# US 2020/0399851 A1 · Hollow Subsea Foundations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0399851 A1
- Document ID: US20200399851A1
- Status: Published application
- Kind: A1
- Application number: 16/907,148
- Filed: 2020-06-19
- Published: 2020-12-24
- Earliest claimed: 2019-06-21
- Assignees: Subsea 7 Norway AS
- Applicants: Subsea 7 Norway AS
- Inventors: Christian Linde Olsen; Stylianos Panayides
- Web page: https://patentgrep.com/patent/US20200399851A1

## CPC

- E02D 27/525: {using elements penetrating the underwater ground (sinking work pieces E02D15/08, sinking caissons E02D23/02)}
- E02D 5/24: Prefabricated piles
- E02D 7/00: Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; {accessories for coupling driver to piles or the like E02D13/10; for trees or other plants A01G17/16; placing posts E04H17/26})
- E02D 7/20: Placing by pressure or pulling power
- E02D 15/08: Sinking workpieces into water or soil {inasmuch as not provided for elsewhere}
- E02D 29/06: {Constructions, or methods of constructing, in water (E02D15/00 takes precedence; submerged foundations E02D27/52)}
- E02B 2017/0078: {Suction piles, suction cans}
- E02D 2250/00: Production methods
- E02D 2250/0053: using suction or vacuum techniques
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)

## Abstract

A method of installing an upright elongate hollow subsea foundation that is higher than it is wide, such as a suction pile. The foundation is at least partially embedded in seabed soil. A partition layer is placed within the foundation, for example by injecting a grout, supported by a plug of soil that is surrounded by the foundation. The partition layer is placed on the plug of soil at a level that is spaced from the top of the foundation by at least 20% of the height of the foundation. Above the partition layer, the interior of the foundation may be filled with water and/or a rigid body, such as a solid mass or a hollow liquid-filled tank.

## Claims

### Claim 1

A method of installing an upright elongate hollow subsea foundation that is higher than it is wide, the method comprising:
at least partially embedding the foundation in seabed soil; and
placing a partition layer within a flooded interior of the foundation, supported by a plug of the soil that is surrounded by a wall of the foundation;
wherein the partition layer is placed on the plug of soil within the foundation at a level that is spaced from the top of the foundation by at least 20% of the height of the foundation.

### Claim 2 (depends on 1)

The method of claim 1, comprising engaging the partition layer with the surrounding wall of the foundation.

### Claim 3 (depends on 1)

The method of claim 1, comprising shortening the plug by excavating soil from the plug before placing the partition layer on the plug.

### Claim 4 (depends on 3)

The method of claim 3, comprising excavating the soil from the plug to a level below that of the seabed surrounding the foundation.

### Claim 5 (depends on 3)

The method of claim 3, comprising excavating the soil from the plug from within the foundation after embedding the foundation.

### Claim 6 (depends on 5)

The method of claim 5, comprising excavating the soil from the plug while the foundation remains substantially stationary relative to the surrounding seabed.

### Claim 7 (depends on 3)

The method of claim 3, comprising shortening the plug before embedding the foundation by:
excavating a cavity in the seabed soil to below the level of the seabed surrounding the cavity; and
embedding the foundation into the seabed soil within the cavity.

### Claim 8 (depends on 7)

The method of claim 7, further comprising infilling the cavity around the embedded foundation.

### Claim 9 (depends on 1)

The method of claim 1, comprising embedding the foundation under its self-weight.

### Claim 10 (depends on 1)

The method of claim 1, comprising embedding the foundation by generating an underpressure within the foundation.

### Claim 11 (depends on 1)

The method of claim 1, comprising placing the partition layer by introducing a flow of grout into the foundation and then curing the grout.

### Claim 12 (depends on 1)

The method of claim 1, comprising placing the partition layer by lowering a slab into the foundation.

### Claim 13 (depends on 1)

The method of claim 1, comprising placing the partition layer beneath a rigid body that occupies an upper portion of the interior of the foundation.

### Claim 14 (depends on 13)

The method of claim 13, wherein the partition layer is in supporting contact with the rigid body.

### Claim 15 (depends on 13)

The method of claim 13, wherein the rigid body is a solid mass or a hollow chamber.

### Claim 16 (depends on 13)

The method of claim 13, comprising directing a flowable material through the rigid body to form the partition layer.

### Claim 17 (depends on 1)

The method of claim 1, further comprising supporting a subsea structure on the foundation.

