# US 2020/0392041 A1 · Clinker production plant and method for producing clinker in such a plant

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0392041 A1
- Document ID: US20200392041A1
- Status: Published application
- Kind: A1
- Application number: 16/772,191
- Filed: 2018-12-13
- Published: 2020-12-17
- Earliest claimed: 2017-12-15
- Assignees: Fives Fcb
- Applicants: Fives Fcb
- Inventors: Jean-Michel CHARMET; Yannick GUIMARD
- Web page: https://patentgrep.com/patent/US20200392041A1

## CPC

- C04B 7/4446: {the fuel being treated in a separate gasifying or decomposing chamber, e.g. a separate combustion chamber}
- C04B 7/475: {using the waste heat, e.g. of the cooled clinker, in an other way than by simple heat exchange in the cement production line, e.g. for generating steam}
- C04B 7/4423: {Waste or refuse used as fuel}
- F27B 7/12: tiltable
- F27M 2003/03: Calcining
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- F27B: FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27M: INDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS

## Abstract

Disclosed is a clinker production plant including: a preheating unit; a calcination unit; a kiln; and a cooler. The calcination assembly includes a calcination reactor for calcination by combustion of a solid so-called alternative fuel. The calcination reactor is arranged such that at least part of the combustion fumes from the kiln pass partly through the calcination reactor before entering the preheating unit, and a tertiary gas flow including air leaving the cooler passing at least in part through the calcination reactor before entering the preheating unit. The calcination reactor includes a system for controlling the residence time of the alternative solid fuel.

## Claims

### Claim 1

A clinker production plant (1) comprising:
a preheating unit (2), in which raw material is preheated;
a calcination unit (3), in which the preheated raw material is at least partially decarbonated;
a kiln (4) in which the preheated and at least partially decarbonated raw material is baked;
a cooler (5) in which the fired kiln material is cooled by cooling air;
plant in which the calcination assembly comprises a reactor (8) to calcinate by combustion a solid so-called alternative fuel, the calcination reactor (8) being arranged, according to the direction of flow of the gases, between the preheating assembly (2) and the kiln (4), and being connected to the cooler (5) so that:
at least part of the combustion fumes from the kiln (4) pass at least partly through the calcination reactor (8) before entering the preheating unit (2),
a tertiary gas flow comprising at least in part air leaving the cooler (5) passes at least in part through the calcination reactor (8) before entering the preheating unit (2),
and wherein the calcination reactor (8) comprises a system for controlling the residence time of the alternative solid fuel in the calcination reactor (8).

### Claim 2 (depends on 1)

The plant according to claim 1 comprising a tertiary flow rate adjustment system (13) configured to ensure, in the calcination reactor (8), a balance between the supply of oxygen necessary for the combustion reaction and the reduction of the NOx produced in the kiln (4).

### Claim 3 (depends on 1)

The plant (1) according to claim 1, wherein the calcination reactor (8) is a rotary kiln, where the alternative solid fuel residence time control system is a system for controlling the rotational speed and/or slope of the calcination reactor (8).

### Claim 4 (depends on 1)

The plant (1) according to claim 1, wherein the preheating unit (2) comprises at least one cyclone preheater.

### Claim 5 (depends on 1)

The plant according to claim 1, in which the calcination unit (3) furthermore comprises an additional calcination reactor (10) supplied with fuel, the additional calcination reactor (10) being arranged between the calcination reactor (8) and the preheating unit (2) in the direction of gas flow, so that at least some of the fumes leaving the calcination reactor (8) pass through the additional calcination reactor (10) before entering the preheating unit (2).

### Claim 6 (depends on 1)

Installation (1) according to claim 1, in which the calcination assembly (3) furthermore comprises an auxiliary calcination reactor (11), supplied with a fuel, the auxiliary reactor (11) being connected to the cooler (5) upstream of the calcination reactor (8) in the direction of flow of the gases, so that the tertiary gas flow supplying the calcination reactor (8) comprises at least some of the fumes leaving the auxiliary reactor (11).

### Claim 7 (depends on 1)

A method for producing clinker in a plant (1) according to claim 1, said method comprising:
preheating the raw material in the preheating unit (2);
decarbonating the preheated material in the calcination unit (3);
baking the preheated and decarbonated material in the kiln (4);
cooling the fired material in the cooler, the cooling being carried out by means of cooling air; the method further comprising:
feeding the calcination reactor (8) with at least part of the kiln (4) fumes and a tertiary gas stream comprising at least part of the cooling air leaving the cooler (5);
combusting in the calcination reactor (8) of a solid alternative fuel and the adjustment of the residence time of the solid alternative fuel in the calcination reactor (8);
recovering the fumes from the calcination reactor (8) to feed the preheating unit (2).

