# US 2020/0394744 A1 · Method and system for predicting a port-stay duration of a vessel at a port

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0394744 A1
- Document ID: US20200394744A1
- Status: Published application
- Kind: A1
- Application number: 16/968,394
- Filed: 2019-03-28
- Published: 2020-12-17
- Earliest claimed: 2018-03-28
- Assignees: Agency for Science, Technology and Research
- Applicants: Agency for Science, Technology and Research
- Inventors: Haiyan Xu; Xiuju Fu; Xiao Feng Yin; Siow Mong Rick Goh; Wanbing Zhang
- Web page: https://patentgrep.com/patent/US20200394744A1

## CPC

- B63B 79/20: using models or simulation, e.g. statistical models or stochastic models
- B63B 79/40: for controlling the operation of vessels, e.g. monitoring their speed, routing or maintenance schedules
- G06N 5/02: Knowledge representation; Symbolic representation
- G06N 5/04: Inference or reasoning models
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q 30/0202: Market predictions or forecasting for commercial activities
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

There is provided a method for predicting a port-stay duration of a vessel at a port. The method includes: determining a plurality of port-stay components of the port-stay duration; determining a regression sequence of the plurality of port-stay components, comprising modeling a first port-stay component and each of a plurality of second port-stay components, determining the regression sequence of the plurality of port-stay components based on a relative measure associated to each of the plurality of second port-stay components; modeling each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain a first plurality of sequentially modeled port-stay components; modeling a first port-stay duration based on the first plurality of sequentially modeled port-stay components to obtain a first port-stay duration model; and predicting the port-stay duration based on the first port-stay duration model.

## Claims

### Claim 1

A computer-implemented method for predicting a port-stay duration of a vessel at a port using at least one processor, the method comprising:
determining a plurality of port-stay components of the port-stay duration, the plurality of port-stay components comprising a first port-stay component and a plurality of second port-stay components;
determining a regression sequence of the plurality of port-stay components, comprising:
modeling the first port-stay component to obtain a modeled first port-stay component, and modeling each of the plurality of second port-stay components to obtain a plurality of modeled second port-stay components,
determining a relative measure associated to each of the plurality of second port-stay components by modeling each of the plurality of modeled second port-stay components based on a first criterion, and
determining the regression sequence of the plurality of port-stay components based on the relative measure associated to each of the plurality of second port-stay components;
modeling each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain a first plurality of sequentially modeled port-stay components;
modeling a first port-stay duration based on the first plurality of sequentially modeled port-stay components to obtain a first port-stay duration model; and
predicting the port-stay duration based on the first port-stay duration model.

### Claim 2 (depends on 1)

The method of claim 1, wherein the relative measure indicates a proportion of a variability of each of the plurality of modeled second port-stay components modeled by at least one of the first modeled port-stay component and other modeled second port-stay components and one or more of a plurality of predefined port-stay factors.

### Claim 3 (depends on 1)

The method of claim 1, wherein the first criterion is based on R-square.

### Claim 4 (depends on 1)

The method of claim 1, wherein said determining the regression sequence of the plurality of port-stay components based on the relative measure associated to each of the plurality of second port-stay components further comprises assigning a second port-stay component associated to a highest relative measure amongst the plurality of second port-stay components a first order amongst the plurality of second port-stay components in the regression sequence.

### Claim 5 (depends on 1)

The method of claim 1, wherein said modeling the first port-stay component to obtain a modeled first port-stay component, and modeling each of the plurality of second port-stay components to obtain a plurality of modeled second port-stay components further comprises modeling each of the plurality of second port-stay components based on the modeled first port-stay component.

