# US 2020/0395759 A1 · Solar power system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0395759 A1
- Document ID: US20200395759A1
- Status: Published application
- Kind: A1
- Application number: 16/680,681
- Filed: 2019-11-12
- Published: 2020-12-17
- Earliest claimed: 2018-11-21
- Assignees: Black & Decker Inc.
- Applicants: Black & Decker Inc.
- Inventors: Stephen P. Osborne; Dharmendra Rathod
- Web page: https://patentgrep.com/patent/US20200395759A1

## CPC

- H02J 3/381: {Dispersed generators}
- H02J 1/14: Balancing load and power generation in DC networks
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 7/35: with light sensitive cells
- H02J 7/865: {Battery or charger load switching, e.g. concurrent charging and load supply (H02J7/50 takes precedence)}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/13: characterised by the transmission of data to equipment in the power network
- H02S 40/30: Electrical components
- H02S 40/32: comprising DC/AC inverter means associated with the PV module itself, e.g. AC modules
- H02S 40/38: Energy storage means, e.g. batteries, structurally associated with PV modules
- H02S 50/00: Monitoring or testing of PV systems, e.g. load balancing or fault identification
- H02J 2101/25: {involving maximum power point tracking control for photovoltaic sources}
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 70/30: Systems combining energy storage with energy generation of non-fossil origin
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02S: GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES (obtaining electrical energy from radioactive sources G21H1/12; light sensitive inorganic semiconductor devices H10F; light sensitive organic semiconductor devices H10K30/00; thermoelectric devices H10N10/00; pyroelectric devices H10N15/00)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A solar power system and method of operation includes a solar array, a plurality of loads electrically coupled in parallel to the solar array, and a control circuit electrically coupled to the solar array and in communication with the loads. The control circuit is configured to cause the solar array to operate at a maximum power point (MPP), prioritize power requirements of the loads, and variably allocate power from the solar array among the loads according to the prioritized power requirements of the loads.

## Claims

### Claim 1

A solar power system comprising:
a solar array;
a plurality of loads electrically coupled in parallel to the solar array;
a control circuit electrically coupled to the solar array and in communication with the loads, wherein the control circuit is configured to cause the solar array to operate at a maximum power point (MPP), prioritize power requirements of the loads, and variably allocate power from the solar array among the loads according to the prioritized power requirements of the loads.

### Claim 2 (depends on 1)

The solar power system of claim 1, wherein the control circuit is configured to assign a first priority multiplier to the first load and a second priority multiplier to the second load based on power requirements of each of the first and second loads and to allocate power from the solar array among the first and second loads according to the priority multipliers.

### Claim 3 (depends on 2)

The solar power system of claim 2, wherein the control circuit is configured to assign a lower priority multiplier to the load requiring less power and a higher priority multiplier to the load requiring greater power.

### Claim 4 (depends on 2)

The solar power system of claim 2, wherein the first load is an electrically powered device and the second load is a battery.

### Claim 5 (depends on 4)

The solar power system of claim 4, wherein the control circuit is configured to assign the second multiplier to be zero and the first multiplier to be greater than zero when 100% of power is required for the electrically powered device.

### Claim 6 (depends on 5)

The solar power system of claim 5, wherein the control circuit is configured to assign the first multiplier to be zero and the second multiplier to be greater than zero when no power is required for the electrically powered device.

### Claim 7 (depends on 4)

The solar power system of claim 4, wherein the control circuit is configured to assign the second multiplier to be lower and the first multiplier to be higher when power is required for both the electrically powered device and the battery and the battery is charged to at least a threshold amount of its capacity.

### Claim 8 (depends on 7)

The solar power system of claim 7, wherein the control circuit is configured to assign the second multiplier to be greater and the first multiplier to be lower when power is required for both the electrically powered device and the battery, the battery is charged to less than the threshold amount of its capacity, and the battery priority is higher than the electrically powered device.

### Claim 9 (depends on 8)

The solar power system of claim 8, control circuit is configured to assign the second multiplier to be greater and the first multiplier to be lower when power is required for both the electrically powered device and the battery, the battery is charged to less than the threshold amount of its capacity, and the battery priority is lower than the electrically powered device.

