- Number: US 2020/0393891 A1
- Document ID: US20200393891A1
- Status: Published application
- Kind: A1
- Application number: 16/781,227
- Filed: 2020-02-04
- Published: 2020-12-17
- Earliest claimed: 2019-06-13
- Assignees: Microchip Technology Incorporated
- Applicants: Microchip Technology Incorporated
- Inventors: William T. Baggett; Venkat Iyer
- Web page: https://patentgrep.com/patent/US20200393891A1

## CPC

- G06F 1/3234: Power saving characterised by the action undertaken
- H04L 12/40039: {Details regarding the setting of the power status of a node according to activity on the bus}
- G06F 13/20: for access to input/output bus
- H04L 12/12: Arrangements for remote connection or disconnection of substations or of equipment thereof
- G06F 2213/40: Bus coupling
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Described is an architecture for a physical layer device useable with single pair Ethernet in a multidrop bus topology that may operate in a sleep mode and control other devices in network segment to operate in a sleep mode. Some embodiments of the physical layer device may support partial networking in a multidrop network, and mixed networks including the same.

## Claims

### Claim 1

A physical layer device for a network segment of a multidrop network, comprising:
a core logic associated with an interruptible power domain, the core logic configured to perform one or more operations for interfacing with a shared bus; and
a power management logic associated with an uninterruptable power domain, the power management logic configured to enable and disable supply of power to the interruptible power domain.

### Claim 2 (depends on 1)

The physical layer device of claim 1, further comprising:
a sensing circuitry configured to detect a wakeup signal asserted at an input of the physical layer device, the power management logic configured to enable the supply of power to the interruptible power domain responsive to detection of the detected asserted wakeup signal by said sensing circuitry.

### Claim 3 (depends on 2)

The physical layer device of claim 2, further comprising:
an energy detection circuitry configured to detect bus activity, the power management logic configured to enable the supply of power to interruptible power domain responsive to detection by said energy detection circuitry of a valid bus activity.

### Claim 4 (depends on 1)

The physical layer device of claim 1, wherein the power management logic is configured to enable the supply of power to the interruptible power domain in response to one or more of:
a valid wakeup signal; and
a valid bus activity.

### Claim 5 (depends on 1)

The physical layer device of claim 1, wherein the power management logic is configured to disable the supply of power to the interruptible power domain responsive to one or more of:
a sleep control signal;
an inactive input assigned to receive a wakeup signal; and
an inactive bus.

### Claim 6 (depends on 1)

The physical layer device of claim 1, wherein the core logic is configured to assert a wakeup signal at an output of the physical layer device in response to waking up from a sleep mode.

### Claim 7

A system, comprising:
a first station controller; and
a first physical layer device, the physical layer device configured to interface the first station controller with a shared bus of a network segment,
wherein the first physical layer device is configured to enable and disable supply of power to one or more of the first station controller and an interruptible power domain of the physical layer device.

### Claim 8 (depends on 7)

The system of claim 7, wherein the physical layer device comprises:
a power management logic associated with an uninterruptable power domain of the first physical layer device, the power management logic configured to enable and disable the supply of the power to the first station controller.

### Claim 9 (depends on 8)

The system of claim 8, wherein the physical layer device comprises:
a core logic associated with the interruptible power domain of the first physical layer device.

### Claim 10 (depends on 9)

The system of claim 9, wherein the power management logic is configured to disable the supply of power to the first station controller responsive to a sleep control signal provided by the core logic.

### Claim 11 (depends on 10)

The system of claim 10, further comprising
a control bus operatively coupling the first physical layer device and the first station controller,
wherein the core logic is configured to provide the sleep control signal to the power management logic via the control bus.

### Claim 12 (depends on 7)

The system of claim 7, further comprising equipment operatively coupled to a network by the first network segment.

### Claim 13 (depends on 12)

The system of claim 12, further comprising:
a switch configured to provide an interruptible path for supplying power to the equipment.

### Claim 14 (depends on 13)

The system of claim 13, further comprising:
a power master configured to generate power control signals for a network, wherein the power master is configured to selectively reset stations of a network segment of the network by instructing respective station controllers of the stations to enter a sleep mode.

### Claim 15 (depends on 14)

The system of claim 14, further comprising:
a power master configured to generate power control signal for a network, wherein the power master is configured to force stations of a network segment to enter a sleep mode by asserting a power control signal at the shared bus, the power control signal exhibiting an energy level different than an energy level associated with communication messages conveyed over the network segment.

### Claim 16 (depends on 7)

The system of claim 7, further comprising:
a second station controller; and
a second physical layer device of the first network segment,
wherein the second physical layer device is configured to enable supply of power to the second station controller responsive to a wakeup signal received from the first physical layer device.

### Claim 17

A method, comprising:
disabling supply of power to a first power domain of a power slave in response to:
receiving a sleep control signal; or
observing a signal indicative of bus inactivity at a shared bus; and
continuing to supply power to a second power domain of the power slave while the supply of power to the main power domain of the power slave is disabled.

### Claim 18 (depends on 17)

The method of claim 17, wherein disabling the supply of power to the first power domain of the power slave in response to the observed sleep control signal or the observed signal indicative of bus inactivity at the shared bus comprises:
de-asserting an enablement signal thereby indicating that power should not be supplied to the first power domain of the power slave responsive to:
the observed sleep control signal; or
the observed signal indicative of bus inactivity at the shared bus.

### Claim 19 (depends on 17)

The method of claim 17, wherein the observing the signal indicative of bus inactivity comprises observing an energy level of the signal and determining that the energy level is different than an energy level associated with a valid communication signal.

### Claim 20 (depends on 17)

The method of claim 17, further comprising:
supplying power to the first power domain of the power slave responsive to:
observing a wakeup signal at an input of a physical layer device of the power slave; or
observing a signal indicative of valid bus activity at the shared bus.

### Claim 21 (depends on 20)

The method of claim 20, further comprising:
asserting an enablement signal thereby indicating that power should be supplied to the first power domain of the power slave responsive to:
the observed wakeup signal; or
the observed signal indicative of valid bus activity at the shared bus; and
starting the supplying of the power to the first power domain of the power slave responsive to the asserted enablement signal.

### Claim 22 (depends on 20)

The method of claim 20, further comprising:
asserting a second wakeup signal at an output of the physical layer device in response to supplying power to the main power domain, the output being operably coupled to an input of another physical layer device.