# US 2020/0302024 A1 · Method and system of preparing engineering data for industrial control systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0302024 A1
- Document ID: US20200302024A1
- Status: Published application
- Kind: A1
- Application number: 16/359,014
- Filed: 2019-03-20
- Published: 2020-09-24
- Earliest claimed: 2019-03-20
- Assignees: Yokogawa Electric Corporation
- Applicants: Yokogawa Electric Corporation
- Inventors: Hideki Murata; Mark Anthony De Castro Cu-Unjieng; Naing Oo Lin; Archie Sambitan Orido; Efendi Supiman; Thin Sapal Yu; Janet Tria
- Web page: https://patentgrep.com/patent/US20200302024A1

## CPC

- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G06F 30/00: Computer-aided design [CAD]
- G06F 8/20: Software design
- G06F 8/24: {Object-oriented}
- G06F 8/35: model driven
- G06F 8/36: Software reuse
- G05B 2219/32155: Editor and library for objects
- G05B 2219/32158: Object groups, for object replication, naming, messaging and retrieving
- G05B 2219/32161: Object oriented control, programming
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

An industrial plant module-based engineering method includes the following processes. The process is for duplicating a source engineering template having one or more source child templates to create a duplicated engineering template having one or more duplicated child templates, without duplicating any instances. The process is for selecting at least one child instance instantiated from the source engineering template and having an original link to the source engineering template. The process is for changing the original link into a new link between the selected at least one child instance and the duplicated engineering template. The selected at least one child instance has the new link to the duplicated engineering template and is free of the original link to the source engineering template, and wherein unselected one or more child instances remain to have the original link to the source engineering template.

## Claims

### Claim 1

An industrial plant module-based engineering method comprising:
duplicating a source engineering template having one or more source child templates to create a duplicated engineering template having one or more duplicated child templates which correspond to the one or more source child templates, respectively, without duplicating any instances with one or more child instances which have been instantiated from the one or more source child templates in the source engineering template, wherein the duplicated engineering template is free of any instances and wherein each of the one or more child instances has an original link to the source engineering template;
selecting at least one child instance among one or more child instances which have been instantiated from the source engineering template, wherein the selected at least one child instance has an original link to the source engineering template; and
changing the original link into a new link between the selected at least one child instance and the duplicated engineering template, wherein the selected at least one child instance has the new link to the duplicated engineering template and is free of the original link to the source engineering template, and wherein unselected one or more child instances remain to have the original link to the source engineering template.

### Claim 2 (depends on 1)

The industrial plant module-based engineering method according to claim 1, further comprising:
instantiating the source engineering template having the one or more source child templates to create one or more instances which each have one or more child instances before duplicating the source engineering template having the one or more source child templates.

### Claim 3 (depends on 2)

The industrial plant module-based engineering method according to claim 2, wherein the source engineering template having the one or more source child templates comprises a source group class module having one or more source child class modules which have links to a source class module, and
wherein the one or more child instances, which have been instantiated from the source engineering template, comprise one or more child application modules having links to the source class module.

### Claim 4 (depends on 3)

The industrial plant module-based engineering method according to claim 3, further comprising:
instantiating the source class module to create one or more class-based application modules which have links to the source class module.

### Claim 5 (depends on 4)

The industrial plant module-based engineering method according to claim 4, further comprising:
duplicating the source class module to create a duplicated class module.

### Claim 6 (depends on 5)

The industrial plant module-based engineering method according to claim 5, further comprising:
changing, after duplicating the source class module to have created a duplicated class module, the link between a selected class-based application module of the one or more class-based application modules and the source class module into a link between the selected class-based application module and the duplicated class module.

### Claim 7 (depends on 5)

The industrial plant module-based engineering method according to claim 5, further comprising:
changing, after duplicating the source class module to have created the duplicated class module, the link between a selected child application module of the one or more child application modules and the source class module into a link between the selected child application module and the duplicated class module.

### Claim 8 (depends on 5)

The industrial plant module-based engineering method according to claim 5, further comprising:
duplicating the source group class module having one or more source child class modules which have links to a source class module to create a duplicated group class module having the one or more duplicated child class modules which have links to the source class module.

### Claim 9 (depends on 8)

The industrial plant module-based engineering method according to claim 8, further comprising:
instantiating the source group class module having the one or more source child class modules to create one or more group application modules which have links to the source group class module, wherein the one or more group application modules have one or more child application modules links to the source class module.

### Claim 10 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
changing, after instantiating the source group class module to have created the one or more group application modules, the link between a selected group application module of the one or more group application modules and the source group class module into a link between the selected group application module and the duplicated group class module.

