- Number: US 2020/0392823 A1
- Document ID: US20200392823A1
- Status: Published application
- Kind: A1
- Application number: 16/753,988
- Filed: 2018-10-05
- Published: 2020-12-17
- Earliest claimed: 2017-10-06
- Assignees: Petroleo Brasileiro S.A. - Petrobras
- Applicants: PetróLeo Brasileiro S.A. - Petrobras
- Inventors: Roberto RODRIGUES; Carlos ALBERTO BANDEIRA RIBEIRO CARDOSO
- Web page: https://patentgrep.com/patent/US20200392823A1

## CPC

- E21B 43/166: {Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium (CO2 injection E21B43/164; steam injection E21B43/24)}
- E21B 43/013: Connecting a production flow line to an underwater well head
- Y02P 90/70: Combining sequestration of CO2 and exploitation of hydrocarbons by injecting CO2 or carbonated water in oil wells
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A system for pressurization of an underwater oil reservoir by independent injection of water and gas comprise: at least first and second underwater injection wells, wherein at least one of the first and second underwater injection wells is linked to a production unit by means of an individual underwater line; and at least two jumpers: a first jumper hydraulically connecting a wet Christmas tree of the first underwater injection well to a wet Christmas tree of the second underwater injection well, and a second jumper hydraulically the wet Christmas tree of the second underwater injection well to the wet Christmas tree of the first underwater injection well.

## Claims

### Claim 1

System for pressurization of an underwater oil reservoir by independent injection of water and gas, the system comprising:
at least first and second underwater injection wells, wherein at least one of the first and second underwater injection wells is linked to a production unit by means of an individual underwater line; and
at least two jumpers:
a first jumper hydraulically connecting a wet Christmas tree, WCT, of the first underwater injection well to a wet Christmas tree, WCT, of the second underwater injection well, and
a second jumper hydraulically connecting the wet Christmas tree, WCT, of the second underwater injection well to the wet Christmas tree, WCT, of the first underwater injection well.

### Claim 2 (depends on 1)

System according to claim 1, wherein at least one of the underwater injection wells is linked to the production unit by means of the individual underwater line via a main injection mandrel of the respective wet Christmas tree, WCT, of the at least one well.

### Claim 3 (depends on 1)

System according to claim 1, wherein the first jumper hydraulically connects an auxiliary mandrel of the wet Christmas tree, WCT, of the first underwater injection well to an annulus mandrel of the wet Christmas tree, WCT, of the second underwater injection well.

### Claim 4 (depends on 1)

System according to claim 1, wherein the second jumper hydraulically connects an auxiliary mandrel of the wet Christmas tree, WCT, of the second underwater injection well to an annulus mandrel of the wet Christmas tree, WCT, of the first underwater injection well.

### Claim 5 (depends on 1)

System according to claim 1, further comprising an underwater seawater collection and injection system, SI.

### Claim 6 (depends on 5)

System according to claim 5, wherein the underwater seawater collection and injection system, SI, comprises one or more from the list of a suction pipe, a non-return valve, a filter, an injection pump and a suction valve.

### Claim 7 (depends on 5)

System according to claim 5, wherein the underwater seawater collection and injection system, SI, is in fluidic communication with a main injection mandrel of the wet Christmas tree, WCT, of the first or second underwater injection well.

### Claim 8 (depends on 5)

System according to claim 5, wherein the underwater seawater collection and injection system, SI, is in fluidic communication with a main injection mandrel of the wet Christmas tree, WCT, of the first underwater injection well.

### Claim 9 (depends on 5)

System according to claim 5, wherein the system is configured to inject only water through a first individual underwater line, which hydraulically connects either the production unit or the underwater seawater collection and injection system, SI, with the first underwater injection well.

### Claim 10 (depends on 1)

System according to claim 1, wherein the system is configured to inject only gas through a second individual underwater line that hydraulically connects the production unit with the second underwater injection well.

### Claim 11 (depends on 1)

System according to claim 1, wherein the first jumper is configured to only convey water from the wet Christmas tree, WCT, of the first underwater injection well to the wet Christmas tree, WCT, of the second underwater injection well.

### Claim 12 (depends on 1)

System according to claim 1, wherein the second jumper is configured to only convey gas from the wet Christmas tree, WCT, of the second underwater injection well to the wet Christmas tree, WCT, of the first underwater injection well.

### Claim 13 (depends on 1)

System according to claim 1, further comprising at least one measurement unit for management of the amounts of fluid, gas or water, injected in one or both of the first and second underwater injection wells.

### Claim 14 (depends on 1)

Method for pressurization of an underwater oil reservoir by independent injection of water and gas, the method using the system of claim 1 and comprising a step of:
injecting at least one of water and gas in the first and/or second underwater injection well.

### Claim 15 (depends on 14)

Method according to claim 14, wherein the step of injecting at least one of water and gas is carried out either from the production unit or from the underwater collection and injection system, SI.

### Claim 16 (depends on 14)

Method according to claim 14, wherein the step of injecting at least one of water and gas comprises continuous or alternating injection of water or gas through individual underwater lines from the production unit, water being only injected via a first individual underwater line and gas being only injected via a second individual underwater line.

### Claim 17 (depends on 14)

Method according to claim 14, wherein the step of injecting at least one of water and gas comprises continuous or alternating injection of water or gas through individual underwater lines, water only being injected via a first individual underwater line from the underwater collection and injection system, SI, and gas only being injected via a second individual underwater line from the production unit.

### Claim 18 (depends on 14)

Method according to claim 14, further comprising a step of directing only water injected in the wet Christmas tree, WCT, of the first underwater injection well to the second underwater injection well through the first jumper.

### Claim 19 (depends on 14)

Method according to claim 14, further comprising a step of directing only gas injected in the wet Christmas tree, WCT, of the second underwater injection well to the first underwater injection well through the second jumper.

### Claim 20 (depends on 14)

Method according to claim 14, further comprising a step of control and measurement of flow rate of fluid, gas or water, injected in each of the first and second underwater injection wells.