# US 2020/0287695 A1 · Method for mapping modulation symbols onto resource units of allocated subframe

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0287695 A1
- Document ID: US20200287695A1
- Status: Published application
- Kind: A1
- Application number: 16/880,962
- Filed: 2020-05-21
- Published: 2020-09-10
- Earliest claimed: 2018-02-28
- Assignees: Guangdong Oppo Mobile Telecommunications Corp., Ltd.
- Applicants: Guangdong Oppo Mobile Telecommunications Corp., Ltd.
- Inventors: Zuomin WU; Zhi ZHANG
- Web page: https://patentgrep.com/patent/US20200287695A1

## CPC

- H04L 5/001: {the frequencies being arranged in component carriers}
- H04L 5/0057: {Physical resource allocation for CQI}
- H04L 5/0044: {Allocation of payload; Allocation of data channels, e.g. PDSCH or PUSCH}
- H04L 5/0053: {Allocation of signalling, i.e. of overhead other than pilot signals}
- H04L 27/0006: {Assessment of spectral gaps suitable for allocating digitally modulated signals, e.g. for carrier allocation in cognitive radio (for spectrum sharing between different networks H04W16/14)}
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/0453: Resources in frequency domain, e.g. a carrier in FDMA
- H04L 5/0007: {the frequencies being orthogonal, e.g. OFDM(A) or DMT}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A method and a user equipment (UE) for modulation symbol mapping are provided. The method comprises mapping the CQI modulation symbols onto resource units of the second slot of the allocated subframe, wherein the CQI modulation symbols are mapped from the first resource unit of the second slot in a time-first mapping; and mapping the PUSCH modulation symbols onto resource units of both the first and second slot of the allocated subframe, wherein the PUSCH modulation symbols are mapped from the first resource unit of the first slot in a time-first mapping.

## Claims

### Claim 1

A method for modulation symbol mapping, the method comprising:
mapping a channel quality information, CQI, modulation symbols onto resource units of the second slot of an allocated subframe, wherein the CQI modulation symbols are mapped from the first resource unit of the second slot in a time-first mapping; and
mapping a Physical Uplink Shared Channel, PUSCH, modulation symbols onto resource units of both the first and second slot of the allocated subframe, wherein the PUSCH modulation symbols are mapped from the first resource unit of the first slot in a time-first mapping.

### Claim 2 (depends on 1)

The method of claim 1, wherein the PUSCH modulation symbols are mapped from a first resource unit of the first slot in a time-first mapping while skipping the resource units used for the CQI mapping.

### Claim 3 (depends on 1)

The method of claim 1, wherein the CQI modulation symbols are mapped in a time-first mapping which first follows a time direction of the second slot and then follows a frequency direction of allocated frequency resource of the allocated subframe.

### Claim 4 (depends on 1)

The method of claim 1, wherein the PUSCH modulation symbols are mapped in a time-first mapping which first follows a time direction of both the first and second slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
calculating an amount of resource units for the CQI modulation symbols.

### Claim 6 (depends on 5)

The method of claim 5, wherein the CQI modulation symbols are mapped onto the resource units of the second slot of the allocated subframe with an amount of mapped resource units equals to the amount of the calculated resource units.

### Claim 7 (depends on 1)

The method of claim 1, wherein the PUSCH modulation symbols formed by concatenation of the modulation symbols of one or more code blocks, CBs, of one transport block, TB.

### Claim 8

A method for modulation symbol mapping, the method comprising:
mapping a channel quality information, CQI, modulation symbols onto resource units of the second slot of an allocated subframe, wherein the CQI modulation symbols are mapped from a first resource unit of the second slot in a time-first mapping; and
mapping a Physical Uplink Shared Channel, PUSCH, modulation symbols onto resource units of both the first and second slot of the allocated subframe, wherein the PUSCH modulation symbols formed by modulation symbols of one or more CBs of one TB, and an amount of the resource units for mapping the modulation symbols of each CB of the PUSCH are the same or almost the same; and/or, an amount of resource units on the first slot and that on the second slot for mapping the modulation symbols of each CB of the PUSCH are the same or almost the same.

### Claim 9 (depends on 8)

The method of claim 8, wherein for the modulation symbols of one or more CBs of the PUSCH,
the modulation symbols of each CB are mapped in a time-first mapping which first follows a time direction of the second slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe;
and then the remaining modulation symbols of each CB are mapped in a time-first mapping which first follows a time direction of the first slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe.

