# US 2020/0400016 A1 · Method and system for producing a foundation element in the ground

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0400016 A1
- Document ID: US20200400016A1
- Status: Published application
- Kind: A1
- Application number: 16/976,033
- Filed: 2019-01-17
- Published: 2020-12-24
- Earliest claimed: 2018-03-01
- Assignees: BAUER Spezialtiefbau GmbH
- Applicants: BAUER Spezialtiefbau GmbH
- Inventors: Hans REGLER
- Web page: https://patentgrep.com/patent/US20200400016A1

## CPC

- E02D 1/02: before construction work
- E02D 7/22: Placing by screwing down {(screw piles per se E02D5/56)}
- E02D 17/13: Foundation slots {or slits}; Implements for making these slots {or slits}
- E02D 5/22: Piles (sheet piles, {i.e. elements shaped to mutually lock or mate} E02D5/02; {pile shoes E02D5/72; foundations on piles E02D27/12, E02D27/20})
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

The invention relates to a method and a system for producing a foundation element in the ground by means of a construction apparatus, wherein by means of a ground working tool a hole is formed in the ground, in which the foundation element is produced, wherein by means of a control and evaluation unit at least one operating variable of the construction apparatus, which changes depending on a ground composition, is detected as a function of a working depth. According to the invention provision is made in that in the control and evaluation unit a ground profile to be expected is entered, which indicates a layer structure of the ground with ground layers of different ground composition, and in that by the control and evaluation unit the detected, at least one operating variable is set in correlation with the stated ground profile in order to establish, at which working depth a transition between ground layers of different ground composition is present.

## Claims

### Claim at position 1

-12. (canceled)

### Claim 13

A method for producing a foundation element in the ground by means of a construction apparatus,
wherein by means of a ground working tool a hole is formed in the ground, in which the foundation element is produced,
wherein by means of a control and evaluation unit at least one operating variable of the construction apparatus, which changes depending on a ground composition, is detected as a function of a working depth,
wherein
in the control and evaluation unit a ground profile to be expected is entered, which indicates a layer structure of the ground with ground layers of different ground composition, and
by the control and evaluation unit the detected, at least one operating variable is set in correlation with the entered ground profile in order to establish, at which working depth a transition between ground layers of different ground composition is present.

### Claim 14 (depends on 13)

The method according to claim 13,
wherein
by the control and evaluation unit a value to be expected of the at least one operating variable is ascertained for each ground layer of the entered ground profile.

### Claim 15 (depends on 13)

The method according to claim 13,
wherein
by the control and evaluation unit a current ground profile is created for the working location.

### Claim 16 (depends on 13)

The method according to claim 13,
wherein
several operating variables are detected and
the several operating variables are set in a correlation with one another, wherein a ground characteristic value is ascertained by the control and evaluation unit.

### Claim 17 (depends on 13)

The method according claim 13,
wherein
the at least one operating variable is detected by means of at least one detection means on the construction apparatus.

### Claim 18 (depends on 13)

The method according to claim 13,
wherein
the at least one operating variable is selected from the variables torque, rotational speed, power, feed force, feed speed, acceleration, energy input, vibrations, sound, hydraulic pressure and/or hydraulic flow.

### Claim 19 (depends on 13)

The method according to claim 13,
wherein
the control and evaluation unit has a database, in which operating variables and/or ground characteristic values are saved for specific ground layers.

### Claim 20 (depends on 13)

The method according to claim 13,
wherein
for ascertained operating variables, ground characteristic values saved for specific operating variables are queried and compared by the control and evaluation unit, wherein a current ground characteristic value is determined.

### Claim 21 (depends on 13)

The method according to claim 13,
wherein
on the basis of the ground characteristic values ascertained during ground working a ground profile is ascertained and saved by the control and evaluation unit.

### Claim 22 (depends on 13)

The method according to claim 13,
wherein
by the control and evaluation unit preferred operating variables for the current ground profile are ascertained over the working depth and stored as a dataset in the database.

### Claim 23 (depends on 13)

The method according to claim 13,
wherein
as ground working, a drilling with a drilling tool of a rotary drilling apparatus or a cutting with a diaphragm wall cutter is carried out.

### Claim 24 (depends on 13)

A system for producing a foundation element in the ground with a construction apparatus,
wherein by means of a ground working tool a hole is formed in the ground, in which the foundation element is produced,
wherein by means of a control and evaluation unit at least one operating variable of the construction apparatus, which changes depending on a ground composition, is detected as a function of a working depth,
wherein
the system is designed to carry out the method according to claim 13, wherein in the control and evaluation unit a ground profile to be expected can be entered, which indicates a layer structure of the ground with ground layers of different ground composition, and
by the control and evaluation unit the detected, at least one operating variable can be set in correlation with the entered ground profile in order to establish, at which working depth a transition between ground layers of different ground composition is present.