### Claim 6 (depends on 1)

The method of claim 1, wherein said modeling each of the plurality of port-stay components in sequence in accordance with the regression sequence comprises:
modeling the first port-stay component based on one or more of a plurality of predefined port-stay factors determined based on historical data to obtain a modeled first port-stay component of the first plurality of sequentially modeled port-stay components; and
modeling, for each of the plurality of second port-stay components, the second port-stay component based on a factor derived from an immediate preceding modeled port-stay component of the first plurality of sequentially modeled port-stay components in the regression sequence and one or more of the plurality of predefined port-stay factors.

### Claim 7 (depends on 1)

The method of claim 1, wherein said determining the regression sequence of the plurality of port-stay components further comprises:
determining relationships among the plurality of second port-stay components based on a second criterion, and
determining the regression sequence of the plurality of port-stay components based on the relationships among the plurality of second port-stay components.

### Claim 8 (depends on 1)

The method of claim 1, wherein:
the first port-stay component is a working hour component, and modeling the first port-stay component comprises modeling the working hour component based on one or more of a plurality of predefined port-stay factors; and
the plurality of second port-stay components are non-working hour components, and modeling the plurality of second port-stay components comprises modeling the non-working hour components based on the modeled working hour component and one or more of the plurality of predefined port-stay factors.

### Claim 9 (depends on 1)

The method of claim 1, wherein:
at least one of the plurality of second port-stay components is a weather-based non-working hour component, and modeling each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain the first plurality of sequentially modeled port-stay components comprises modeling each of the plurality of port-stay components including the weather-based non-working hour component in sequence, and further comprising:
modeling the plurality of port-stay components in sequence in accordance with the regression sequence without the weather-based non-working hour component to obtain a second plurality of sequentially modeled port-stay components;
modeling a second port-stay duration based on the second plurality of sequentially modeled port-stay components to obtain a second port-stay duration model; and
predicting the port-stay duration using a weighted average determined based on the first port-stay duration model and second port-stay duration model.

### Claim 10 (depends on 1)

The method of claim 1:
wherein at least one of the plurality of second port-stay components is a weather-based non-working hour component; and
further comprising modeling the weather-based non-working hour component using historical data of non-working hours due to weather in a first time instance prior to arrival of the vessel, and modeling the weather-based non-working hour component using the historical data of non-working hours due to weather and weather forecast data in a second time instance prior to arrival of the vessel, the first time instance having a time period further away from arrival of the vessel relative to the second time instance.

### Claim 11

A system for predicting a port-stay duration of a vessel at a port, the system comprising:
a memory; and
at least one processor communicatively coupled to the memory and configured to:
determine a plurality of port-stay components of the port-stay duration, the plurality of port-stay components comprising a first port-stay component and a plurality of second port-stay components;
determine a regression sequence of the plurality of port-stay components, comprising:
modeling the first port-stay component to obtain a modeled first port-stay component, and modeling each of the plurality of second port-stay components to obtain a plurality of modeled second port-stay components,
determining a relative measure associated to each of the plurality of second port-stay components by modeling each of the plurality of modeled second port-stay components based on a first criterion, and
determining the regression sequence of the plurality of port-stay components based on the relative measure associated to each of the plurality of second port-stay components;
model each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain a first plurality of sequentially modeled port-stay components;
model a first port-stay duration based on the first plurality of sequentially modeled port-stay components to obtain a first port-stay duration model; and
predict the port-stay duration based on the first port-stay duration model.

### Claim 12 (depends on 11)

The system according to claim 11, wherein the relative measure indicates a proportion of a variability of each of the plurality of modeled second port-stay components modeled by at least one of the first modeled port-stay component and other modeled second port-stay components and one or more of a plurality of predefined port-stay factors.

### Claim 13 (depends on 11)

The system according to claim 11, wherein said determine the regression sequence of the plurality of port-stay components based on the relative measure associated to each of the plurality of modeled second port-stay components further comprises assigning a second port-stay component associated to a highest relative measure amongst the plurality of second port-stay components a first order amongst the plurality of modeled second port-stay components in the regression sequence.

