# US 2020/0391775 A1 · Information processing apparatus, information processing method, and non-transitory computer readable medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0391775 A1
- Document ID: US20200391775A1
- Status: Published application
- Kind: A1
- Application number: 16/816,358
- Filed: 2020-03-12
- Published: 2020-12-17
- Earliest claimed: 2019-06-14
- Assignees: Kabushiki Kaisha Toshiba
- Applicants: Kabushiki Kaisha Toshiba
- Inventors: Tomoshi OTSUKI; Hideki Kubo; Hideyuki Aisu; Takufumi Yoshida
- Web page: https://patentgrep.com/patent/US20200391775A1

## CPC

- B61L 27/12: Preparing schedules
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 50/40: Business processes related to the transportation industry (shipping G06Q10/083)
- B61L 27/14: Following schedules
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

An information processing apparatus according to an embodiment includes a diagram processor configured to calculate, based on a first diagram of first to n-th train lines including at least one time of: times of departure of a vehicle from stop positions, times of arrival of the vehicle at the stop positions, and times of pass of the vehicle through the stop positions, an adjustment amount of the time; and an output diagram creator configured to create a second diagram based on the calculated adjustment amount and the first diagram.

## Claims

### Claim 1

An information processing apparatus comprising:
a diagram processor configured to calculate, based on a first diagram of first to n-th train lines including at least one time of: times of departure of a vehicle from stop positions, times of arrival of the vehicle at the stop positions, and times of pass of the vehicle through the stop positions, an adjustment amount of the time; and
an output diagram creator configured to create a second diagram based on the calculated adjustment amount and the first diagram.

### Claim 2 (depends on 1)

The apparatus according to claim 1, wherein the diagram processor calculates the adjustment amount of the time based on a restriction condition relating to an interval of the first to n-th train lines.

### Claim 3 (depends on 2)

The apparatus according to claim 2, wherein the restriction condition includes a condition on a number of train lines including:
a time of departure from a first one of the stop positions in a first period,
a time of arrival at the first stop position in a first period; or
a time of pass through the first stop position in a first period.

### Claim 4 (depends on 2)

The apparatus according to claim 2, wherein the restriction condition includes, for each of vehicle types of first to n-th vehicles, a condition relating to at least one of the number of trains and a first one of the stop positions.

### Claim 5 (depends on 1)

The apparatus according to claim 1, wherein the diagram processor creates, based on a variable representing an adjustment amount of the time in the first to n-th train lines, a first evaluation indicator relating to:
standardization of an interval of time of departure from a second one of the stop positions,
standardization of an interval of time of arrival at the second stop position; or
standardization of an interval of time of pass through the second stop position and
calculates a value of the variable based on the first evaluation indicator.

### Claim 6 (depends on 5)

The apparatus according to claim 5, wherein the first evaluation indicator represents a sum of absolutes of differences between a difference between (1) the time of departure from the second stop position, the time of arrival at the second stop position, or the time of pass through the second stop position and (2) a time of departure from a preceding stop position of the second stop position, a time of arrival at the preceding stop position, or a time of pass through the preceding stop position, and
a difference between (3) the time of departure from the second stop position, the time of arrival at the second stop position, or the time of pass through the second stop position and (4) a time of departure from a next stop position of the second stop position, a time of arrival at the next stop position, and a time of pass through the next stop position.

### Claim 7 (depends on 5)

The apparatus according to claim 5, wherein the diagram processor creates the first evaluation indicator for each of types of first to n-th vehicles.

### Claim 8 (depends on 1)

The apparatus according to claim 1, wherein the diagram processor creates, based on a variable representing an adjustment amount of the time in the first to n-th train lines, a second evaluation indicator relating to a sum of run times in evaluation sections of at least one train line among the first to n-th train lines and calculates a value of the variable based on the second evaluation indicator.

### Claim 9 (depends on 1)

The apparatus according to claim 1, wherein the diagram processor creates, based on a variable representing an adjustment amount of the time in the first to n-th train lines and distribution information of a delay time between the stop positions, a third evaluation indicator relating to: a delay time with respect to time of departure from a third one of the stop positions, a delay time with respect to time of arrival at the third stop position, or a delay time with respect to time of pass through the third stop position and
calculates a value of the variable based on the third evaluation indicator.

### Claim 10 (depends on 9)

The apparatus according to claim 9, wherein the third evaluation indicator represents a sum of averages of the delay time with respect to the time of departure from the third stop position, the time of arrival at the third stop position, or the time of pass through the third stop position.

### Claim 11 (depends on 1)

The apparatus according to claim 1, wherein the restriction condition includes a condition that a predetermined time among the times in the first diagram is fixed.

### Claim 12 (depends on 1)

The apparatus according to claim 1, wherein the restriction condition includes a condition that a time interval between the stop positions is equal to or larger than a time interval indicated by interval information.

### Claim 13 (depends on 1)

The apparatus according to claim 1, wherein the output diagram creator creates the second diagram by adding the calculated adjustment amount to the time in the first diagram.

### Claim 14 (depends on 1)

The apparatus according to claim 1, wherein
the diagram processor converts the times into a plurality of blocks for each of the first to n-th train lines,
the adjustment amount represents an adjustment amount of time in block units, and
the output diagram creator creates the second diagram based on the plurality of blocks and the calculated adjustment amount.

### Claim 15 (depends on 14)

The apparatus according to claim 14, wherein the diagram processor collects a time of departure from a stop position at a start of a section of running without dwelling, a time of arrival at a stop position at an end of the section, and all times existing between the time of departure and the time of arrival into one block.

### Claim 16 (depends on 1)

The apparatus according to claim 1, wherein the first to n-th train lines include times of departure of the vehicle from the stop positions, times of arrival of the vehicle at the stop positions, and times of pass of the vehicle through the stop positions.

### Claim 17 (depends on 1)

The apparatus according to claim 1, wherein
the first to n-th train lines include at least one event,
the event includes
the stop position and,
the time of departure of the vehicle from the stop positions, the time of arrival of the vehicle at the stop position, or the time of pass of the vehicle through the stop position, and
the diagram processor calculates an adjustment amount of the time of the event in the first to n-th train lines and creates the second diagram based on the calculated adjustment amount and the first diagram.

### Claim 18

An information processing method comprising:
calculating, based on a first diagram of first to n-th train lines including at least one time of: times of departure of a vehicle from stop positions, times of arrival of the vehicle at the stop positions, and times of pass of the vehicle through the stop positions, an adjustment amount of the time; and
creating a second diagram based on the calculated adjustment amount and the first diagram.

### Claim 19

A non-transitory computer readable medium having a computer program stored therein which causes a computer when the computer program is executed by the computer to perform processes comprising:
calculating, based on a first diagram of first to n-th train lines including at least one time of: times of departure of a vehicle from stop positions, times of arrival of the vehicle at the stop positions, and times of pass of the vehicle through the stop positions, an adjustment amount of the time; and
creating a second diagram based on the calculated adjustment amount and the first diagram.
