# US 2020/0396767 A1 · Frame-based equipment framework for new radio systems operating on unlicensed bands

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0396767 A1
- Document ID: US20200396767A1
- Status: Published application
- Kind: A1
- Application number: 17/003,858
- Filed: 2020-08-26
- Published: 2020-12-17
- Earliest claimed: 2019-08-27
- Assignees: Intel Corporation
- Applicants: Intel Corporation
- Inventors: Salvatore Talarico; Yongjun Kwak; Yingyang Li; Carlos H. Aldana
- Web page: https://patentgrep.com/patent/US20200396767A1

## CPC

- H04W 74/0808: using carrier sensing, e.g. carrier sense multiple access [CSMA]
- H04W 16/14: Spectrum sharing arrangements {between different networks}
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

An apparatus of a User Equipment (UE), a computer-readable media, and a method. The apparatus includes one or more processors to: determine a time gap between an end of a downlink (DL) transmission burst from a gNB and a beginning of a following uplink (UL) transmission burst from the UE within a channel operating time (COT) of the FFP; in response to a determination that the time gap is less than or equal to 16 μs, perform a CAT-1 listen-before-talk (LBT) operation to gain access to an operating channel; in response to a determination that the time gap is more than 16 μs, perform a CAT-2 LBT operation to gain access to the operating channel; and cause the UE to transmit the UL transmission burst to the gNB on the operating channel and within a fixed frame period after performing the CAT-1 or CAT-2 LBT operation.

## Claims

### Claim 1

An apparatus of a User Equipment (UE), the apparatus including a memory; and one or more processors coupled to the memory and configured to:
determine whether a fixed frame period (FFP) for communication with a New Radio (NR) evolved Node B (gNB) on an operating channel of an unlicensed band is valid;
determine a time gap between an end of a downlink (DL) transmission burst from the gNB and a beginning of a following uplink (UL) transmission burst from the UE within a channel operating time (COT) of the FFP;
in response to a determination that the time gap is less than or equal to 16 μs, perform a CAT-1 listen-before-talk (LBT) operation to gain access to the operating channel;
in response to a determination that the time gap is more than 16 μs, perform a CAT-2 LBT operation to gain access to the operating channel; and
cause the UE to transmit the UL transmission burst to the gNB on the operating channel and within the FFP if the FFP is valid and after performing the CAT-1 or CAT-2 LBT operation.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the one or more processors are to perform the CAT-1 LBT operation or the CAT-2 LBT operation in response to a determination that the FFP is valid.

### Claim 3 (depends on 1)

The apparatus of claim 1, wherein a time corresponding to a last 5% of the COT or 100 μs corresponds to an idle period during which no transmissions are to occur.

### Claim 4 (depends on 1)

The apparatus of claim 1, wherein the one or more processors are to process a transmission from the gNB including an indication of a configuration of the FFP, and to determine the configuration from the transmission including the indication of a configuration of the FFP.

### Claim 5 (depends on 4)

The apparatus of claim 4, wherein the transmission of the configuration of the FFP includes a “tdd-UL-DL-ConfigurationCommon” field in a system information block (SIB) transmission to indicate a length of the FFP.

### Claim 6 (depends on 4)

The apparatus of claim 4, wherein the FFP corresponds to a set of values including 2, 2.5, 5, and 10 ms.

### Claim 7 (depends on 4)

The apparatus of claim 4, wherein the transmission of the configuration of the FFP is a system information block (SIB) transmission including a frame based equipment (FBE) starting offset value to indicate a starting position of the FFP.

### Claim 8 (depends on 1)

The apparatus of claim 1, wherein the one or more processors are to process a transmission from the gNB to indicate one of a frame-based equipment (FBE) or a load-based equipment (LBE) mode of operation, wherein the transmission to indicate one of a FBE or a LBE mode of operation includes a field in a system information block (SIB) transmission.

### Claim 9 (depends on 8)

The apparatus of claim 8, where the field indicates a length of the FFP corresponding to a set of values including 2, 5 and 10.

### Claim 10 (depends on 1)

The apparatus of claim 1, wherein a starting position of the FFP is to align with a boundary of a radio frame for communication in the operating channel.

### Claim 11 (depends on 1)

The apparatus of claim 1, further including a Radio Frequency (RF) circuitry and one or more antennas coupled to the RF circuitry to transmit the UL transmission burst.

### Claim 12

A method to be performed at an apparatus of a User Equipment (UE), the method including:
determining whether a fixed frame period (FFP) for communication with a New Radio (NR) evolved Node B (gNB) on an operating channel of an unlicensed band is valid;
determining a time gap between an end of a downlink (DL) transmission burst from the gNB and a beginning of a following uplink (UL) transmission burst from the UE within a channel operating time (COT) of the FFP;
in response to a determination that the time gap is less than or equal to 16 μs, performing a CAT-1 listen-before-talk (LBT) operation to gain access to the operating channel;
in response to a determination that the time gap is more than 16 μs, performing a CAT-2 LBT operation to gain access to the operating channel; and
causing the UE to transmit the UL transmission burst to the gNB on the operating channel and within the FFP if the FFP is valid and after performing the CAT-1 or CAT-2 LBT operation.

