second controller device is operable to initiate a debug dump by the second DRR device and to store the debug dump in a second nonvolatile memory.

### Claim 13 (depends on 9)

The cable of claim 9, wherein the debug dump includes link status, frequency offset, and signal margin.

### Claim 14

A communications method that comprises:
supplying power via a first connector plug to a first end connector of a cable, the first end connector having a first data recovery and re-modulation (DRR) device connected to the first connector plug to convert outgoing data lanes into electrical transit signals for transmission to a second end connector and to convert electrical transmit signals received from the second end connector into incoming data lanes, and further having a first controller device that configures operation of the first DRR device in response to power-on events;
monitoring for packet loss or link failure while sending the outgoing data lanes and receiving the incoming data lanes; and
upon detecting packet loss or link failure, triggering the first controller device to initiate a debug dump by the first DRR device.

### Claim 15 (depends on 14)

The method of claim 14, further comprising: causing the first controller device to transfer the debug dump from volatile memory in the first DRR device to nonvolatile memory in the first controller device.

### Claim 16 (depends on 14)

The method of claim 14, further comprising: accessing nonvolatile memory of the first controller device to retrieve the debug dump.

### Claim 17 (depends on 16)

The method of claim 16, wherein the debug dump includes link status, frequency offset, and signal margin.
