# US 2020/0347565 A1 · System to remove snice from pavement and method therefor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0347565 A1
- Document ID: US20200347565A1
- Status: Published application
- Kind: A1
- Application number: 16/869,551
- Filed: 2020-05-07
- Published: 2020-11-05
- Earliest claimed: 2019-05-02
- Inventors: Richard F. Thomson, JR.
- Web page: https://patentgrep.com/patent/US20200347565A1

## CPC

- E01H 5/00: Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice (by applying de-icing agents E01H10/00; obstruction removers on vehicles B60R19/00; sand, gravel or salt spreaders E01C19/20)
- E01H 5/061: {by scraper blades}
- E01H 5/098: {about horizontal or substantially horizontal axises perpendicular or substantially perpendicular to the direction of clearing}
- E01H 5/12: Apparatus or implements specially adapted for breaking, disintegrating, or loosening layers of ice or hard snow {with or without clearing or removing (E01H5/10 takes precedence); Roughening ice or hard snow by means of tools (by means of gritting materials E01H10/00; roughening or breaking-up pavements E01C23/08, E01C23/12)}
- E01H 10/007: {Mobile apparatus specially adapted for preparing or applying liquid or semi-liquid thawing material or spreading granular material on wintry roads}
- E01H 5/10: by application of heat {for melting snow or ice, whether cleared or not, combined or not with clearing or removing mud or water, e.g. burners for melting in situ, heated clearing instruments} (stationary blowing or paving heating means E01C11/26) {; Cleaning snow by blowing or suction only}
- E01H: STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING {OR PREVENTING} FOG IN GENERAL {CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS}(cleaning in general B08B)

## Abstract

A system that is towed behind a vehicle to remove snice from pavement. The system includes a trailer. The trailer includes a longitudinal substantially rigid frame structure, a trailer hitch connected to a front end of the trailer for selective connection-disconnection to the vehicle, and a suspension appliance connected to a rear portion of the trailer to separate at least a rear portion of the frame structure from the pavement. At least two additive snice removal tools are connected to the frame structure and located underneath the trailer and over the pavement, each of the tools enabling a different type of snice removal from the pavement when towing the system behind the vehicle to remove snice from the pavement.

## Claims

### Claim 1

A system that is towed behind a vehicle to remove snice from pavement comprising:
a trailer comprising:
a longitudinal substantially rigid frame structure with torqueing capability in response to towing of the system when removing snice,
a trailer hitch connected to a front end of the trailer wherein the trailer hitch enables selective connection-disconnection to the vehicle and separation of a front portion of the frame structure from the pavement when connected to the vehicle, and
a suspension appliance connected to a rear portion of the trailer to separate at least a rear portion of the frame structure from the pavement wherein the suspension appliance comprises at least one axel having at least two wheels rotatably secured thereto and capable of moving over the pavement and at least one strut securing the axel to the frame structure; and,
at least two additive snice removal tools connected to the frame structure and located underneath the trailer and over the pavement, each of the tools enabling a different type of snice removal from the pavement when towing the system behind the vehicle to remove snice from the pavement.

### Claim 2 (depends on 1)

The system of claim 1, wherein at least one of the additive snice removal tools comprises a duplicate of such tool.

### Claim 3 (depends on 2)

The system of claim 2, wherein the duplicate of such tool is placed sequentially behind the tool for a same type of snice removal from the pavement.

### Claim 4 (depends on 1)

The system of claim 1, further comprising a hitch area substantially rigid frame structure with torqueing capability in response to towing of the system when removing snice, the hitch area located between the trailer hitch and the front end of the trailer.

### Claim 5 (depends on 4)

The system of claim 4, further comprising at least one additive snice removal tool connected to the hitch area frame structure and located underneath this frame structure and over the pavement.

### Claim 6 (depends on 5)

The system of claim 5, wherein each of the tools enabling a different type of snice removal from the pavement.

