# US 2020/0331215 A1 · Moulding arrangement

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0331215 A1
- Document ID: US20200331215A1
- Status: Published application
- Kind: A1
- Application number: 16/757,640
- Filed: 2018-10-22
- Published: 2020-10-22
- Earliest claimed: 2017-10-23
- Assignees: McLaren Automotive Limited
- Applicants: McLaren Automotive Limited
- Inventors: Claudio Santoni
- Web page: https://patentgrep.com/patent/US20200331215A1

## CPC

- B29C 43/04: using movable moulds
- B29C 33/0088: {Multi-face stack moulds}
- B29C 43/361: {with pressing members independently movable of the parts for opening or closing the mould, e.g. movable pistons (transfer moulding B29C45/02; injection-compression moulding B29C45/561)}
- B29C 45/04: using movable moulds {or mould halves}(B29C45/08 takes precedence)
- B29C 70/48: and impregnating the reinforcements in the closed mould, e.g. resin transfer moulding [RTM] {, e.g. by vacuum}
- B29C 70/54: Component parts, details or accessories; Auxiliary operations {, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing}
- B29C 43/18: incorporating preformed parts or layers, e.g. compression moulding around inserts or for coating articles {(B29C43/206 takes precedence)}
- B29C 2043/046: {travelling between different stations, e.g. feeding, moulding, curing stations}
- B29C 2043/3615: {Forming elements, e.g. mandrels or rams or stampers or pistons or plungers or punching devices}
- B29C 2043/3621: {a plurality of individual elements acting on the material in the same or diferent directions, e.g. making tubular T-joints, profiles}
- B29K 2063/00: Use of {EP, i.e.} epoxy resins {or derivatives thereof}, as moulding material
- B29K 2105/06: containing reinforcements, fillers or inserts
- B29K 2105/08: of continuous length, e.g. cords, rovings, mats, fabrics, strands or yarns
- B29K 2105/0872: {Prepregs}
- B29K 2105/089: {fabric}
- B29K 2463/00: Use of {EP, i.e.} epoxy resins {or derivatives thereof} as filler
- B29L 2031/3005: {Body finishings}
- B29L 2031/3085: {Wings}
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- B29K: INDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR {MOULDS, } REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
- B29L: INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES

## Abstract

A method for forming a composite component, the method comprising: providing a first mould tool and a second mould tool, the first and second mould tools being configured so as to be capable of defining at least part of a mould cavity between them, and the second mould tool having a moulding surface defined by at least two demountable mould bodies; attaching the first mould tool to a press at a first workstation; subsequently, at a second workstation spaced from the first workstation, loading at least part of the second mould tool with reinforcement material whilst the first mould tool remains attached to the press at the first workstation; moving the second mould tool to the press at the first workstation in such a position as to confront the first mould tool; causing the press to effect relative movement of the first and second tools to bring the first and second tools into mating arrangement so as to define a mould cavity therebetween; and setting in shape the reinforcement material located in the mould cavity.

## Claims

### Claim 1

A method for forming a composite component, the method comprising:
providing a first mould tool and a second mould tool, the first and second mould tools being configured so as to be capable of defining at least part of a mould cavity between them, and the second mould tool having a moulding surface defined by at least two demountable mould bodies;
attaching the first mould tool to a press at a first workstation;
subsequently, at a second workstation spaced from the first workstation, loading at least part of the second mould tool with reinforcement material whilst the first mould tool remains attached to the press at the first workstation;
moving the second mould tool to the press at the first workstation in such a position as to confront the first mould tool;
causing the press to effect relative movement of the first and second tools to bring the first and second tools into mating arrangement so as to define a mould cavity therebetween; and
setting in shape the reinforcement material located in the mould cavity.

### Claim 2 (depends on 1)

A method as claimed in claim 1, wherein during the said loading step the demountable mould bodies of the second tool are demounted from each other.

### Claim 3 (depends on 1)

A method as claimed in claim 1, wherein during the step of moving the second mould tool the demountable bodies of the second mould tool are fixed in relative position.

### Claim 4 (depends on 1)

A method as claimed in claim 1, wherein the method comprises injecting a matrix material into the mould cavity and the step of setting in shape the reinforcement material comprises solidifying the matrix material.

### Claim 5 (depends on 4)

A method as claimed in claim 4, comprising injecting the matrix material into the mould cavity through the first mould tool.

### Claim 6

(canceled)

### Claim 7 (depends on 1)

A method as claimed in claim 1, wherein the press effects relative movement of the first tool and at least one of the demountable mould bodies to bring them into mating arrangement.