### Claim 10 (depends on 1)

The solar power system of claim 1, wherein the second load is an AC electrical power grid and the control circuit is configured to assign a first priority multiplier to the first load and a second priority multiplier to the second load based on power requirements of the first load and a price of power on the AC electrical power grid and to allocate power from the solar array among the first and second loads according to the priority multipliers

### Claim 11 (depends on 10)

The solar power system of claim 10, wherein the control circuit is configured to assign the second multiplier to be zero and the first multiplier to be greater than zero when 100% of power is required for the first load.

### Claim 12 (depends on 11)

The solar power system of claim 11, wherein the control circuit is configured to assign the first multiplier to be zero and the second multiplier to be greater than zero when no power is required for the first load.

### Claim 13 (depends on 10)

The solar power system of claim 10, wherein the control circuit is configured to assign the first multiplier to be lower and the second multiplier to be greater when a first threshold value corresponding an amount of power required by the DC powered load is lower than a second threshold value corresponding to a price of power on the AC electrical power grid.

### Claim 14 (depends on 13)

The solar power system of claim 13, wherein the control circuit is configured to assign the first multiplier to be higher and the second multiplier to be lower when the first threshold is higher than the second threshold value.

### Claim 15 (depends on 10)

The solar power system of claim 10, wherein the control circuit is configured to assign the first and second multipliers according to a mathematical relationship between an amount of power required by the first load and the price of power on the AC power grid.

### Claim 16 (depends on 1)

The solar power system of claim 1, wherein the control circuit comprises a controller and at least one of a DC/DC converter and an inverter electrically coupling the solar array to the loads.

### Claim 17 (depends on 16)

The solar power system of claim 16, further comprising one or more communications modules configured to communicate operational parameters among the controller, the at least one of a DC/DC converter and the inverter, and the loads.

### Claim 18 (depends on 1)

The solar power system of claim 1, wherein the control circuit includes a controller configured to perform maximum power point tracking (MPPT) in order to cause the solar array to operate at least at 90% of maximum peak power by implementing a power division MPPT algorithm that performs MPPT in accordance with the prioritized power requirements of each of the loads.

### Claim 19 (depends on 18)

The solar power system of claim 18, wherein the controller is configured to implement the power division MPPT algorithm by: (a) setting an initial amount of current to be drawn by the each of the loads; (b) drawing a total of the initial current for each load from the solar array; (c) sensing a voltage of the solar array when the total current is drawn from the solar array; (d) calculating a total power drawn from the solar array as a product of the total current and the voltage; (e) increasing, in a stepwise manner, the amount of current drawn by each load until the total power drawn from the solar array is less than an immediately preceding total power drawn by the solar array; and (f) decreasing, in a stepwise manner, the amount of current drawn by each load until the total power drawn from the solar array is less than an immediately preceding total power drawn by the solar array.

### Claim 20 (depends on 19)

The solar power system of claim 19, wherein increasing, in a stepwise, manner the amount of current drawn by each load includes increasing the current for each load as a function of the initial current and the priority multiplier for each load.

### Claim 21 (depends on 20)

The solar power system of claim 20, wherein the amount of stepwise current increase for each load is determined by the equation
Istep=x*z*(yn/ytotal)*In
where Istep is the amount of current increase, x is an MPPT slope, z is a ratio balance slope, yn is the priority multiplier for the load, ytotal is the sum of the priority multipliers for all of the loads, and In is the initial current for the load.

### Claim 22 (depends on 20)

The solar power system of claim 20, wherein decreasing, in a stepwise, manner the amount of current drawn by each load includes decreasing the current for each load as a function of the initial current and the priority multiplier for each load.

### Claim 23 (depends on 22)

The solar power system of claim 22, wherein the amount of stepwise current decrease for each load is determined by the equation
Istep=x*z*(yn/ytotal)*In
where Istep is the amount of current increase, x is a MPPT slope, z is a ratio balance slope, yn is the priority multiplier for the load, ytotal is the sum of the priority multipliers for all of the loads, and In is the initial current for the load.