# US 2020/0348629 A1 · Apparatus and method for estimating impacts of operational problems in advanced control operations for industrial control systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0348629 A1
- Document ID: US20200348629A1
- Status: Published application
- Kind: A1
- Application number: 16/879,243
- Filed: 2020-05-20
- Published: 2020-11-05
- Earliest claimed: 2017-06-12
- Assignees: Honeywell International Inc.
- Applicants: Honeywell International Inc.
- Inventors: Sanjay K. Dave; Andrew Trenchard; Christopher J. Webb; Matthew G. Grizzle; Mandar Vartak; Sriram Hallihole
- Web page: https://patentgrep.com/patent/US20200348629A1

## CPC

- G05B 13/041: {in which a variable is automatically adjusted to optimise the performance}
- G05B 19/406: characterised by monitoring or safety (G05B19/19 takes precedence)
- G05B 19/4063: Monitoring general control system (G05B19/4062 takes precedence)
- G05B 19/41875: {characterised by quality surveillance of production}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G05B 23/0272: {Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user}
- G05B 2219/23292: Use of model of process, divided in part models with IN, OUT and actuator
- G05B 2219/31359: Object oriented model for fault, quality control
- G05B 2219/37001: Measuring problems
- Y02P 80/40: Minimising material used in manufacturing processes
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method includes obtaining data associated with operation of a model-based industrial process controller. The method also includes identifying at least one estimated impact of at least one operational problem of the industrial process controller, where each estimated impact is expressed in terms of a lost opportunity associated with operation of the industrial process controller. The method further includes presenting the at least one estimated impact to a user. The at least one estimated impact could include impacts associated with noise or variance in process variables used by the industrial process controller, misconfiguration of an optimizer in the industrial process controller, one or more limits on one or more process variables, a quality of at least one model used by the industrial process controller, a quality of one or more inferred properties used by the industrial process controller, or one or more process variables being dropped from use by the industrial process controller.

## Claims

### Claim at position 1

1-21. (canceled)

### Claim 22

A method comprising:
receiving, from each of one or more industrial process components, data, the data indicative of a current operational state of the one or more industrial process components in an industrial process;
determining, based on the received data, whether one or more aberrant operating conditions for each of the one or more industrial process components is present;
in accordance with a determination that one or more aberrant operating conditions is present in at least one of the one or more industrial process components, determining at least one impact of the one or more aberrant operating conditions on the industrial process; and
presenting the determined at least one impact of the one or more aberrant operating conditions on the industrial process.

### Claim 23 (depends on 22)

The method of claim 22, further comprising:
determining, for each of two or more aberrant operating conditions, the impact on the industrial process; and
presenting the determined at least one impact of the two or more aberrant operating conditions on the industrial process in order of highest impact.

### Claim 24 (depends on 22)

The method of claim 22, further comprising:
determining a corrective action for each of the one or more aberrant operating conditions for each of the one or more industrial process components, the corrective action, if implemented, reducing the impact of the one or more aberrant operating conditions for each of the one or more industrial process components; and
presenting the corrective action for each of the one or more aberrant operating conditions for each of the one or more industrial process components.

### Claim 25 (depends on 24)

The method of claim 24, further comprising:
implementing, without human intervention, the determined corrective action for each of the one or more aberrant operating conditions for each of the one or more industrial process components.

### Claim 26 (depends on 22)

The method of claim 22, further comprising:
determining, based on the received data, whether one or more aberrant operating conditions for each of the one or more industrial process components is present by determining the received data varies from an expected operational state by more than a predetermined amount.

### Claim 27 (depends on 22)

The method of claim 22, further comprising:
determining, based on the received data, whether one or more aberrant operating conditions for each of the one or more industrial process components is present by determining the received data varies from an average of the received data over a predetermined time by a predetermined amount.

### Claim 28 (depends on 22)

The method of claim 22, where determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining an efficiency of the industrial process operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 29 (depends on 22)

The method of claim 22, wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining a throughput of the industrial process operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 30 (depends on 22)

The method of claim 22 wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process including determining an energy consumption of the industrial process operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 31 (depends on 22)

The method of claim 22 wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining an economic cost of the industrial process operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 32 (depends on 22)

The method of claim 22 wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining a noise or a variance in one or more process variables operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 33 (depends on 22)

The method of claim 22 wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining a misconfiguration of an industrial process controller used in controlling one or more of the industrial process components.

### Claim 34 (depends on 22)

The method of claim 22, wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining one or more limits on one or more process variables operating under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 35 (depends on 22)

The method of claim 22, wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining a quality of at least one model used by an industrial process controller in controlling one or more of the industrial process components under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 36 (depends on 22)

The method of claim 22, wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes determining a quality of at least one inferred properties used by an industrial process controller in controlling one or more of the industrial process components under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 37 (depends on 22)

The method of claim 22, wherein determining at least one impact of the one or more aberrant operating conditions on the industrial process includes identifying one or more process variables dropped from use by an industrial process controller in controlling one or more of the industrial process components under the aberrant operating conditions for at least one of the one or more industrial process components.

### Claim 38

An apparatus comprising:
at least one interface configured to receive from each of one or more industrial process components, data, the data indicative of a current operational state of the one or more industrial process components in an industrial process;
a user interface;
at least one processor operatively coupled to the at least one interface and the user interface, the at least one processor configured to:
determine, based on the received data, whether one or more aberrant operating conditions for each of the one or more industrial process components is present;
in accordance with a determination that one or more aberrant operating conditions is present in at least one of the one or more industrial process components, determine at least one impact of the one or more aberrant operating conditions on the industrial process;
present on the user interface one or more or the aberrant operating conditions along with the corresponding determined at least one impact;
receive via the user interface user input that resolves one or more of the presented aberrant operating conditions; and
operate the industrial process with the one or more aberrant operating conditions resolved.

### Claim 39 (depends on 38)

The apparatus of claim 38, wherein the at least one processor is further configured to:
determine, for each of two or more aberrant operating conditions, the impact on the industrial process; and
present the determined at least one impact of the two or more aberrant operating conditions on the industrial process in order of highest impact.

### Claim 40 (depends on 38)

The apparatus of claim 38, wherein the at least one processor is further configured to:
determine a corrective action for each of the one or more aberrant operating conditions for each of the one or more industrial process components, the corrective action, if implemented, reduces the impact of the one or more aberrant operating conditions for each of the one or more industrial process components; and
present on the user interface the corrective action for each of the one or more aberrant operating conditions for each of the one or more industrial process components.

### Claim 41

A non-transitory computer readable medium containing instructions that when executed cause at least one processing device to:
receive, from each of one or more industrial process components, data, the data indicative of a current operational state of the one or more industrial process components in an industrial process;
determine, based on the received data, whether one or more aberrant operating conditions for each of the one or more industrial process components is present;
in accordance with a determination that one or more aberrant operating conditions is present in at least one of the one or more industrial process components, determine at least one impact of the one or more aberrant operating conditions on the industrial process; and
present the determined at least one impact of the one or more aberrant operating conditions on the industrial process.
