# US 2020/0347557 A1 · Method for track position improvement by means of a track-movable track-tamping machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0347557 A1
- Document ID: US20200347557A1
- Status: Published application
- Kind: A1
- Application number: 16/960,471
- Filed: 2019-01-17
- Published: 2020-11-05
- Earliest claimed: 2018-01-22
- Assignees: HP3 Real GmbH
- Applicants: HP3 Real GmbH
- Inventors: Bernhard Lichtberger
- Web page: https://patentgrep.com/patent/US20200347557A1

## CPC

- E01B 35/00: Applications of measuring apparatus or devices for track-building purposes (apparatus on locomotives or cars to indicate or record bad track sections B61K9/00; measuring angles, linear dimensions, or irregularities in general G01B, G01C)
- E01B 35/10: for aligning
- B61K 9/08: Measuring installations for surveying permanent way
- E01B 27/17: combined with means for lifting, levelling or slewing the track
- G01B 5/14: for measuring distance or clearance between spaced objects or spaced apertures (G01B5/24 takes precedence)
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)
- B61K: AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS

## Abstract

A method is proposed for track position improvement by means of a track-movable track-tamping machine (6) with a three-point work measurement system having three measurement carriages (A, B, C) and a cord (9) stretched therebetween, a tamping unit (5), a lifting and straightening unit (8) for tracks and in particular an odometer. The position of the track after the correction work of the track-tamping machine (6) is recorded by means of a measurement system. In order to reduce the straightening error, it is proposed that a computer (R) calculates the difference between a predetermined desired track position (1) and an actual position recorded by the measurement system, i.e. a residual error (Kh), and in that the position of the rear cord end on the rear measurement carriage (C) of the track-tamping machine (6) of the three-point work measurement system is continuously corrected in such a way that the rear cord end on the measurement carriage (C) is guided on the desired track position (1).

## Claims

### Claim 1

A method comprising:
performing correction work providing track position improvement using a track-movable track-tamping machine with a three-point work measurement system having three measurement carriages and a cord stretched therebetween, a tamping unit, a lifting and straightening unit for tracks, and
recording a position of the track after the correction work of the track-tamping machine using the measurement system,
wherein a computer calculates a difference between a predetermined desired track position and an actual position recorded by the measurement system, as a residual error, and
wherein a position of a rear cord end on a rear measurement carriage of the track-tamping machine of the three-point work measurement system is continuously corrected so that the rear cord end on the rear measurement carriage is guided on the desired track position.

### Claim 2 (depends on 1)

A method according to claim 1, wherein the position of the rear cord end on the measurement carriage for forming an initial ramp is automatically guided towards the desired track position from a zero correction at a start of work so that the track corrections are continuously built up.

### Claim 3 (depends on 1)

A method according to claim 1, wherein the position of the cord end on the measurement carriage for forming an end ramp is automatically guided from the desired track position to a zero correction at the end of work so that the track corrections are continuously reduced.

### Claim 4 (depends on 1)

A method according to claim 1,
wherein an inertial measurement system is operatively associated with the rear measurement carriage, and the inertial measurement system records the position of the track after the correction work of the tamping machine.

### Claim 5 (depends on 1)

A method according to claim 1, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 6 (depends on 2)

A method according to claim 2, wherein the position of the cord end on the measurement carriage for forming an end ramp is automatically guided from the desired track position to a zero correction at the end of work so that the track corrections are continuously reduced.

### Claim 7 (depends on 2)

A method according to claim 2, wherein an inertial measurement system is operatively associated with the rear measurement carriage, and the inertial measurement system records the position of the track after the correction work of the tamping machine.

### Claim 8 (depends on 3)

A method according to claim 3, wherein an inertial measurement system is operatively associated with the rear measurement carriage and the inertial measurement system records the position of the track after the correction work of the tamping machine.

### Claim 9 (depends on 6)

A method according to claim 6, wherein an inertial measurement system is operatively associated with the rear measurement carriage and the inertial measurement system records the position of the track after the correction work of the tamping machine.

### Claim 10 (depends on 2)

A method according to claim 2, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 11 (depends on 3)

A method according to claim 3, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 12 (depends on 6)

A method according to claim 6, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 13 (depends on 2)

A method according to claim 2, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 14 (depends on 3)

A method according to claim 3, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.

### Claim 15 (depends on 6)

A method according to claim 6, wherein the determination of the residual errors of the track after the correction work is carried out by extrapolation from measurements of a subsequent acceptance three-point measurement system with three measurement carriages, one of which may be in the three-point work measurement system and a cord stretched therebetween.
