# US 2020/0385948 A1 · Construction device and method for operating a construction device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0385948 A1
- Document ID: US20200385948A1
- Status: Published application
- Kind: A1
- Application number: 16/763,941
- Filed: 2019-04-30
- Published: 2020-12-10
- Earliest claimed: 2018-06-18
- Assignees: BAUER Spezialtiefbau GmbH
- Applicants: BAUER Spezialtiefbau GmbH
- Inventors: Herbert KARL; Robert KULZINGER; Josef STÖCKL
- Web page: https://patentgrep.com/patent/US20200385948A1

## CPC

- E02D 13/04: Guide devices; Guide frames {(as parts of the driver scaffold E02D7/16)}
- E02D 7/02: Placing by driving {(E02D7/18 - E02D7/24 take precedence)}
- E02D 7/06: Power-driven drivers {(tampers E02D3/061)}
- E02D 7/14: Components for drivers {inasmuch as not specially for a specific driver construction}
- E02D 7/16: Scaffolds {or supports} for drivers {(guide frames for the elements to be driven per se E02D13/04; supports of the artificial island type E02B17/00)}
- E02D 7/165: {of variable length, e.g. foldable or telescopic}
- E02D 17/13: Foundation slots {or slits}; Implements for making these slots {or slits}
- E21B 7/02: Drilling rigs characterised by means for land transport {with their own drive}, e.g. skid mounting or wheel mounting
- E21B 15/00: Supports for the drilling machine, e.g. derricks or masts
- E02D 7/125: {Diesel drivers}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The invention relates to a construction device and to a method for operating this construction device, comprising a carrier device, an approximately vertical mast, which is mounted on the carrier device, a movement element, which is vertically movable along a linear guide on the mast, and at least one GPS receiving unit, which is arranged in the region of the mast. According to the invention, it is provided that the at least one GPS receiving unit is attached to the movement element and that the at least one GPS receiving unit can be moved between an upper, first measuring position and a lower, second measuring position by means of the movement element.

## Claims

### Claim at position 1

-11. (canceled)

### Claim 12

Construction device, comprising
a carrier device,
an approximately vertical mast, which is mounted on the carrier device,
a movement element, which is vertically movable along a linear guide on the mast, and
at least one GPS receiving unit, which is arranged in the region of the mast,
characterized in that
the movement element is a beam-shaped leader element,
in that the at least one GPS receiving unit is attached in an upper region of the leader element,
in that the leader element comprises a linear slide guide on a front side facing away from the mast,
in that a slide is provided which is mounted vertically movably along the slide conveyor of the leader element, and
in that the at least one GPS receiving unit can be moved between an upper, first measuring position and a lower, second measuring position by means of the leader element.

### Claim 13 (depends on 12)

Construction device according to claim 12,
characterized in that
two GPS receiving units are provided, which are arranged on opposite sides of the movement element.

### Claim 14 (depends on 12)

Construction device according to claim 12,
characterized in that
the at least one GPS receiving unit comprises an antenna holder extending approximately horizontally away from the movement element, at the free end of which holder a receiving element is arranged spaced apart from the movement element.

### Claim 15 (depends on 14)

Construction device according to claim 14,
characterized in that
the antenna holder comprises a first rod-shaped portion and a second rod-shaped portion, which are arranged angled with an obtuse bend angle relative to one another.

### Claim 16 (depends on 12)

Construction device according to anyone of claim 12,
characterized in that
a working device, in particular a drilling drive, a vibration hammer or a piling unit, is arranged on the slide.

### Claim 17 (depends on 12)

Construction device according to anyone of claim 12,
characterized in that
an auxiliary winch beam is provided on an upper end of the leader element above the at least one GPS receiving unit.

### Claim 18 (depends on 17)

Construction device according to claim 17,
characterized in that
the auxiliary winch beam is mounted on the leader element rotatably about a vertical rotational axis.

### Claim 19 (depends on 12)

Construction device according to any of claim 12,
characterized in that
the construction device is a drilling device, a vibration device or a piling device.

### Claim 20 (depends on 12)

Method for operating a construction device according to anyone of claim 12, wherein, by means of the at least one GPS receiving unit, a first position measurement is taken in an upper, first measuring position in which the leader element is moved into an upper position on the mast and a second position measurement is taken in a lower, second measuring position in which the leader element is moved into a lower position on the mast.