### Claim 18 (depends on 17)

The method of claim 17, comprising resting the structure on the wall of the foundation.

### Claim 19 (depends on 18)

The method of claim 18, comprising clamping the structure to the wall of the foundation.

### Claim 20 (depends on 17)

The method of claim 17, comprising supporting the structure on the partition layer within the foundation.

### Claim 21 (depends on 20)

The method of claim 20, comprising lowering at least one supporting leg of the structure into the foundation and into contact with the partition layer.

### Claim 22 (depends on 20)

The method of claim 20, comprising interposing at least one supporting leg between the structure and the partition layer.

### Claim 23 (depends on 21)

The method of claim 21, comprising adjusting the length of the or each supporting leg.

### Claim 24 (depends on 1)

The method of claim 1, comprising placing the partition layer at a level that is spaced from the top of the foundation by no more than half of the height of the foundation.

### Claim 25 (depends on 1)

The method of claim 1, comprising placing the partition layer at a level that is spaced from the top of the foundation by at least one third of the height of the foundation.

### Claim 26

An elongate hollow foundation at least partially embedded in seabed soil in an upright orientation, the foundation being higher than it is wide, wherein the foundation contains a partition layer supported by a plug of soil that is surrounded by a wall of the foundation, the partition layer being at a level that is spaced from the top of the foundation by at least 20% of the height of the foundation.

### Claim 27 (depends on 26)

The foundation of claim 26, being at least twice as high as it is wide.

### Claim 28 (depends on 26)

The foundation of claim 26, wherein the partition layer is at a level that is spaced from the top of the foundation by no more than half of the height of the foundation.

### Claim 29 (depends on 26)

The foundation of claim 26, wherein the partition layer is at a level that is spaced from the top of the foundation by at least one third of the height of the foundation.

### Claim 30 (depends on 26)

The foundation of claim 26, wherein the partition layer is engaged with the surrounding wall of the foundation.

### Claim 31 (depends on 26)

The foundation of claim 26, wherein the top of the plug is at a level below that of the seabed surrounding the foundation.

### Claim 32 (depends on 26)

The foundation of claim 26, wherein the partition layer comprises a cured grout.

### Claim 33 (depends on 26)

The foundation of claim 26, wherein the partition layer comprises a discrete slab.

### Claim 34 (depends on 26)

The foundation of claim 26, wherein the partition layer lies beneath a rigid body that occupies an upper portion of the interior of the foundation.

### Claim 35 (depends on 34)

The foundation of claim 34, wherein the partition layer is in supporting contact with the rigid body.

### Claim 36 (depends on 34)

The foundation of claim 34, wherein the rigid body is a solid mass or a hollow chamber.

### Claim 37 (depends on 34)

The foundation of claim 34, wherein the rigid body is penetrated by a passageway extending from a top face of the rigid body to a bottom face of the rigid body.

### Claim 38 (depends on 26)

The foundation of claim 26, wherein the foundation is a suction pile and the partition layer is spaced from the top plate of the pile.

### Claim 39

A combination comprising:
an elongate hollow foundation at least partially embedded in seabed soil in an upright orientation, the foundation being higher than it is wide, wherein the foundation contains a partition layer supported by a plug of soil that is surrounded by a wall of the foundation, the partition layer being at a level that is spaced from the top of the foundation by at least 20% of the height of the foundation; and
a subsea structure supported by the foundation.

### Claim 40 (depends on 39)

The combination of claim 39, wherein the structure rests on the wall of the foundation.

### Claim 41 (depends on 40)

The combination of claim 40, wherein the structure is clamped to the wall of the foundation.

### Claim 42 (depends on 39)

The combination of claim 39, wherein the structure is supported on the partition layer within the foundation.

### Claim 43 (depends on 42)

The combination of claim 42, wherein at least one supporting leg of the structure extends into the foundation and into contact with the partition layer.

### Claim 44 (depends on 42)

The combination of claim 42, comprising at least one supporting leg interposed between the structure and the partition layer.

### Claim 45 (depends on 43)

The combination of claim 43, wherein the length of the or each supporting leg is adjustable.

### Claim 46 (depends on 39)

The combination of claim 39, wherein the structure extends above the foundation.

### Claim 47 (depends on 39)

The combination of claim 39, wherein the structure extends laterally or horizontally beyond an outer diameter of the foundation.
