# US 2020/0391389 A1 · In-vehicle building material processing system and building material processing method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0391389 A1
- Document ID: US20200391389A1
- Status: Published application
- Kind: A1
- Application number: 16/492,533
- Filed: 2017-03-10
- Published: 2020-12-17
- Earliest claimed: 2017-03-10
- Assignees: Iida Group Holdings Co., Ltd.
- Applicants: Iida Group Holdings Co., Ltd.
- Inventors: Kazuhiko MORI; Yoichi NISHIKAWA; Ayumu WATANABE; Yusuke MINAGAWA
- Web page: https://patentgrep.com/patent/US20200391389A1

## CPC

- B25J 11/0055: {Cutting}
- B25J 5/02: travelling along a guideway
- B25J 9/0096: {co-operating with a working support, e.g. work-table}
- B25J 9/1676: {Avoiding collision or forbidden zones}
- B25J 15/0019: {End effectors other than grippers}
- B60P 3/14: the object being a workshop for servicing, for maintenance, or for carrying workmen during work (lifting devices for movable platforms or cabins for workmen B66F11/04)
- G05B 19/4155: characterised by program execution, i.e. part program or machine function execution, e.g. selection of a program
- B27C 9/02: with a single working spindle
- G05B 2219/45083: Manipulators, robot
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- B60P: VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS (vehicles with special provisions for transporting patients or disabled persons, or their personal conveyances A61G3/00)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- B27C: PLANING, DRILLING, MILLING, TURNING OR UNIVERSAL MACHINES FOR WOOD OR SIMILAR MATERIAL (machine tools in general B23; working wood using abrasive, e.g. sanding, devices B24; tools for these purposes B27G)

## Abstract

An in-vehicle building material processing system including: a flat cargo bed formed on a vehicle; rigid members for ensuring flatness with respect to a workpiece-receiving table formed at predetermined section of the cargo bed; clampers for fixing a building material on the workpiece-receiving table; a multi-joint robot provided with a freely swingable cutting means at its tip, which is capable of protruding in a range wider than outer periphery of the workpiece-receiving table; and a control unit having an operation unit for making the multi-joint robot to cut and process the building material desirably, wherein the control unit controls the cutting means to cut and process the building material while controlling at least either of the cutting means and the clampers to avoid a contact of the cutting means and the clampers.

## Claims

### Claim 1

A movable in-vehicle building material processing system having a function to cut and process a building material to be used on construction site, comprising:
a flat cargo bed formed on a vehicle;
rigid members for ensuring flatness with respect to a workpiece-receiving table formed at predetermined section of the cargo bed;
clampers for fixing the building material on the workpiece-receiving table with control;
a multi-joint robot provided with a freely swingable cutting means at its tip, which is capable of protruding in a range wider than outer periphery of the workpiece-receiving table; and
a control unit for controlling entire system having an operation unit for making the multi-joint robot to cut and process the building material desirably,
wherein the control unit controls the cutting means to cut and process the building material while controlling at least either of the cutting means and the clampers to avoid contact of the cutting means and the clampers.

### Claim 2 (depends on 1)

The in-vehicle building material processing system according to claim 1,
wherein the clampers comprise a pressing crossarm having avoiding function, which is at least either capable of operating to rotate around a vertical axis or capable of moving in horizontal direction, with respect to the workpiece-receiving table by control of the control unit, in order to avoid contact of the cutting means and the clampers.

### Claim 3 (depends on 2)

The in-vehicle building material processing system according to claim 2, wherein the control unit comprises:
a mutual position relation predicting means for predicting mutual position relation between the cutting means and the clampers; and
a clamper avoiding means for operating only clamper, which is predicted to contact the cutting means, to avoid the cutting means, among the clampers plurally arranged on the workpiece-receiving table, and also, for operating the clamper to return to be able to fix the building material, from the clamper that avoiding purpose has been ended, based on a calculation result of the mutual position relation predicting means.

### Claim 4 (depends on 1)

The in-vehicle building material processing system according to claim 1, wherein a total number N of the clampers is N=8.

### Claim 5 (depends on 1)

The in-vehicle building material processing system according to claim 1 further comprising:
an air cylinder for driving open and close operation or moving operation of the clampers;
an air compressor for applying compressed air to the air cylinder; and
an electromagnetic air valve capable of controlling to press the compressed air generated by the air compressor into the air cylinder based on an operation of the operation unit.

### Claim 6 (depends on 5)

The in-vehicle building material processing system according to claim 5, further comprising:
rails extending in adjacent to the workpiece-receiving table; and
a carrier capable of moving the multi-joint robot by engaging with the rails,
wherein the control unit is configured to control the cutting means and the multi-joint robot together with the carrier.

### Claim 7 (depends on 5)

The in-vehicle building material processing system according to claim 5, wherein the vehicle comprises:
a power generator capable of supplying electric power necessary for the system; and
a dust collector for collecting cutting chips,
wherein the power generator and the air compressor are loaded at forward side of the cargo bed and in front of the workpiece-receiving table,
the workpiece-receiving table is formed at intermediate position of longitudinal direction of the cargo bed, and
a storage place for material before processing is arranged at backward side of the cargo bed.

### Claim 8 (depends on 7)

The in-vehicle building material processing system according to claim 7, wherein the power generator comprises a power transmission means driven by concurrently using a power of engine used for a movement of the vehicle.

