# US 2020/0403408 A1 · A communication-free decentralized control framework for unit commitment in microgrids

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0403408 A1
- Document ID: US20200403408A1
- Status: Published application
- Kind: A1
- Application number: 16/346,548
- Filed: 2018-10-12
- Published: 2020-12-24
- Earliest claimed: 2018-01-17
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Ulrich Muenz; Xiaofan Wu; Mohit Sinha; Joachim Bamberger
- Web page: https://patentgrep.com/patent/US20200403408A1

## CPC

- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/1323: {using optical fibres}
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems, methods, and computer-readable media are described for addressing the unit commitment problem in a power grid by providing a communication-free control framework according to which each power generating unit in the power grid determines its own operating schedule for turning on or off based solely on local measurements.

## Claims

### Claim 1

A method for decentralized unit commitment in a power system comprising a plurality of power generating units, the method comprising:
determining a load requirement on the power system; and
executing an operation schedule for power generation by the plurality of power generating units to meet the load requirement, wherein executing the operation schedule comprises executing, by the plurality of power generating units, a collection of subroutines that control a timing of active and inactive states of each of the plurality of power generating units based solely on local measurements made in the absence of wired and wireless communication between any of the plurality of power generating units;
wherein executing the operation schedule comprises executing one or more subroutines of the collection of subroutines to transition another power generating unit of the plurality of power generating units from the inactive state to the active state, and wherein executing the one or more subroutines comprises:
determining, by the first power generating unit, that a condition is met for requiring power generation support from the another power generating unit;
performing, by the first power generating unit, a change on the power system that is detected and measured by each of the plurality of power generating units;
determining, by a second power generating unit of the plurality of power generating units and based at least in part on the detected change on the power system and a transition rule, that the second power generating unit should transition to the active state; and
transitioning, by the second power generating unit, to the active state.

### Claim 2 (depends on 1)

The method of claim 1, wherein the condition for requiring power generation support from the another power generating unit comprises one of: i) a state-of-charge of the first power generating unit exceeding a maximum threshold state-of-charge or ii) a power output of the first power generating unit exceeding a maximum threshold power output.

### Claim 3 (depends on 1)

The method of claim 1, wherein the change on the power system is one of: i) an increase in a frequency of the power system above a nominal frequency of the power system or ii) a decrease in the frequency of the power system below the nominal frequency of the power system.

### Claim 4 (depends on 3)

The method of claim 3, wherein the second power generating unit is a first type of power generating unit if the change on the power system is the increase in the frequency of the power system above the nominal frequency, and wherein the second power generating unit is a second type of power generating unit if the change on the power system is the decrease in the frequency of the power system below the nominal frequency.

### Claim 5 (depends on 1)

The method of claim 1, wherein the transition rule comprises requiring that each of the plurality of power generating units wait a respective random amount of time for the change on the power system to be detected, and wherein determining, by the second power generating unit and based at least in part on the detected change on the power system and the transition rule, that the second power generating unit should transition to the active state comprises detecting, by the second power generating unit, the change on the power system at an expiration of the respective random amount of time that the second power generating unit waits.

### Claim 6 (depends on 1)

The method of claim 1, wherein the transition rule comprises requiring that each of the plurality of power generating units wait a respective predetermined amount of time for the change on the power system to be detected, and wherein determining, by the second power generating unit and based at least in part on the detected change on the power system and the transition rule, that the second power generating unit should transition to the active state comprises detecting, by the second power generating unit, the change on the power system at an expiration of the respective predetermined amount of time that the second power generating unit waits.

### Claim 7 (depends on 1)

The method of claim 1, wherein the plurality of power generating units comprises a first power generating unit in the active state, wherein executing the operation schedule comprises executing one or more subroutines of the collection of subroutines to transition the first power generating unit from the active state to the inactive state, and wherein executing the one or more subroutines comprises:
determining, by the first power generating unit, that a condition is met for attempting to transition from the active state to the inactive state; and
verifying, by the first power generating unit, whether the transition from the active state to the inactive state can occur at least in part by attempting to perform a change on the power system, wherein the change on the power system is detected and measured by each of the plurality of power generating units.

### Claim 8 (depends on 7)

The method of claim 7, wherein executing the one or more subroutines further comprises:
determining, by the first power generating unit, that the attempted change on the power system cannot be performed successfully; and
transitioning, by the first power generating unit, from the active state to the inactive state.

### Claim 9 (depends on 7)

The method of claim 7, wherein the condition for attempting to transition from the active state to the inactive state comprises one of: i) a state-of-charge of the first power generating unit falling below a minimum threshold state-of-charge or ii) a power output of the first power generating unit falling below a minimum threshold power output.

