# US 2020/0403502 A1 · Electronic device with an output voltage booster mechanism

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0403502 A1
- Document ID: US20200403502A1
- Status: Published application
- Kind: A1
- Application number: 17/011,848
- Filed: 2020-09-03
- Published: 2020-12-24
- Earliest claimed: 2017-12-20
- Assignees: Micron Technology, Inc.
- Applicants: Micron Technology, Inc.
- Inventors: Michele Piccardi
- Web page: https://patentgrep.com/patent/US20200403502A1

## CPC

- H02M 3/07: using capacitors charged and discharged alternately by semiconductor devices with control electrode {, e.g. charge pumps}
- H02M 3/073: {Charge pumps of the Schenkel-type}
- H02M 3/076: {the clock signals being boosted to a value being higher than the input voltage value}
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)

## Abstract

An electronic device includes: a clock booster configured to generate a boosted intermediate voltage greater than a source voltage, wherein the clock booster includes: a controller capacitor configured to store energy for providing a control signal, wherein the control signal is for controlling charging operations to generate the boosted intermediate voltage based on the source voltage, and a booster capacitor configured to store energy according to the control signal for providing the boosted intermediate voltage; and a secondary booster operatively coupled to the clock booster, the secondary booster configured to generate an output voltage based on the boosted intermediate voltage, wherein the output voltage is greater than both the source voltage and the boosted intermediate voltage.

## Claims

### Claim 1

An electronic device, comprising:
a clock booster configured to generate a boosted intermediate voltage greater than a source voltage, wherein the clock booster includes:
a first controller capacitor configured to store energy for providing a first control signal,
a second controller capacitor configured to store energy for providing a second control signal, wherein the first and second control signals are for controlling charging operations to generate the boosted intermediate voltage using the source voltage,
a set of capacitors configured to store energy according to the first control signal and separate from the energy stored in the first controller capacitor, the set of capacitors for providing the boosted intermediate voltage; and
a secondary booster operatively coupled to the clock booster, the secondary booster configured to generate an output voltage based on the boosted intermediate voltage, wherein the output voltage is greater than the boosted intermediate voltage.

### Claim 2 (depends on 1)

The electronic device of claim 1, further comprising:
booster switches directly connected to the set of capacitors, wherein each of the booster switches include a control portion directly connected to the first controller capacitor for receiving the first control signal.

### Claim 3 (depends on 2)

The electronic device of claim 2, wherein each of the booster switches includes (1) a first portion directly connected to the source voltage and (2) a second portion directly connected to a corresponding capacitor in the set of capacitors.

### Claim 4 (depends on 1)

The electronic device of claim 1, wherein capacitors within the set of capacitors are connected to each other in parallel.

### Claim 5 (depends on 1)

The electronic device of claim 1, wherein the electronic device is a double boosted charge pump.

### Claim 6 (depends on 1)

The electronic device of claim 1, further comprising:
a first controller switch operably coupled between the source voltage and the first controller capacitor, wherein the first controller switch is configured to operate according to the second control signal; and
a second controller switch operably coupled between the source voltage and the second controller capacitor, wherein the second controller switch is configured to operate according to the first control signal.

### Claim 7 (depends on 6)

The electronic device of claim 6, wherein:
the first controller capacitor is directly connected to a clock signal opposite the first controller switch, wherein the first controller capacitor is configured to provide the first control signal based on the clock signal; and
the second controller capacitor is directly connected to a negated signal that complements the clock signal, wherein the second controller capacitor is configured to provide the second control signal based on the negated signal.

### Claim 8 (depends on 6)

The electronic device of claim 6, further comprising:
a first slave-booster configured to receive the second control signal and directly connected to the second controller switch; and
a second slave-booster configured to receive the first control signal and directly connected to the first controller switch.

### Claim 9 (depends on 8)

The electronic device of claim 8, wherein:
the first slave-booster is directly connected to a clock signal; and
the second slave-booster is directly connected to a negated signal that complements the clock signal.