### Claim 14 (depends on 11)

The system according to claim 11, wherein said modeling the first port-stay component to obtain a modeled first port-stay component, and modeling each of the plurality of second port-stay components to obtain a plurality of modeled second port-stay components further comprises modeling each of the plurality of second port-stay components based on the modeled first port-stay component.

### Claim 15 (depends on 11)

The system according to claim 11, wherein said model each of the plurality of port-stay components in sequence in accordance with the regression sequence comprises:
modeling the first port-stay component based on one or more of a plurality of predefined port-stay factors determined based on historical data to obtain a modeled first port-stay component of the first plurality of sequentially modeled port-stay components; and
modeling, for each of the plurality of second port-stay components, the second port-stay component based on a factor derived from an immediate preceding modeled port-stay component of the first plurality of sequentially modeled port-stay components in the regression sequence and one or more of the plurality of predefined port-stay factors.

### Claim 16 (depends on 11)

The system according to claim 11, wherein said determine the regression sequence of the plurality of port-stay components further comprises:
determining relationships among the plurality of second port-stay components based on a second criterion, and
determining the regression sequence of the plurality of port-stay components based on the relationships among the plurality of second port-stay components.

### Claim 17 (depends on 11)

The system according to claim 11, wherein:
the first port-stay component is a working hour component, and modeling the first port-stay component comprises modeling the working hour component based on one or more of a plurality of predefined port-stay factors; and
the plurality of second port-stay components are non-working hour components, and modeling the plurality of second port-stay components comprises modeling the non-working hour components based on the modeled working hour component and one or more of the plurality of predefined port-stay factors

### Claim 18 (depends on 11)

The system according to claim 11, wherein:
at least one of the remaining port-stay components is a weather-based non-working hour component, and
model each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain a first plurality of sequentially modeled port-stay components comprises modeling each of the plurality of port-stay components including the weather-based non-working hour component in sequence; and the at least one processor is further configured to
model the plurality of port-stay components in sequence in accordance with the regression sequence without the weather-based non-working hour component in sequence to obtain a second plurality of sequentially modeled port-stay components;
model a second port-stay duration based on the second plurality of sequentially modeled port-stay components to obtain a second port-stay duration model; and
predict the port-stay duration using a weighted average determined based on the first port-stay duration model and second port-stay duration model.

### Claim 19 (depends on 11)

The system according to claim 11, wherein:
at least one of the plurality of second port-stay components comprise a weather-based non-working hour component, and the at least one processor is further configured to
model the weather-based non-working hour component using historical data of non-working hours due to weather in a first time instance prior to arrival of the vessel, and model the weather-based non-working hour component using the historical data of non-working hours due to weather and weather forecast data in a second time instance prior to arrival of the vessel, the first time instance having a time period further away from arrival of the vessel relative to the second time instance.

### Claim 20

A computer program product, embodied in one or more non-transitory computer-readable storage mediums, comprising instructions executable by at least one processor to perform a method for predicting a port-stay duration of a vessel at a port, the method comprising:
determining a plurality of port-stay components of the port-stay duration, the plurality of port-stay components comprising a first port-stay component and a plurality of second port-stay components;
determining a regression sequence of the plurality of port-stay components, comprising:
modeling the first port-stay component to obtain a modeled first port-stay component, and modeling each of the plurality of second port-stay components to obtain a plurality of modeled second port-stay components,
determining a relative measure associated to each of the plurality of second port-stay components by modeling each of the plurality of modeled second port-stay components based on a first criterion, and
determining the regression sequence of the plurality of port-stay components based on the relative measure associated to each of the plurality of second port-stay components;
modeling each of the plurality of port-stay components in sequence in accordance with the regression sequence determined to obtain a first plurality of sequentially modeled port-stay components;
modeling a first port-stay duration based on the first plurality of sequentially modeled port-stay components to obtain a first port-stay duration model; and
predicting the port-stay duration based on the first port-stay duration model.
