# US 2020/0299911 A1 · Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0299911 A1
- Document ID: US20200299911A1
- Status: Published application
- Kind: A1
- Application number: 16/874,643
- Filed: 2020-05-14
- Published: 2020-09-24
- Earliest claimed: 2015-12-14
- Assignees: S&P Clever Reinforcement Company AG
- Applicants: S&P Clever Reinforcement Company AG
- Inventors: Masoud Motavalli; Elyas Ghafoori
- Web page: https://patentgrep.com/patent/US20200299911A1

## CPC

- E01D 22/00: Methods or apparatus for repairing or strengthening existing bridges {(electrochemical desalination or re-alkalisation C04B41/00); Methods or apparatus for dismantling bridges}
- E01D 6/00: Truss-type bridges
- E04B 1/24: the supporting parts consisting of metal
- E04C 3/10: prestressed
- E04C 5/085: {Tensile members made of fiber reinforced plastics}
- E04G 23/0218: {Increasing or restoring the load-bearing capacity of building construction elements (E04G23/0203 and E04G23/0266 take precedence)}
- E01D 2101/32: prestressed
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).

## Claims

### Claim at position 1

1-20. (canceled)

### Claim 21

A method of reinforcing a steel structure comprising:
attaching opposing ends of at least one flat carbon fiber-reinforced polymer (CFRP) band mechanically by clamping shoes by friction forces to a steel girder of a steel structure in which the steel girder endures bending moments, and the at least one CFRP band not being glued on the steel girder by adhesive and having no direct contact with the steel girder;
disposing at least one lifting element between the steel girder and the at least one CFRP band in a region between the clamping shoes;
extending the at least one lifting element substantially perpendicular to the at least one CFRP band for tensioning the at least one CFRP band;
providing one or more supports between the steel girder and the at least one CFRP band; and
then relieving the at least one lifting element thereby the at least one CFRP band having a target tensile stress achieved therein being supported by the one or more supports and the target tensile stress in the at least one CFRP band being transferred to the steel girder, and thereby the steel girder being reinforced by the at least one CFRP band having the target tensile stress and load bearing capacity of the steel girder being enhanced.

### Claim 22 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein a tensile force generated by the at least one CFRP band is greater than 10 kN.

### Claim 23 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein the one or more supports are mechanical supports.

### Claim 24 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein the lifting element is operated hydraulically, pneumatically, electrically or mechanically.

### Claim 25 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein said extending the at least one lifting element initially generates a tensile stress in the at least one CFRP band greater than the target tensile stress for reinforcing the steel structure, and the target tensile stress is achieved by relieving the at least one lifting element after installing the one or more supports.

### Claim 26 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein the clamping shoes are attached to an underside of the steel girder of the steel structure.

### Claim 27 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein the method comprises reinforcing the steel structure by multiple of said at least one CFRP bands and the multiple CFRP bands are aligned in parallel.

### Claim 28 (depends on 21)

The method of reinforcing a steel structure according to claim 21, wherein the steel structure is a steel bridge, and the steel girder is the lower-most horizontal steel girder of the steel bridge and bears axle load on the steel bridge.

### Claim 29

A reinforced steel structure comprising:
a steel structure;
at least one flat carbon fiber-reinforced polymer (CFRP) band with opposing ends attached mechanically by clamping shoes by friction forces to a steel girder of the steel structure in which the steel girder endures bending moments, and the at least one CFRP band not being glued on the steel girder by adhesive and having no direct contact with the steel girder; the at least one CFRP band being pre-stressed by extending at least one lifting element disposed between the steel girder and the at least one CFRP band substantially perpendicular to the at least one CFRP; and
one or more supports positioned between the steel girder and the at least one CFRP band, the one or more supports supporting the at least one CFRP band having a target tensile stress achieved therein after relieving the at least one lifting element; thereby the steel structure being reinforced by the at least one CFRP band as the target tensile stress therein being transferred to the steel girder, and the reinforced steel structure having an enhanced load bearing capacity of the steel girder.

### Claim 30 (depends on 29)

The reinforced steel structure according to claim 29, wherein a tensile force generated by the at least one CFRP band is greater than 10 kN.

### Claim 31 (depends on 29)

The reinforced steel structure according to claim 29, wherein the clamping shoes are attached to an underside of the steel girder of the steel structure.

### Claim 32 (depends on 29)

The reinforced steel structure according to claim 29, wherein the reinforced steel structure comprises multiple said at least one CFRP band, and the multiple CFRP bands are aligned in parallel.

### Claim 33 (depends on 29)

The reinforced steel structure according to claim 29, wherein the steel structure is a steel bridge, and the steel girder is the lower-most horizontal steel girder of the steel bridge and bears axle load on the steel bridge.

### Claim 34

A method of reinforcing a steel structure comprising:
attaching opposing ends of at least one flat carbon fiber-reinforced polymer (CFRP) band mechanically by clamping shoes by friction forces to each of a plurality of steel girders of a steel structure in which the plurality of steel girders endure bending moments, and the at least one CFRP band not being glued on the plurality of steel girders by adhesive and having no direct contact with the plurality of steel girders;
disposing at least one lifting element between each of the plurality of steel girders and respective at least one CFRP band in a region between the clamping shoes;
extending the at least one lifting element substantially perpendicular to respective at least one CFRP band for tensioning the respective at least one CFRP band;
providing one or more supports between each of the plurality of steel girders and the respective at least one CFRP band; and
then relieving the at least one lifting element thereby the respective at least one CFRP band having a target tensile stress achieved therein being supported by the one or more supports and the target tensile stress in the at least one CFRP band being transferred to the respective steel girder, and thereby the respective steel girder being reinforced by the respective at least one CFRP band having the target tensile stress and load bearing capacity of the respective steel girder being enhanced.

### Claim 35 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein a tensile force generated by the at least one CFRP band is greater than 10 kN.

### Claim 36 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein the lifting element is operated hydraulically, pneumatically, electrically or mechanically.

### Claim 37 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein said extending the at least one lifting element initially generates a tensile stress in the at least one CFRP band greater than the target tensile stress for reinforcing the steel structure, and the target tensile stress is achieved by relieving the at least one lifting element after installing the one or more supports.

### Claim 38 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein the clamping shoes are attached to an underside of each of the plurality of steel girders of the steel structure.

### Claim 39 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein the method comprises reinforcing the steel structure by multiple of the at least one CFRP bands over a width of the steel structure and the multiple CFRP bands are aligned in parallel.

### Claim 40 (depends on 34)

The method of reinforcing a steel structure according to claim 34, wherein the steel structure is a steel bridge, and the plurality of steel girders are the lower-most horizontal steel girders of the steel bridge and bear axle load on the steel bridge.