### Claim 10 (depends on 1)

The electronic device of claim 1, wherein the electronic device includes multiple charge stages that each include the clock booster and one of multiple secondary booster circuits, wherein the secondary booster circuits include the secondary booster and are connected in series across the charge stages to generate the boosted intermediate voltage, and wherein the clock boosters are parallel to each other across the charge stages.

### Claim 11 (depends on 1)

The electronic device of claim 1, further comprising a switching module directly connected to the clock booster and the secondary booster, wherein the switching module is configured to route the boosted intermediate voltage from the clock booster as an input to the secondary booster.

### Claim 12 (depends on 11)

The electronic device of claim 11, wherein the switching module includes a set of signal paths for routing the boosted intermediate voltage.

### Claim 13 (depends on 11)

The electronic device of claim 11, wherein the switching module includes a first routing switch, a second routing switch, a first complementary switch, a second complementary switch, or a combination thereof, wherein the first routing switch and the second routing switch are biased complementary to the first complementary switch and the second complementary switch.

### Claim 14 (depends on 1)

The electronic device of claim 1, wherein the first controller capacitor has a capacitance level less than that of the set of capacitors.

### Claim 15

A method of operating an electronic device, the method comprising:
using a clock booster, generating a boosted intermediate voltage greater than a source voltage, wherein generating the booster intermediate voltage includes:
using a first controller capacitor, storing energy for generating a first control signal,
using a second controller capacitor, storing energy for generating a second control signal, wherein the first and second control signal are configured to control charging operations to generate the boosted intermediate voltage using the source voltage, and
using a set of capacitors, storing energy according to the first control signal and separate from the energy stored in the first controller capacitor, wherein the energy stored at the set of capacitors is for generating the boosted intermediate voltage; and
generating an output voltage based on using the boosted intermediate voltage to charge capacitors, wherein the output voltage is greater than the boosted intermediate voltage.

### Claim 16 (depends on 15)

The method of claim 15, further comprising:
operating a first controller switch based on the energy stored on the second controller capacitor, wherein operating the first controller switch includes controlling an electrical connection between the first controller capacitor and the source voltage; and
operating a second controller switch based on the energy stored on the first controller capacitor, wherein operating the second controller switch includes controlling an electrical connection between the second controller capacitor and the source voltage.

### Claim 17 (depends on 16)

The method of claim 16, wherein:
operating the second controller switch includes operating the second controller switch according to a clock signal that is provided to the first controller capacitor; and
operating the first controller switch includes operating the first controller switch according to a negated signal that complements the clock signal and that is provided the second controller capacitor.

### Claim 18 (depends on 16)

The method of claim 16, further comprising:
operating a set of booster switches to charge the set of capacitors for generating the boosted intermediate voltage, wherein operating the set of booster switches includes controlling an electrical connection between the source voltage and the set of capacitors according to the first control signal;
operating a second set of booster switches to charge a second set of capacitors for generating the boosted intermediate voltage, wherein operating the second set of booster switch includes controlling an electrical connection between the source voltage and the second set of capacitors according to the second control signal.

### Claim 19 (depends on 15)

The method of claim 15, wherein storing the energy for generating the first control signal includes storing the energy at the first controller capacitor having a capacitance level that is less than a capacitance level of the set of capacitors.

### Claim 20

A double boosted charge pump, comprising:
a first controller capacitor configured to store energy for providing a first control signal;
a second controller capacitor configured to store energy for providing a second control signal, wherein the first and second control signals are configured to charging operations to generate a boosted intermediate voltage using a source voltage;
a set of capacitors configured to store energy according to the first control signal and separate from the energy stored in the first controller capacitor, the set of capacitors for providing the boosted intermediate voltage; and
a secondary booster operatively coupled to the set of capacitors, the secondary booster configured to generate an output voltage based on the boosted intermediate voltage, wherein the output voltage is greater than the boosted intermediate voltage.
