# US 2020/0396165 A1 · A control apparatus, communication control method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0396165 A1
- Document ID: US20200396165A1
- Status: Published application
- Kind: A1
- Application number: 16/971,811
- Filed: 2019-03-01
- Published: 2020-12-17
- Earliest claimed: 2018-03-02
- Assignees: NEC Corporation
- Applicants: NEC Corporation
- Inventors: Kojiro KURIHARA
- Web page: https://patentgrep.com/patent/US20200396165A1

## CPC

- H04L 41/5019: Ensuring fulfilment of SLA
- H04L 41/142: using statistical or mathematical methods
- H04L 43/0876: Network utilisation, e.g. volume of load or congestion level
- H04L 47/10: Flow control; Congestion control
- H04L 47/12: Avoiding congestion; Recovering from congestion
- H04L 67/14: Session management (for real-time applications in data packet communications networks H04L65/1066)
- H04L 67/60: Scheduling or organising the servicing of application requests, e.g. requests for application data transmissions using the analysis and optimisation of the required network resources (admission control or resource allocation H04L47/70)
- H04N 21/222: Secondary servers, e.g. proxy server, cable television Head-end {(provisioning of proxy services in data packet switching networks H04L67/56)}
- H04N 21/64738: {Monitoring network characteristics, e.g. bandwidth, congestion level (data switched network analysis H04L41/14; monitoring functioning in data switched networks H04L43/0817; flow control in packet networks H04L47/10)}
- H04N 21/64784: {Data processing by the network (data processing in packet switching systems H04L12/56; flow control in packet networks H04L47/10; intermediate storage or scheduling H04L49/90; provisioning of proxy services in data packet switching networks H04L67/56)}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04N: PICTORIAL COMMUNICATION, e.g. TELEVISION

## Abstract

A control apparatus is arranged in a predetermined network and comprises: a reception part which receives communication traffic, a transmission part which executes a transmission processing transmitting the communication traffic to a destination side, a traffic analysis part which counts a number of communication sessions within predetermined time period, included in the communication traffic, and a transmission management part which holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the network becomes an off-peak state, when the number of communication sessions exceeds a predetermined session number threshold.

## Claims

### Claim 1

A control apparatus arranged in a predetermined network, the apparatus comprising:
a reception part which receives communication traffic;
a transmission part which executes a transmission processing transmitting the communication traffic to a destination side;
a traffic analysis part which counts a number of communication sessions within a predetermined time period, included in the communication traffic; and
a transmission management part which holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the network becomes an off-peak state, when the number of communication sessions exceeds a predetermined session number threshold.

### Claim 2 (depends on 1)

The control apparatus according to claim 1, wherein
the traffic analysis part counts the number of communication sessions for each data transmission source.

### Claim 3 (depends on 1)

The control apparatus according to claim 1, wherein
the traffic analysis part counts the number of communication sessions for each domain of a data transmission source.

### Claim 4 (depends on 1)

The control apparatus according to claim 1, wherein
the traffic analysis part determines whether or not the network is in the off-peak state, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the traffic analysis part determines that the network becomes the off-peak state, when the number of communication sessions exceeds the session number threshold.

### Claim 5 (depends on 1)

The control apparatus according to claim 1, further comprising:
a storage part which stores information indicating a data transmission source and the session number threshold in association with each other, wherein
the traffic analysis part acquires the session number threshold corresponding to the data transmission source from the storage part, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the network becomes the off-peak state, when the number of communication sessions exceeds the acquired session number threshold.

### Claim 6 (depends on 5)

The control apparatus according to claim 5, wherein
the storage part stores information indicating an expected off-peak time zone,
the traffic analysis part determines that the network is in the off-peak state when start time of the expected off-peak time zone is exceeded, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the start time of the expected off-peak time zone is exceeded, when the number of communication sessions exceeds the session number threshold.

### Claim 7 (depends on 6)

The control apparatus according to claim 6, wherein
the storage part stores information indicating the expected off-peak time zone and information regarding to a communication usage band range in association with each other, and
the transmission management part causes the transmission part to execute the transmission processing at the expected off-peak time zone, estimates an expected unused time zone based on the expected off-peak time zone and the information regarding the communication usage band range, causes the transmission part to interrupt the transmission processing when the expected unused band range is used by exceeding a predetermined size at the expected off-peak time zone, and cause the transmission part to restart execution of the transmission processing at a next expected off-peak time zone.