### Claim 13 (depends on 12)

The method of claim 12, wherein a time corresponding to a last 5% of the COT or 100 μs corresponds to an idle period during which no transmissions are to occur.

### Claim 14 (depends on 12)

The method of claim 12, further including processing a transmission from the gNB including an indication of a configuration of the FFP, and determining the configuration from the transmission including the indication of a configuration of the FFP, wherein the transmission of the configuration of the FFP includes a “tdd-UL-DL-ConfigurationCommon” field in a system information block (SIB) transmission to indicate a length of the FFP.

### Claim 15 (depends on 12)

The method of claim 12, further including processing a transmission from the gNB including an indication of a configuration of the FFP, and determining the configuration from the transmission including the indication of a configuration of the FFP, wherein the FFP corresponds to a set of values including 2, 2.5, 5, and 10 ms.

### Claim 16 (depends on 12)

The method of claim 12, further including processing a transmission from the gNB including an indication of a configuration of the FFP, and determining the configuration from the transmission including the indication of a configuration of the FFP, wherein the transmission of the configuration of the FFP is a system information block (SIB) transmission including a frame based equipment (FBE) starting offset value to indicate a starting position of the FFP.

### Claim 17 (depends on 12)

The method of claim 12, further including processing a transmission from the gNB to indicate one of a frame-based equipment (FBE) or a load-based equipment (LBE) mode of operation, wherein the transmission to indicate one of a FBE or a LBE mode of operation includes a field in a system information block (SIB) transmission.

### Claim 18 (depends on 12)

The method of claim 12, wherein a starting position of the FFP is to align with a boundary of a radio frame for communication in the operating channel

### Claim 19

One or more non-transitory computer-readable media comprising instructions to cause an apparatus of a User Equipment (UE), upon execution of the instructions by one or more processors of the apparatus, to perform operations including:
determining whether a fixed frame period (FFP) for communication with a New Radio (NR) evolved Node B (gNB) on an operating channel of an unlicensed band is valid;
determining a time gap between an end of a downlink (DL) transmission burst from the gNB and a beginning of a following uplink (UL) transmission burst from the UE within a channel operating time (COT) of the FFP;
in response to a determination that the time gap is less than or equal to 16 μs, performing a CAT-1 listen-before-talk (LBT) operation to gain access to the operating channel;
in response to a determination that the time gap is more than 16 μs, performing a CAT-2 LBT operation to gain access to the operating channel; and
causing the UE to transmit the UL transmission burst to the gNB on the operating channel and within the FFP if the FFP is valid and after performing the CAT-1 or CAT-2 LBT operation.

### Claim 20 (depends on 19)

The computer-readable media of claim 19, wherein a time corresponding to a last 5% of the COT or 100 μs corresponds to an idle period during which no transmissions are to occur.

### Claim 21 (depends on 19)

The computer-readable media of claim 19, the operations further including processing a transmission from the gNB including an indication of a configuration of the FFP, and determining the configuration from the transmission including the indication of a configuration of the FFP, wherein the transmission of the configuration of the FFP includes a “tdd-UL-DL-ConfigurationCommon” field in a system information block (SIB) transmission to indicate a length of the FFP.

### Claim 22 (depends on 19)

The computer-readable media of claim 19, the operations further including processing a transmission from the gNB including an indication of a configuration of the FFP, and determining the configuration from the transmission including the indication of a configuration of the FFP, wherein the FFP corresponds to a set of values including 2, 2.5, 5, and 10 ms.

### Claim 23

An apparatus of a New Radio (NR) evolved Node B (gNB), the apparatus including:
means for causing the gNB to perform a listen-before-talk (LBT) operation, by sensing whether an operating channel of an unlicensed band is idle, in order to gain access to the operating channel within a fixed frame period (FFP);
means for, in response to a determination that the LBT operation is successful, obtaining a channel occupancy time (COT) during a valid FFP for transmission and reception on the operating channel; and
means for causing the gNB to transmit downlink (DL) transmission bursts within the valid FFP immediately after sensing the operating channel to be idle, wherein a time corresponding to a last 5% of the COT or 100 μs corresponds to an idle period during which no transmissions are to occur.

### Claim 24 (depends on 23)

The apparatus of claim 23, further including means for, in response to a determination that the LBT operation is not successful, causing the gNB to drop any transmissions corresponding to an invalid FFP.

### Claim 25 (depends on 23)

The apparatus of claim 23, further including means for causing a transmission from the gNB to a user equipment (UE) of a configuration of the FFP.
