Production schedule change system, production schedule change method, and production schedule change program
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsTakumi FUJITA, Shoichi AOKI, Hideaki NAGAI
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsTakumi FUJITA, Shoichi AOKI, Hideaki NAGAI
Estimating the term…
A production schedule change system includes: a production schedule acquisition part configured to acquire a production schedule of a product in a case where the product is produced at an initial condition of production speed; a time information acquisition part configured to acquire time information indicating a scheduled collection time; and a schedule candidate calculation part configured to: change the production speed from the initial condition within a range defined by a quality standard of the product, based on the time information; and calculates at least one production schedule candidate satisfying a first condition that a time difference between a deliverable time of the product and the scheduled collection time is in an acceptable range and at least one of a second condition that the deliverable time is earlier than the scheduled collection time or a third condition that the scheduled collection time is earlier than the deliverable time.
A production schedule change system comprising:
A production schedule change method comprising:
A production schedule change program configured to cause a computer to function as:
Dependencies are inferred from the claim text.