### Claim 8 (depends on 1)

A method as claimed in claim 1, wherein the step of loading the second mould tool with reinforcement material comprises altering the shape of the reinforcement material relative to at least part of the second mould tool.

### Claim 9 (depends on 1)

A method as claimed in claim 1, comprising the steps, after the said setting step, of:
causing the press to effect relative movement of the first and second tools to bring the first and second tools out of mating arrangement;
removing the second mould tool from the press whilst the first mould tool remains attached to the press at the first workstation; and
removing from the second tool a shaped article formed of the reinforcement material.

### Claim 10 (depends on 1)

A method as claimed in claim 1, comprising the steps, after the said setting step, of:
causing the press to effect relative movement of the first and second tools to bring the first and second tools out of mating arrangement;
removing the second mould tool from the press whilst the first mould tool remains attached to the press at the first workstation;
separating the demountable tool bodies of the second mould tool; and
removing from the second tool a shaped article formed of the reinforcement material.

### Claim 11 (depends on 1)

A method as claimed in claim 1 comprising:
after the said step of loading at least part of the second mould tool, at the second workstation engaging with that (“first”) part of the second mould tool a further part of the second mould tool, the further part of the second mould tool being configured so as to be capable of defining at least part of a mould cavity between itself, the first mould tool and the first part of the second mould tool;
and wherein the step of moving the second mould tool to the press comprises moving the first part of the second mould tool and the further part of the second mould tool together to the press.

### Claim 12

(canceled)

### Claim 13 (depends on 1)

A method as claimed in claim 1, comprising:
providing a third mould tool configured so as to be capable of defining at least part of a mould cavity between it and the first mould tool;
at a third workstation spaced from the first and second workstations, loading the third mould tool with reinforcement material whilst the first mould tool remains attached to the press at the first workstation and the second mould tool is located at the first workstation; and
whilst the second mould tool is absent from the first workstation:
(i) moving the third mould tool to the press at the first workstation in such a position as to confront the first mould tool;
(ii) causing the press to effect relative movement of the first and third mould tools to bring the first and third tools into mating arrangement so as to define a mould cavity therebetween;
(iii) injecting a matrix material into that mould cavity; and
(iv) solidifying the matrix material.

### Claim 14 (depends on 1)

A method as claimed in claim 1, comprising:
providing a third mould tool configured so as to be capable of defining at least part of a mould cavity between it and the first mould tool;
at the second workstation, loading the third mould tool with reinforcement material whilst the first mould tool remains attached to the press at the first workstation and the second mould tool is located at a third workstation spaced from the first and second workstations; and
whilst the second mould tool is absent from the first workstation:
(i) moving the third mould tool to the press at the first workstation in such a position as to confront the first mould tool;
(ii) causing the press to effect relative movement of the first and third mould tools to bring the first and third tools into mating arrangement so as to define a mould cavity therebetween;
(iii) injecting a matrix material into that mould cavity; and
(iv) solidifying the matrix material.

### Claim 15

(canceled)

### Claim 16

(canceled)

### Claim 17 (depends on 1)

A method as claimed in claim 1, wherein the step of moving the second mould tool comprises moving the second mould tool on a path having a horizontal component.

### Claim 18

(canceled)

### Claim 19 (depends on 1)

A method as claimed in claim 1, wherein the step of setting in shape the reinforcement material comprises heating the first mould tool.

### Claim 20 (depends on 1)

A method as claimed in claim 1, comprising heating the first mould tool when no other mould tool is confronting it in the press.

### Claim 21 (depends on 1)

A method as claimed in claim 1, wherein when the first and second mould tools define the mould cavity therebetween, they do so in cooperation with one or more further mould tools.

### Claim 22 (depends on 1)

A method as claimed in claim 1, wherein the mould cavity is a closed mould cavity.

### Claim 23 (depends on 1)

A method as claimed in claim 1, wherein the mould cavity is defined by moulding surfaces of the first and second mould tools.

### Claim 24 (depends on 1)

A method as claimed in claim 1, comprising
after the said step of loading at least part of the second mould tool with reinforcement material (“the first reinforcement material”) at the second workstation, loading at least part of the second mould tool at the second workstations with further reinforcement material in such a way that the further reinforcement material overlaps at least part of the first reinforcement material

### Claim 25 (depends on 24)

A method as claimed in claim 24, comprising connecting the first and further reinforcement materials to each other with a joining material in at least part of the overlapping area.

### Claim 26

(canceled)