### Claim 10 (depends on 8)

The method of claim 8, further comprising:
performing listen before talk, LBT, in respect of a frequency channel prior to a first candidate starting point for transmission;
transmitting said allocated subframe from the first candidate starting point, in a case where it is determined that the channel is available; and
in a case where it is determined that the channel is unavailable, performing listen before talk, LBT, in respect of the frequency channel prior to a second candidate starting point for transmission and, in a case where it is determined that the channel is available, transmitting said allocated subframe from the second candidate starting point.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first candidate starting point for transmission is located at a boundary of the first slot in the time domain and the second candidate starting point for transmission is located at a boundary of the second slot in the time domain.

### Claim 12 (depends on 10)

The method of claim 10, wherein the first candidate starting point for transmission is not located at a boundary of the first slot in the time domain and the second candidate starting point for transmission is not located at a boundary of the second slot in the time domain.

### Claim 13

A user equipment, UE, for modulation symbol mapping, the user equipment comprising:
a memory; and
a processor,
wherein the memory stores one or more computer programs that, when executed by the processor, cause the processor to:
map a channel quality information, CQI, modulation symbols onto resource units of the second slot of an allocated subframe, wherein the CQI modulation symbols are mapped from the first resource unit of the second slot in a time-first mapping; and map a Physical Uplink Shared Channel, PUSCH, modulation symbols onto the resource units of both the first and second slot of the allocated subframe, wherein the PUSCH modulation symbols are mapped from the first resource unit of the first slot in a time-first mapping.

### Claim 14 (depends on 13)

The UE of claim 13, wherein the processor is configured to perform the mapping of the PUSCH modulation symbols from a first resource unit of the first slot in a time-first mapping while skipping the resource units used for the CQI mapping.

### Claim 15 (depends on 13)

The UE of claim 13, wherein the processor is configured to perform the mapping of the CQI modulation symbols in a time-first mapping which first follows a time direction of the second slot and then follows a frequency direction of allocated frequency resource of the allocated subframe.

### Claim 16 (depends on 13)

The UE of claim 13, wherein the processor is configured to perform the mapping of the PUSCH modulation symbols in a time-first mapping which first follows a time direction of both the first and second slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe.

### Claim 17 (depends on 13)

The UE of claim 13, wherein the processor is configured to calculate an amount of resource units for the CQI modulation symbols.

### Claim 18 (depends on 13)

The UE of claim 13, wherein the processor is configured to map the CQI modulation symbols onto the resource units of the second slot of the allocated subframe with an amount of mapped resource units equals to the amount of the calculated resource units.

### Claim 19 (depends on 13)

The UE of claim 13, wherein the PUSCH modulation symbols formed by concatenation of the modulation symbols of one or more code blocks, CBs, of one transport block, TB.

### Claim 20

A user equipment, UE, for modulation symbol mapping, the user equipment comprising:
a memory; and
a processor,
wherein the memory stores one or more computer programs that, when executed by the processor, cause the processor to:
map a channel quality information, CQI, modulation symbols onto resource units of the second slot of an allocated subframe, wherein the CQI modulation symbols are mapped from a first resource unit of the second slot in a time-first mapping; and map a Physical Uplink Shared Channel, PUSCH, modulation symbols onto resource units of both the first and second slot of the allocated subframe, wherein the PUSCH modulation symbols formed by modulation symbols of one or more CBs of one TB, and an amount of the resource units for mapping the modulation symbols of each CB of the PUSCH are the same or almost the same; and/or, an amount of resource units on the first slot and that on the second slot for mapping the modulation symbols of each CB of the PUSCH are the same or almost the same.

### Claim 21 (depends on 20)

The UE of claim 20, wherein the processor is configured to, for the modulation symbols of one or more CBs of the PUSCH:
map the modulation symbols of each CB in a time-first mapping which first follows a time direction of the second slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe; and
then map the remaining modulation symbols of each CB in a time-first mapping which first follows a time direction of the first slot and then follows a frequency direction of the allocated frequency resource of the allocated subframe.

### Claim 22 (depends on 20)

The UE of claim 20, wherein:
the processor is further configured to perform listen before talk, LBT, in respect of a frequency channel prior to a first candidate starting point for transmission;
transmit, via a transceiver, said allocated subframe from the first candidate starting point, in a case where the processor determines that the channel is available; and
in a case where the processor determines that the channel is unavailable, the processor is further configured to perform listen before talk, LBT, in respect of the frequency channel prior to a second candidate starting point for transmission and, in a case where the processor determines that the channel is available, the processor is further configured to transmit, via the transceiver, said allocated subframe from the second candidate starting point.

### Claim 23 (depends on 22)

The UE of claim 22, wherein the first candidate starting point for transmission is located at a boundary of the first slot in the time domain and the second candidate starting point for transmission is located at a boundary of the second slot in the time domain.

### Claim 24 (depends on 22)

The UE of claim 22, wherein the first candidate starting point for transmission is not located at a boundary of the first slot in the time domain and the second candidate starting point for transmission is not located at a boundary of the second slot in the time domain.