### Claim 9

A building material processing method for cutting and processing a building material to be used on construction site by loading a multi-joint robot provided with a freely swingable cutting means at its tip onto a vehicle, using:
a workpiece-receiving table ensuring flatness by rigid members arranged at predetermined section of a cargo bed composing the vehicle;
the multi-joint robot provided with the freely swingable cutting means at its tip, which is capable of protruding in a range wider than outer periphery of the workpiece-receiving table; and
a control unit for controlling entire system having an operation unit for making the multi-joint robot to cut and process the building material desirably,
wherein the building material fixed on the workpiece-receiving table by clampers is cut and processed by the cutting means while at least either of the cutting means and the clampers is operated to avoid a contact of the cutting means and the clampers, with an aid of the control unit.

### Claim 10 (depends on 9)

The building material processing method described in claim 9, comprising:
a material loading step for loading building materials before processing and to be used on construction site on a storage place for material before processing arranged at backward side of the cargo bed;
a self-advancing moving step for moving the vehicle in fully equipped condition to construction site by self-travelling;
a building material clamping step for fixing loaded building material before processing by the clampers, by moving the building material to the workpiece-receiving table in an order of use for assembly;
a desired operation step, in which a user operates the operation unit for performing a desired cutting and processing of the building material by the multi-joint robot;
a cutting and processing step for cutting and processing the building material by the cutting means while the clampers operating to avoid a contact with the cutting means, by controlling an entire system by the control unit according to an operation of the user; and
a building material clamping releasing step for removing the building material cut and processed desirably from the workpiece-receiving table by releasing the clampers.

### Claim 11 (depends on 10)

The building material processing method described in claim 10, wherein the cutting and processing step comprises:
a mutual position relation predicting step for predicting mutual position relation between the cutting means and the clampers by a mutual position relation predicting means, based on a behavior of the cutting means according to the desired cutting and processing;
a contact avoiding step for operating a clamper, which is predicted to contact the cutting means, to avoid the cutting means, among a plurality of the clampers, according to a prediction result by the mutual position relation predicting step; and
a clamper returning step for operating the clamper, which has been operated to avoid the cutting means in the contact avoiding step, to return to be able to fix the building material, from the clamper that avoiding purpose has been ended.

### Claim 12 (depends on 2)

The in-vehicle building material processing system according to claim 2, wherein a total number N of the clampers is N=8.

### Claim 13 (depends on 3)

The in-vehicle building material processing system according to claim 3, wherein a total number N of the clampers is N=8.

### Claim 14 (depends on 2)

The in-vehicle building material processing system according to claim 2, further comprising:
an air cylinder for driving open and close operation or moving operation of the clampers;
an air compressor for applying compressed air to the air cylinder; and
an electromagnetic air valve capable of controlling to press the compressed air generated by the air compressor into the air cylinder based on an operation of the operation unit.

### Claim 15 (depends on 3)

The in-vehicle building material processing system according to claim 3, further comprising:
an air cylinder for driving open and close operation or moving operation of the clampers;
an air compressor for applying compressed air to the air cylinder; and
an electromagnetic air valve capable of controlling to press the compressed air generated by the air compressor into the air cylinder based on an operation of the operation unit.

### Claim 16 (depends on 14)

The in-vehicle building material processing system according to claim 14, further comprising:
rails extending in adjacent to the workpiece-receiving table; and
a carrier capable of moving the multi-joint robot by engaging with the rails,
wherein the control unit is configured to control the cutting means and the multi-joint robot together with the carrier.

### Claim 17 (depends on 15)

The in-vehicle building material processing system according to claim 15, further comprising:
rails extending in adjacent to the workpiece-receiving table; and
a carrier capable of moving the multi-joint robot by engaging with the rails,
wherein the control unit is configured to control the cutting means and the multi-joint robot together with the carrier.

### Claim 18 (depends on 6)

The in-vehicle building material processing system according to claim 6, wherein the vehicle comprises:
a power generator capable of supplying electric power necessary for the system; and
a dust collector for collecting cutting chips,
wherein the power generator and the air compressor are loaded at forward side of the cargo bed and in front of the workpiece-receiving table,
the workpiece-receiving table is formed at intermediate position of longitudinal direction of the cargo bed, and
a storage place for material before processing is arranged at backward side of the cargo bed.

### Claim 19 (depends on 14)

The in-vehicle building material processing system according to claim 14, wherein the vehicle comprises:
a power generator capable of supplying electric power necessary for the system; and
a dust collector for collecting cutting chips,
wherein the power generator and the air compressor are loaded at forward side of the cargo bed and in front of the workpiece-receiving table,
the workpiece-receiving table is formed at intermediate position of longitudinal direction of the cargo bed, and
a storage place for material before processing is arranged at backward side of the cargo bed.

### Claim 20 (depends on 15)

The in-vehicle building material processing system according to claim 15, wherein the vehicle comprises:
a power generator capable of supplying electric power necessary for the system; and
a dust collector for collecting cutting chips,
wherein the power generator and the air compressor are loaded at forward side of the cargo bed and in front of the workpiece-receiving table,
the workpiece-receiving table is formed at intermediate position of longitudinal direction of the cargo bed, and
a storage place for material before processing is arranged at backward side of the cargo bed.