### Claim 8

A communication control method, comprising:
receiving communication traffic in a predetermined network;
counting a number of communication sessions within a predetermined time period, included in the communication traffic; and
holding the communication traffic and restraining a process of transmitting the communication traffic to a destination side until the network becomes an off-peak state, when the number of communication sessions exceeds a predetermined session number threshold.

### Claim 9

A non-transient computer-readable storage medium storing a program for causing a computer configured to control a control apparatus to execute processes, the processes comprising:
a process of receiving communication traffic in a predetermined network;
a process of counting a number of communication sessions within a predetermined time period, included in the communication traffic; and
a process of holding the communication traffic and restraining a process of transmitting the communication traffic to a destination side until the network becomes an off-peak state, when the number of communication sessions exceeds a predetermine session number threshold.

### Claim 10 (depends on 2)

The control apparatus according to claim 2, wherein
the traffic analysis part counts the number of communication sessions for each domain of a data transmission source.

### Claim 11 (depends on 2)

The control apparatus according to claim 2, wherein
the traffic analysis part determines whether or not the network is in the off-peak state, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the traffic analysis part determines that the network becomes the off-peak state, when the number of communication sessions exceeds the session number threshold.

### Claim 12 (depends on 3)

The control apparatus according to claim 3, wherein
the traffic analysis part determines whether or not the network is in the off-peak state, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the traffic analysis part determines that the network becomes the off-peak state, when the number of communication sessions exceeds the session number threshold.

### Claim 13 (depends on 2)

The control apparatus according to claim 2, further comprising:
a storage part which stores information indicating a data transmission source and the session number threshold in association with each other, wherein
the traffic analysis part acquires the session number threshold corresponding to the data transmission source from the storage part, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the network becomes the off-peak state, when the number of communication sessions exceeds the acquired session number threshold.

### Claim 14 (depends on 13)

The control apparatus according to claim 13, wherein
the storage part stores information indicating an expected off-peak time zone,
the traffic analysis part determines that the network is in the off-peak state when start time of the expected off-peak time zone is exceeded, and
the transmission management part holds the communication traffic and causes the transmission part to restrain execution of the transmission processing until the start time of the expected off-peak time zone is exceeded, when the number of communication sessions exceeds the session number threshold.

### Claim 15 (depends on 14)

The control apparatus according to claim 14, wherein
the storage part stores information indicating the expected off-peak time zone and information regarding to a communication usage band range in association with each other, and
the transmission management part causes the transmission part to execute the transmission processing at the expected off-peak time zone, estimates an expected unused time zone based on the expected off-peak time zone and the information regarding the communication usage band range, causes the transmission part to interrupt the transmission processing when the expected unused band range is used by exceeding a predetermined size at the expected off-peak time zone, and cause the transmission part to restart execution of the transmission processing at a next expected off-peak time zone.

### Claim 16 (depends on 8)

The communication control method according to claim 8, wherein
said counting a number of communication sessions within a predetermined time period, included in the communication traffic, is performed by counting the number of communication sessions for each data transmission source.

### Claim 17 (depends on 8)

The communication control method according to claim 8, wherein
said counting a number of communication sessions within a predetermined time period, included in the communication traffic, is performed by counting the number of communication sessions for each domain of a data transmission source.

### Claim 18 (depends on 8)

The communication control method according to claim 8, wherein the method further comprises:
determining whether or not the network is in the off-peak state, and
holding the communication traffic and restraining execution of the transmission processing until the traffic analysis part determines that the network becomes the off-peak state, when the number of communication sessions exceeds the session number threshold.

### Claim 19 (depends on 8)

The communication control method according to claim 8, further comprising:
storing, by a storage part, information indicating a data transmission source and the session number threshold in association with each other, wherein
acquiring, by a traffic analysis part, the session number threshold corresponding to the data transmission source from the storage part, and
holding, by a transmission management part, the communication traffic and causes the transmission part to restrain execution of the transmission processing until the network becomes the off-peak state, when the number of communication sessions exceeds the acquired session number threshold.

### Claim 20 (depends on 19)

The communication control method according to claim 19, wherein the method further comprises:
storing, by the storage part, information indicating an expected off-peak time zone,
determining, by the traffic analysis part, that the network is in the off-peak state when start time of the expected off-peak time zone is exceeded, and
holding, by the transmission management part, the communication traffic and causes the transmission part to restrain execution of the transmission processing until the start time of the expected off-peak time zone is exceeded, when the number of communication sessions exceeds the session number threshold.
