# US 2020/0403443 A1 · Substation asset management method and apparatus based on power system reliability index

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0403443 A1
- Document ID: US20200403443A1
- Status: Published application
- Kind: A1
- Application number: 16/975,297
- Filed: 2019-07-10
- Published: 2020-12-24
- Earliest claimed: 2018-07-11
- Assignees: Hyosung Heavy Industries Corporation
- Applicants: Hyosung Heavy Industries Corporation
- Inventors: Hui Seok CHAI; Hwang Dong SEO; Jae Ryong JUNG
- Web page: https://patentgrep.com/patent/US20200403443A1

## CPC

- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- G06Q 50/06: Energy or water supply
- G06Q 50/10: Services
- H02J 13/333: the equipment forming part of substations
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y04S 10/16: Electric power substations
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A substation asset management method can include the steps of: determining whether to compensate a reliability model by element of the substation by comparing reliability of a reference reliability model by substation type with reliability depending on health index by element thereof generated based on state data and real-time monitoring data by element of the substation; compensating the reference reliability model by substation type and generating a unique reliability model by element of the substation as a result of the determination; evaluating system reliability and economic feasibility by maintenance scenario based on a reference system reliability model for each candidate element subject to maintenance among the elements of the substation; and drawing a maintenance scenario of the elements of the substation by using a fitness function of maintaining the substation based on the result drawn through the evaluation of the system reliability and the economic feasibility.

## Claims

### Claim 1

A substation asset management method based on a reliability index in a power system, comprising steps of:
(a) determining whether to compensate a reliability model by element of the substation by comparing reliability of a reference reliability model by substation type with reliability depending on health index by element thereof generated based on state data and real-time monitoring data by element of the substation;
(b) compensating the reference reliability model by substation type and generating a unique reliability model by element of the substation by using the health index by element of the substation as a result of the determination;
(c) evaluating system reliability and economic feasibility by maintenance scenario based on a pre-generated reference system reliability model for each candidate element subject to maintenance among the elements of the substation;
(d) drawing a maintenance scenario of the elements of the substation by using a fitness function of maintaining the substation based on the result drawn through the evaluation of the system reliability and the economic feasibility; and
(e) checking whether to perform maintenance and updating a unique reliability model by element of the substation while scheduling maintenance and estimating maintenance costs depending on the drawn maintenance scenario of the elements of the substation;
wherein the fitness function of maintaining the substation is based on system reliability indices.

### Claim 2 (depends on 1)

The method of claim 1, wherein the fitness function of maintaining the substation includes sensitivity of at least two system reliability indices, and the sum of weighted values of sensitivity of the system reliability index which becomes a maximum value is drawn as an optimal solution.

### Claim 3 (depends on 2)

The method of claim 2, wherein the fitness function of maintaining the substation is made under the following equation:
maximize
(
w
1

∑
i
,
j

r
ij

x
ij
+
w
2

∑
i
,
j

s
ij

x
ij
+
w
3

∑
i
,
j

t
ij

x
ij
)
wherein w is a weighted value for scaling a reliability index; xij is whether to adopt a j-th strategy for an i-th element; rij is sensitivity of a first reliability index of the j-th strategy for the i-th element; sij is sensitivity of a second reliability index of the j-th strategy for the i-th element; and tij is sensitivity of a third reliability index of the j-th strategy for the i-th element.

### Claim 4 (depends on 3)

The method of claim 3, wherein the weighted value is adjusted depending on a characteristic of a site of the substation.

### Claim 5 (depends on 1)

The method of claim 1, wherein, at the step (d), only a maintenance scenario fit for cost limitations after being applied for the maintenance is drawn.

### Claim 6 (depends on 2)

The method of claim 2, wherein the sum of weighted values of sensitivities of the system reliability indices that become maximum values is drawn as an optimal solution by using dynamic programming.

### Claim 7 (depends on 1)

The method of claim 1, wherein, at the step (c), by applying at least one of failure rate, failure recovery time, load by loading point, repair costs, recovery costs, target maintenance costs, interest rate, equipment sensitivity, and parent-child relationships between the elements of the substation to the pre-generated reference system reliability model, while system reliability, including power outage costs, value of lost load, sensitivity by element, is evaluated, economic feasibility including current value and future value is evaluated.

### Claim 8 (depends on 1)

The method of claim 1, wherein the step of (c) includes a step of selecting a candidate element subject to maintenance among the elements of the substation depending on prespecified priorities.

### Claim 9

A substation asset management apparatus based on a reliability index in a power system comprising:
a health index-generating unit for generating health index by element of the substation by using status data and real-time monitoring data by element of the substation;
a reference reliability model-managing unit for determining whether to compensate a reference reliability model by substation type and generating a unique reliability model by element of the substation based on the reference reliability model by substation type and health index by element of the substation;
a system reliability and economic feasibility-evaluating unit for evaluating system reliability and economic feasibility by maintenance scenario based on a pre-generated reference system reliability model for each candidate element subject to maintenance selected according to prespecified priorities;
a maintenance plan-generating unit for drawing a maintenance scenario of the elements of the substation by using a fitness function of maintaining the substation based on the result drawn through the evaluation of the system reliability and the economic feasibility; and
a maintenance plan-executing unit for checking whether to perform maintenance and updating a unique reliability model by element of the substation while scheduling maintenance and estimating maintenance costs depending on the drawn maintenance scenario of the elements of the substation;
wherein the fitness function of maintaining the substation is based on system reliability indices.

### Claim 10 (depends on 9)

The apparatus of claim 9, wherein the fitness function of maintaining the substation includes sensitivity of at least two system reliability indices, and the sum of weighted values of sensitivity of the system reliability indices which becomes maximum value is drawn as an optimal solution.

### Claim 11 (depends on 10)

The apparatus f claim 10, wherein the fitness function of maintaining the substation is made under the following equation:
maximize
(
w
1

∑
i
,
j

r
ij

x
ij
+
w
2

∑
i
,
j

s
ij

x
ij
+
w
3

∑
i
,
j

t
ij

x
ij
)
wherein w is a weighted value for scaling a reliability index; xij is whether to adopt a j-th strategy for an i-th element; rij is sensitivity of a first reliability index of the j-th strategy for the i-th element; sij is sensitivity of a second reliability index of the j-th strategy for the i-th element; tij is sensitivity of a third reliability index of the j-th strategy for the i-th element.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein the weighted value is adjusted depending on a characteristic of a site of the substation.

### Claim 13 (depends on 9)

The apparatus of claim 9, wherein upon drawing a maintenance scenario of the elements of the substation by using a fitness function of maintaining the substation based on the result drawn through the evaluation of the system reliability and the economic feasibility, the maintenance plan-generating unit draws only a maintenance scenario fit for cost limitations after being applied for the maintenance.

### Claim 14 (depends on 10)

The apparatus of claim 10, wherein the sum of weighted values of sensitivities of the system reliability indices that become maximum values is drawn as an optimal solution by using dynamic programming.