# US 2020/0288329 A1 · Systems and methods for coordinating initiation, preparing, vetting, scheduling, constructing, and implementing a small cell implementation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0288329 A1
- Document ID: US20200288329A1
- Status: Published application
- Kind: A1
- Application number: 16/881,565
- Filed: 2020-05-22
- Published: 2020-09-10
- Earliest claimed: 2015-04-14
- Assignees: ETAK Systems, LLC
- Applicants: ETAK Systems, LLC
- Inventors: Lee Priest; Richard Lien
- Web page: https://patentgrep.com/patent/US20200288329A1

## CPC

- H04W 16/32: Hierarchical cell structures
- G05D 1/0094: {involving pointing a payload, e.g. camera, weapon, sensor, towards a fixed or moving target}
- G05D 1/102: {specially adapted for vertical take-off of aircraft}
- G05D 1/689: Pointing payloads towards fixed or moving targets (positioning towed, pushed or suspended implements G05D1/672)
- G08G 5/55: for a single aircraft
- G08G 5/57: for unmanned aircraft
- H04L 41/145: {involving simulating, designing, planning or modelling of a network}
- H04W 16/18: Network planning tools
- B64U 2101/30: for imaging, photography or videography
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- B64U: UNMANNED AERIAL VEHICLES [UAV]; EQUIPMENT THEREFOR

## Abstract

A method for scheduling construction of a small cell is described herein. The method includes, subsequent to development of a model of the small cell, developing a draft schedule comprising a matrix including an order of when each task for construction of the small cell is to be completed; vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein; generating a revised schedule from the draft schedule based on the vetting and testing of the draft schedule; and publishing the final schedule with the model of the small cell.

## Claims

### Claim 1

A method for scheduling construction of a small cell, the method comprising:
subsequent to development of a model of the small cell, developing a draft schedule comprising a matrix including an order of when each task for construction of the small cell is to be completed;
vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein;
generating a revised schedule from the draft schedule based on the vetting and testing of the draft schedule; and
publishing the final schedule with the model of the small cell.

### Claim 2 (depends on 1)

The method of claim 1, wherein the vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein includes developing the model of infrastructure that the small cell will be mounted on based on data captured by an Unmanned Aerial Vehicle (UAV), including one of photos and video of the infrastructure, and based on construction documents of the small cell.

### Claim 3 (depends on 2)

The method of claim 2, wherein the revised schedule is based on schedule order conflicts and timing conflicts identified using the model.

### Claim 4 (depends on 2)

The method of claim 2, wherein the model of the small cell is generated based on the construction documents of the small cell and inserted into the model of the infrastructure for the vetting and testing of the draft schedule.

### Claim 5 (depends on 1)

The method of claim 1, vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein includes engaging a municipality where the small cell will be located, and generating a revised schedule from the draft schedule based on vetting and testing of the draft schedule includes ensuring the revised schedule meets municipal requirements.

### Claim 6 (depends on 1)

The method of claim 1, wherein one of the draft schedule and the revised schedule is provided to one or more of a client and sub-contractors for further feedback and or testing.

### Claim 7 (depends on 6)

The method of claim 6, wherein the steps of vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein and generating the revised schedule from the draft schedule based on vetting and testing of the draft schedule are performed iteratively including receiving feedback from the one or more of the client and the sub-contractors, ensuring the revised schedule meets municipal requirements, revising the model, and testing the revised schedule against the revised model until a final schedule is determined.

### Claim 8

A non-transitory computer-readable storage medium having computer readable code stored thereon for programming a computer for a small cell via steps comprising:
subsequent to development of a model of the small cell, developing a draft schedule comprising a matrix including an order of when each task for construction of the small cell is to be completed;
vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein;
generating a revised schedule from the draft schedule based on the vetting and testing of the draft schedule; and
publishing the final schedule with the model of the small cell.

### Claim 9 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein includes developing the model of infrastructure that the small cell will be mounted on based on data captured by an Unmanned Aerial Vehicle (UAV), including one of photos and video of the infrastructure, and based on construction documents of the small cell.

### Claim 10 (depends on 9)

The non-transitory computer-readable storage medium of claim 9, wherein the revised schedule is based on schedule order conflicts and timing conflicts identified using the model.

### Claim 11 (depends on 9)

The non-transitory computer-readable storage medium of claim 9, wherein the model of the small cell is generated based on the construction documents of the small cell and inserted into the model of the infrastructure for the vetting and testing of the draft schedule.

### Claim 12 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein includes engaging a municipality where the small cell will be located, and generating a revised schedule from the draft schedule based on vetting and testing of the draft schedule includes ensuring the revised schedule meets municipal requirements.

### Claim 13 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein one of the draft schedule and the revised schedule is provided to one or more of a client and sub-contractors for further feedback and or testing.

### Claim 14 (depends on 13)

The non-transitory computer-readable storage medium of claim 13, wherein the steps of vetting and testing the draft schedule for flow continuity and for viability of meeting deadlines outlined therein and generating the revised schedule from the draft schedule based on vetting and testing of the draft schedule are performed iteratively including receiving feedback from the one or more of the client and the sub-contractors, ensuring the revised schedule meets municipal requirements, revising the model, and testing the revised schedule against the revised model until a final schedule is determined.