# US 2020/0277747 A1 · Express flood mitigation works using elevated and or at ground level with tunnel integrated large scale aqueduct with numerous functions, with main function to divert flood water or river water away from cities in order to fight or mitigate flood events and effect of global warming, with discharge invert levels to the sea higher than high tide levels

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0277747 A1
- Document ID: US20200277747A1
- Status: Published application
- Kind: A1
- Application number: 16/649,931
- Filed: 2018-11-27
- Published: 2020-09-03
- Earliest claimed: 2017-11-28
- Inventors: IR. DR. SARAVANAN MARIAPPAN
- Web page: https://patentgrep.com/patent/US20200277747A1

## CPC

- E02B 3/02: Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow ({harvesting water plants A01D44/00; underwater loosening of soil or rocks for foundation construction E02D17/16}; dredging or scraping devices E02F5/28)
- E01D 18/00: Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
- E02B 3/10: Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like (making embankments or dams in general E02D17/18)
- E02B 5/005: {Canals entirely situated above ground level, e.g. on piers (canal bridges E01D18/00)}
- E02B 5/04: Navigable canals
- E02B 13/00: Irrigation ditches, i.e. gravity flow, open channel water distribution systems ({retaining waterborne material in irrigation canals E02B5/085}; other distribution systems for watering or spraying gardens, fields, sports grounds, or the like, A01G25/00; {built-in irrigation means for sports grounds E01C13/083})
- E03F 1/001: {into a body of water}
- Y02A 10/11: Hard structures, e.g. dams, dykes or breakwaters
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- E03F: SEWERS; CESSPOOLS
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A system for flood water or water flow mitigation includes at least one aqueduct or drain having a first section linking a river, lake, reservoir, water retention pond or dam to another section linked to another lake, reservoir, storage tank or sea, characterized in that the first section are positioned at higher than the other section, and the aqueducts or drains are configured to be placed above ground level or extend upward from sides of river or existing drain, such that invert levels of the aqueducts or drains are higher than sea levels during high tide flooding or sea level increases.

## Claims

### Claim 1

A system for flood water or water flow mitigation, comprising:
at least one aqueduct or drain supported by at least one pillar and pier, wherein the aqueduct having a first section that is linked to a river, lake, reservoir, water retention pond or dam to and another section that is linked to a storage tank or sea, in which the aqueducts or drains are elevated above ground level using bridge-like structures,
wherein the first section is positioned at higher elevation than the other section, and the other section is elevated higher than sea levels during high tide or flooding, such that the aqueduct is extended along a path of an existing river or channel at an elevated level above-ground of the aqueduct holds the water to a certain flow and depth for use of water-based recreational activity, and transportation within the aqueduct.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the water flow and depth of the aqueduct are such that at least one vessels or boats navigable for boating transport and recreational activity.

### Claim 3

(canceled)

### Claim 4 (depends on 1)

The system according to claim 1, wherein the aqueducts or drains are constructed along or across a river, lake, reservoir, or water retention pound, or existing drain.

### Claim 5 (depends on 1)

The system according to claim 1, further comprising additional aqueducts or drains extend from sides of the river, lake, reservoir, or water retention pond, or existing drain as a free-standing wall, dyke or bund for increasing the water-holding capacity of the river, lake, reservoir, or water retention pond, or existing drain.

### Claim 6 (depends on 5)

The system according to claim 5, wherein said aqueduct linked to at least one upward extension having additional channel to divert away overflowing water or storing the water, where the water is used for irrigation, ground-water recharging, or as water supply.

### Claim 7 (depends on 1)

The system according to claim 1, wherein water is pumped from the river, lake, reservoir, or water retention pond, or existing drain via diversion culverts into the aqueducts or drains using a plurality of pumps.

### Claim 8 (depends on 1)

The system according to claim 1, wherein the aqueducts or drains are made of multiple decks or platform to accommodate water flow, and as a motorway independently.

### Claim 9

(canceled)

### Claim 10 (depends on 1)

The system according to claim 1, further comprising a floodgate, dam or weir that is constructed at the month of the river to channel the water into the aqueducts or drains, and discharge water flow directly into the sea or storage tank above the sea level.

### Claim 11

A method for mitigating flood or water flow, comprising steps of:
assembling at least one aqueduct or drain supported by at least one pillar and pier,
linking a first section of said aqueduct to a river, lake, reservoir, water retention pond or dam; and
linking another section to a storage tank or sea,
wherein, the positioning of the first section is higher than the other section, and placement of the aqueducts or drains is to be above-ground level or extend upward from sides of river or existing drain, such that invert levels of the aqueducts or drains are higher than sea levels during high tide-flooding or increased sea levels;
wherein the positioning of the first section at higher elevation than the other section;
wherein the other section positioned higher elevation than sea levels during high tide or flooding, such that the water is held to a certain flow and depth using the aqueduct that is extended along a path of an existing river or channel at elevated level above-ground of the aqueduct, for use of water-based recreational activity and transportation within the aqueduct.

### Claim 12

(canceled)

### Claim 13

(canceled)

### Claim 14 (depends on 11)

The method according to claim 11, further comprising steps of elevating the aqueducts or drains above ground level using bridge-like structures.

### Claim 15 (depends on 11)

The method according to claim 11, further comprising steps of assembling additional aqueducts or drains to extend sides of the river, lake, reservoir, or water retention pond, or existing drain as a free-standing wall, dyke, or bund for increasing the water-holding capacity of the river, lake, reservoir, or water retention pond, or existing drain.

### Claim 16 (depends on 11)

The method according to claim 11, further comprising steps of using the aqueducts or drains as an aqua-railway for alternative transportation and recreational purposes.

### Claim 17 (depends on 11)

The method according to claim 11, further comprising steps of forming multiple decks or platform of the aqueducts or drains to accommodate water flow, and as a motorway independently.

### Claim 18 (depends on 1)

The system according to claim 1, wherein the aqueducts or drains are used as an aqua-railway for alternative transportation and recreational purposes.