### Claim 11 (depends on 10)

The industrial plant module-based engineering method according to claim 10, further comprising:
changing, after changing the link between the selected group application module and the source group class module into the link between the selected group application module and the duplicated group class module, the link between a selected child application module of the one or more child application modules of the selected group application module and the source child class module into a link between the selected child application module and the duplicated child class module.

### Claim 12 (depends on 11)

The industrial plant module-based engineering method according to claim 11, further comprising:
changing, after duplicating the source class module to have created a duplicated class module, the link between a selected class-based application module of the one or more class-based application modules and the source class module into a link between the selected class-based application module and the duplicated class module.

### Claim 13 (depends on 12)

The industrial plant module-based engineering method according to claim 12, further comprising:
changing, after duplicating the source class module to have created the duplicated class module, the link between a selected child application module of the one or more child application modules and the source class module into a link between the selected child application module and the duplicated class module.

### Claim 14 (depends on 9)

The industrial plant module-based engineering method according to claim 9, wherein each group class module includes at least one allocation which defines:
i) groupings of a plurality of class modules; and
ii) assignments of the class modules to multiple drawings to define complex loops of multiple logical control module drawings.

### Claim 15 (depends on 14)

The industrial plant module-based engineering method according to claim 14, wherein instantiating the source group class module comprises:
instantiating the source group class module with reflecting a hierarchy of the source group class modules to generate, in an application structure navigator, a group application module and a hierarchy of the group application module from the group class module; and
instantiating the child class module to generate, in the application structure navigator, a child application module from the child class module.

### Claim 16 (depends on 15)

The industrial plant module-based engineering method according to claim 15, further comprising:
updating the allocation of each group class module and a respective topology of the complex loops of each group class module, and the group module update engine configured to update an allocation of each group application module and a respective topology of the complex loops of each group application module.

### Claim 17 (depends on 16)

The industrial plant module-based engineering method according to claim 16, further comprising:
binding, based on the at least one allocation of the group class module, the group application module and a legacy application module (legacy APM) to drawings of field controllers in an industrial plant, wherein the legacy application module is at least one of: iii) a class-based application module which refers to a source class module: and iv) a classless application module which does not refer to any source class module.

### Claim 18 (depends on 17)

The industrial plant module-based engineering system according to claim 17, wherein each group class module has a plurality of child class modules, folders, and a hierarchy of the child class modules and the folders.

### Claim 19 (depends on 18)

The industrial plant module-based engineering system according to claim 18, wherein each group class module comprises:
a design document information which is used to generate a document of module design;
an attachment which is used to store artifacts related to the class module; and
the allocation which defines groupings of class modules and assignments of the class modules to plural control drawings to define complex loops for drawings of field control systems.

### Claim 20 (depends on 19)

The industrial plant module-based engineering system according to claim 19, wherein the class module comprises:
a design document information which is used to generate a document of module design;
an attachment which is used to store artifacts related to the class module;
a control logic that contains a logic information of process control;
an alarm attribute; and
turning parameters.

### Claim 21 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
selecting part of the child class modules to be not instantiated, to generate a set of different group application modules from a single group class module.

### Claim 22 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
assigning the multiple logical control drawings, which are defined in each group class module, to a respective one of a plurality of physical field control systems.

### Claim 23 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
performing at least one of addition and deletion of the child application module which refers to the group application module that is instantiated from the group class module, in case that the group module update engine updates the respective topology of the complex loops of the group class module.

### Claim 24 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
updating contents of the child application module which refers to the group application module that is instantiated from the group class module, in case that the group module update engine updates the respective topology of the complex loops of the group class module.

### Claim 25 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
performing at least one of addition and deletion of the child application module which refers to the group application module that is instantiated from the group class module, in case that the group module update engine updates the respective topology of the complex loops of each group application module.

### Claim 26 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
updating contents of the child application module which refers to the group application module that is instantiated from the group class module, in case that the group module update engine updates the respective topology of the complex loops of each group application module.

### Claim 27 (depends on 9)

The industrial plant module-based engineering method according to claim 9, wherein each group application module includes at least one allocation which defines:
iii) groupings of application modules; and
iv) assignments of the application modules to multiple control drawings to define complex loops of multiple logical control drawings.

### Claim 28 (depends on 9)

The industrial plant module-based engineering method according to claim 9, further comprising:
updating the allocation of each group application module and the respective topology of the complex loops of each group application module if the group module update engine updated the allocation of each group class module and the respective topology of the complex loops of each group class module.