### Claim 10 (depends on 7)

The method of claim 7, wherein executing the one or more subroutines further comprises:
performing, by the first power generating unit, the change on the power system successfully;
detecting, by the first power generating unit, a power jump on the power system indicating that a second power generating unit of the plurality of power generating units has transitioned to the active state;
reversing, by the first power generating unit, the change on the power system;
attempting, by the first power generating unit, the change on the power system;
determining, by the first power generating unit, that the attempted change on the power system cannot be performed successfully; and
transitioning, by the first power generating unit, from the active state to the inactive state.

### Claim 11

A power system configured to implement a decentralized unit commitment framework, the power system comprising a plurality of power generating units, wherein a plurality of local controllers respectively corresponding to the plurality of power generating units is configured to:
determine a load requirement on the power system; and
execute an operation schedule for power generation by the plurality of power generating units to meet the load requirement, wherein executing the operation schedule comprises executing, by the plurality of local controllers, a collection of subroutines that control a timing of active and inactive states of each of the plurality of power generating units based solely on local measurements made in the absence of wired and wireless communication between any of the plurality of power generating units;
wherein executing the operation schedule comprises executing one or more subroutines of the collection of subroutines to transition another power generating unit of the plurality of power generating units from the inactive state to the active state, and wherein executing the one or more subroutines comprises:
determining, by a first local controller of the first power generating unit, that a condition is met for requiring power generation support from the another power generating unit;
performing, by the first local controller, a change on the power system that is detected and measured by each of the plurality of power generating units;
determining, by a second local controller of a second power generating unit of the plurality of power generating units and based at least in part on the detected change on the power system and a transition rule, that the second power generating unit should transition to the active state; and
transitioning, by the second local controller, the second power generating unit to the active state.

### Claim 12 (depends on 11)

The power system of claim 11, wherein the condition for requiring power generation support from the another power generating unit comprises one of: i) a state-of-charge of the first power generating unit exceeding a maximum threshold state-of-charge or ii) a power output of the first power generating unit exceeding a maximum threshold power output.

### Claim 13 (depends on 11)

The power system of claim 11, wherein the change on the power system is one of: i) an increase in a frequency of the power system above a nominal frequency of the power system or ii) a decrease in the frequency of the power system below the nominal frequency of the power system.

### Claim 14 (depends on 11)

The power system of claim 11, wherein the second power generating unit is a first type of power generating unit if the change on the power system is the increase in the frequency of the power system above the nominal frequency, and wherein the second power generating unit is a second type of power generating unit if the change on the power system is the decrease in the frequency of the power system below the nominal frequency.

### Claim 15 (depends on 11)

The power system of claim 11, wherein the transition rule comprises requiring that each of the plurality of power generating units wait a respective random amount of time for the change on the power system to be detected, and wherein determining, by the second local controller and based at least in part on the detected change on the power system and the transition rule, that the second power generating unit should transition to the active state comprises detecting, by the second local controller, the change on the power system at an expiration of the respective random amount of time that the second power generating unit waits.

### Claim 16 (depends on 11)

The power system of claim 11, wherein the transition rule comprises requiring that each of the plurality of power generating units wait a respective predetermined amount of time for the change on the power system to be detected, and wherein determining, by the second local controller and based at least in part on the detected change on the power system and the transition rule, that the second power generating unit should transition to the active state comprises detecting, by the second local controller, the change on the power system at an expiration of the respective predetermined amount of time that the second power generating unit waits.

### Claim 17 (depends on 11)

The power system of claim 11, wherein executing the one or more subroutines further comprises:
detecting, by the first local controller, a power jump on the power system indicating that the second power generating unit has transitioned to the active state; and
reversing, by the first local controller, the change on the power system.

### Claim 18 (depends on 11)

The power system of claim 11, wherein the plurality of power generating units comprises a first power generating unit in the active state, wherein executing the operation schedule comprises executing, by one or more of the plurality of local controllers, one or more subroutines of the collection of subroutines to transition the first power generating unit from the active state to the inactive state, and wherein executing the one or more subroutines comprises:
determining, by a first local controller of the first power generating unit, that a condition is met for attempting to transition from the active state to the inactive state; and
verifying, by the first local controller whether the transition from the active state to the inactive state can occur at least in part by attempting to perform a change on the power system, wherein the change on the power system is detected and measured by each of the plurality of power generating units.

### Claim 19 (depends on 18)

The power system of claim 18, wherein the condition for attempting to transition from the active state to the inactive state comprises one of: i) a state-of-charge of the first power generating unit falling below a minimum threshold state-of-charge or ii) a power output of the first power generating unit falling below a minimum threshold power output.

### Claim 20 (depends on 18)

The power system of claim 18, wherein executing the one or more subroutines further comprises:
performing, by the first local controller, the change on the power system successfully;
detecting, by the first local controller, a power jump on the power system indicating that a second power generating unit of the plurality of power generating units has transitioned to the active state;
reversing, by the first local controller, the change on the power system;
attempting, by the first local controller, the change on the power system;
determining, by the first local controller, that the attempted change on the power system cannot be performed successfully; and
transitioning, by the first local controller, from the active state to the inactive state.