### Claim 7 (depends on 1)

The system of claim 1, further comprising at least one trailer stabilizer connected to the frame structure at the front end of the trailer and configured to enable selective connection-disconnection to the vehicle to provide additional stability to the trailer in response to towing of the system when removing snice.

### Claim 8 (depends on 1)

The system of claim 1, wherein each additive snice removal tools is a member from the group comprising chopper, elongated blade, rotating brush, air blower, snice vacuum, solid spreader and liquid sprayer.

### Claim 9 (depends on 8)

The system of claim 8, wherein each additive snice removal tool is sequentially positioned for a type of snice removal from the pavement that will further lessen an amount of snice remaining on the pavement from the tool in front of it when the system is towed behind the vehicle.

### Claim 10 (depends on 9)

The system of claim 9, wherein sequentially positioned comprises at least two members one following the other, directly or indirectly, from the group of: chopper followed by elongated blade, followed by rotating brush, followed by air blower, followed by snice vacuum, followed by solid spreader, followed by liquid spreader.

### Claim 11

A method of using a system behind a vehicle for removing snice from pavement comprising the steps:
towing a trailer behind the vehicle, the trailer comprising a longitudinal substantially rigid frame structure with torqueing capability in response to towing of the trailer when removing snice;
selectively connecting the trailer to the vehicle and separating a front portion of the frame structure from the pavement when the trailer is connected to the vehicle;
providing a suspension appliance to a rear portion of the trailer to separate at least a rear portion of the frame structure from the pavement wherein the suspension appliance comprises at least one axel having at least two wheels rotatably secured thereto and capable of moving over the pavement and at least one strut securing the axel to the frame structure; and,
enabling at least two different types of additive snice removal from the pavement when towing the trailer behind the vehicle to remove snice from the pavement.

### Claim 12 (depends on 11)

The method of claim 11, wherein enabling comprises connecting at least two additive snice removal tools to the frame structure and locating them underneath the trailer and over the pavement.

### Claim 13 (depends on 11)

The method claim 11, wherein enabling comprises two steps of a same type of additive snice removal from the pavement and one step of a different type of additive snice removal from the pavement.

### Claim 14 (depends on 13)

The method of claim 13, wherein the two steps of a same type of additive snice removal from the pavement both precede the one step of the different type of additive snice removal from the pavement.

### Claim 15 (depends on 11)

The method of claim 11, further comprising locating before a front end of the trailer a hitch area substantially rigid frame structure with torqueing capability in response to towing of the trailer when removing snice.

### Claim 16 (depends on 15)

The method of claim 15, further comprising enabling at least one type of additive snice removal in proximity to the hitch area when towing the trailer behind the vehicle to remove snice from the pavement.

### Claim 17 (depends on 16)

The method of claim 16, wherein each enabling step is for a different type of additive snice removal from the pavement.

### Claim 18 (depends on 11)

The method of claim 11, wherein each additive snice removal type is a member from the group comprising chopping, elongated blading, rotary brushing, air blowing, snice vacuuming, solid spreading and liquid spraying.

### Claim 19 (depends on 18)

The method of claim 18, wherein enabling comprises sequentially staging each additive snice removal type to further lessen an amount of snice remaining on the pavement from the additive snice removal step that preceded it when the trailer is towed behind the vehicle for snice removal from the pavement.

### Claim 20 (depends on 19)

The method of claim 19, wherein sequentially staging comprises at least two members one following the other, directly or indirectly, from the group of: chopping followed by elongated blading, followed by rotary brushing, followed by air blowing, followed by snice vacuuming, followed by solid spreading, followed by liquid spreading.

### Claim 21 (depends on 11)

The method of claim 11, further comprising selectively disconnecting the trailer from the vehicle when the trailer is not needed for snice removal from the pavement.

### Claim 22 (depends on 11)

The method of claim 11, further comprising selectively adjusting the type of additive snice removal.

### Claim 23 (depends on 21)

The method of claim 21, wherein adjusting comprises electronically-controlled.
