# US 2020/0287385 A1 · Method for controlling ess output

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0287385 A1
- Document ID: US20200287385A1
- Status: Published application
- Kind: A1
- Application number: 16/646,306
- Filed: 2018-05-25
- Published: 2020-09-10
- Earliest claimed: 2017-09-25
- Assignees: Hyosung Heavy Industries Corporation
- Applicants: Hyosung Heavy Industries Corporation
- Inventors: Dae Geun JIN; Bo Gun JIN
- Web page: https://patentgrep.com/patent/US20200287385A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 3/48: Controlling the sharing of active power
- H02P 9/14: by variation of field (H02P9/08, H02P9/10 take precedence)
- Y02P 80/14: District level solutions, i.e. local energy networks
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method of controlling output of an ESS depending on droop control according to frequency variation range of a power grid in the present invention may comprise steps of: monitoring the frequency variation range of the power grid; predicting frequency correction range resulting from regulation of an engine generator during a predetermined unit regulation time if the frequency variation range is determined to exceed a first reference value; controlling the output of the ESS with an output value determined by a frequency of the power grid according to a droop control algorithm set as a default if the predicted frequency correction range does not exceed a second reference value; and fixing the output of the ESS during the unit regulation time if the predicted frequency correction range exceeds the second reference value.

## Claims

### Claim 1

A method of controlling output of an ESS depending on droop control according to frequency variation range of a power grid in the present invention, comprising steps of:
monitoring the frequency variation range of the power grid;
predicting frequency correction range resulting from regulation of an engine generator during a predetermined unit regulation time if the frequency variation range is determined to exceed a first reference value;
controlling the output of the ESS with an output value determined by a frequency of the power grid according to a droop control algorithm set as a default if the predicted frequency correction range does not exceed a second reference value; and
fixing the output of the ESS during the unit regulation time if the predicted frequency correction range exceeds the second reference value.

### Claim 2 (depends on 1)

The method of claim 1, after the step of controlling the output of the ESS according to the default droop control algorithm, further comprising steps of:
monitoring frequency variation range of the power grid;
calculating frequency correction range resulting from regulation of an engine generator during the predetermined unit regulation time if the frequency variation range is determined to exceed the first reference value;
controlling the output of the ESS as an output value determined by a frequency of the power grid according to a droop control algorithm set as a default if the calculated frequency correction range does not exceed a third reference value; and
fixing the output of the ESS during next unit regulation time if the calculated frequency correction range exceeds the third reference value.

### Claim 3 (depends on 1)

The method of claim 1, after the step of fixing the output of the ESS, further comprising steps of:
monitoring the frequency variation range of the power grid;
calculating frequency variation range resulting from regulation of the engine generator during the predetermined unit regulation time if the frequency variation range is determined to exceed the first reference value;
controlling the output of the ESS with an output value determined by frequency of the power grid according to a droop control algorithm set as a default if the calculated frequency variation range does not exceed a third reference value; and
fixing the output of the ESS during next unit regulation time if the calculated frequency variation range does not exceed the third reference value.

### Claim 4 (depends on 2)

The method of claim 2, further including a step of storing the calculated frequency variation range resulting from the regulation of the engine generator, wherein, at the step of predicting frequency correction range resulting from regulation of the engine generator, the frequency variation range is predicted according to the frequency variation range stored at the previous step of storing the frequency variation range under the performance of droop control.

### Claim 5 (depends on 1)

The method of claim 1, wherein, depending on the frequency variation range of the power grid at a point of time when the frequency variation range thereof is monitored to exceed the first reference value and power of the power grid at the point of time, the second reference value is determined.

### Claim 6 (depends on 1)

The method of claim 1, wherein, at the step of monitoring the frequency variation range of the power grid, the frequency variation range after a certain time is determined in advance based on frequency change gradient of the power grid.

### Claim 7 (depends on 1)

The method of claim 1, wherein a cycle time of performing the step of monitoring the frequency variation range of the power grid is equal to the unit regulation time.

### Claim 8 (depends on 1)

The method of claim 1, wherein a cycle time of performing the step of monitoring the frequency variation range of the power grid is an integer multiple of the unit regulation time.

### Claim 9 (depends on 1)

The method of claim 1, wherein the step of monitoring the frequency variation range of the power grid includes steps of:
checking a gradient of a frequency value of the power grid during a gradient-measuring time at an early stage of monitoring;
calculating the frequency of the power grid at an endpoint of the monitoring cycle and predicting the frequency variation range thereto; and
waiting, if the predicted frequency variation range is smaller than the first reference value, until next monitoring time depending on the monitoring cycle.

### Claim 10 (depends on 3)

The method of claim 3, further including a step of storing the calculated frequency variation range resulting from the regulation of the engine generator,
wherein, at the step of predicting frequency correction range resulting from regulation of the engine generator, the frequency variation range is predicted according to the frequency variation range stored at the previous step of storing the frequency variation range under the performance of droop control.