### Claim 8 (depends on 7)

The method according to claim 7, wherein the solid alternative fuel is a solid fuel comprising particles having a characteristic size greater than 20 mm.

### Claim 9 (depends on 7)

The method according to claim 7, wherein the solid alternative fuel is a solid fuel comprising particles having a characteristic size greater than 80 mm.

### Claim 10 (depends on 7)

The method according to claim 7, wherein the tertiary gas flow to the calcination reactor (8) can be controlled so as to achieve a balance between the supply of oxygen needed for the combustion reaction and the reduction of NOx produced in the kiln (4).

### Claim 11 (depends on 2)

The plant (1) according to claim 2, wherein the calcination reactor (8) is a rotary kiln, where the alternative solid fuel residence time control system is a system for controlling the rotational speed and/or slope of the calcination reactor (8).

### Claim 12 (depends on 2)

The plant (1) according to claim 2, wherein the preheating unit (2) comprises at least one cyclone preheater.

### Claim 13 (depends on 3)

The plant (1) according to claim 3, wherein the preheating unit (2) comprises at least one cyclone preheater.

### Claim 14 (depends on 2)

The plant according to claim 2, in which the calcination unit (3) furthermore comprises an additional calcination reactor (10) supplied with fuel, the additional calcination reactor (10) being arranged between the calcination reactor (8) and the preheating unit (2) in the direction of gas flow, so that at least some of the fumes leaving the calcination reactor (8) pass through the additional calcination reactor (10) before entering the preheating unit (2).

### Claim 15 (depends on 3)

The plant according to claim 3, in which the calcination unit (3) furthermore comprises an additional calcination reactor (10) supplied with fuel, the additional calcination reactor (10) being arranged between the calcination reactor (8) and the preheating unit (2) in the direction of gas flow, so that at least some of the fumes leaving the calcination reactor (8) pass through the additional calcination reactor (10) before entering the preheating unit (2).

### Claim 16 (depends on 4)

The plant according to claim 4, in which the calcination unit (3) furthermore comprises an additional calcination reactor (10) supplied with fuel, the additional calcination reactor (10) being arranged between the calcination reactor (8) and the preheating unit (2) in the direction of gas flow, so that at least some of the fumes leaving the calcination reactor (8) pass through the additional calcination reactor (10) before entering the preheating unit (2).

### Claim 17 (depends on 2)

Installation (1) according to claim 2, in which the calcination assembly (3) furthermore comprises an auxiliary calcination reactor (11), supplied with a fuel, the auxiliary reactor (11) being connected to the cooler (5) upstream of the calcination reactor (8) in the direction of flow of the gases, so that the tertiary gas flow supplying the calcination reactor (8) comprises at least some of the fumes leaving the auxiliary reactor (11).

### Claim 18 (depends on 3)

Installation (1) according to claim 3, in which the calcination assembly (3) furthermore comprises an auxiliary calcination reactor (11), supplied with a fuel, the auxiliary reactor (11) being connected to the cooler (5) upstream of the calcination reactor (8) in the direction of flow of the gases, so that the tertiary gas flow supplying the calcination reactor (8) comprises at least some of the fumes leaving the auxiliary reactor (11).

### Claim 19 (depends on 4)

Installation (1) according to claim 4, in which the calcination assembly (3) furthermore comprises an auxiliary calcination reactor (11), supplied with a fuel, the auxiliary reactor (11) being connected to the cooler (5) upstream of the calcination reactor (8) in the direction of flow of the gases, so that the tertiary gas flow supplying the calcination reactor (8) comprises at least some of the fumes leaving the auxiliary reactor (11).

### Claim 20 (depends on 5)

Installation (1) according to claim 5, in which the calcination assembly (3) furthermore comprises an auxiliary calcination reactor (11), supplied with a fuel, the auxiliary reactor (11) being connected to the cooler (5) upstream of the calcination reactor (8) in the direction of flow of the gases, so that the tertiary gas flow supplying the calcination reactor (8) comprises at least some of the fumes leaving the auxiliary reactor (11).