# US 2020/0270859 A1 · Vapor mitigation appratus and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0270859 A1
- Document ID: US20200270859A1
- Status: Published application
- Kind: A1
- Application number: 16/288,034
- Filed: 2019-02-27
- Published: 2020-08-27
- Earliest claimed: 2019-02-27
- Inventors: Dave Nowak
- Web page: https://patentgrep.com/patent/US20200270859A1

## CPC

- E02D 27/01: Flat foundations
- E04B 1/7069: {by ventilating (means for ventilating in floors E04B5/48, in ceilings E04B9/02, in building blocks E04C1/392, in building panels E04C2/521, in roofs E04D13/16; ventilating wall coverings E04F13/007)}
- E02D 31/008: {against entry of noxious gases, e.g. Radon}
- F24F 2110/66: Volatile organic compounds [VOC]
- F24F 2110/68: Radon
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)

## Abstract

A vapor mitigation apparatus and method for use with the construction of a building. The apparatus includes a vertical securing piece configured to be affixed to a foundation wall proximate a footing that is supporting the foundation wall. The vertical securing piece has a first end located proximate to a footing and a second end. A horizontal foot is located at the first end of the securing piece and extends away from the securing piece. The horizontal foot is configured to rest against the footing. The apparatus also includes a mechanical clip located at the second end of the vertical securing piece and is configured to secure a piece of plastic sheeting. The method includes securing the apparatus to the foundation wall, securing a plastic sheeting to the mechanical clip and then creating a concrete slab by pouring concrete over the apparatus.

## Claims

### Claim 1

A vapor mitigation apparatus for use with the construction of a building, the building having a foundation wall, a footing and a slab, the apparatus comprising:
a vertical securing piece configured to be affixed to the foundation wall, the vertical securing piece having a first end located proximate to the footing and a second end;
a horizontal foot located at the first end of the securing piece and extending away from the securing piece, wherein the horizontal foot is configured to rest upon the footing.; and
a mechanical clip located at the second end and extending away from the securing piece, the mechanical clip being configured to secure a piece of plastic sheeting.

### Claim 2 (depends on 1)

The vapor mitigation apparatus of claim 1, further comprising:
an adhesion strip affixed to the vertical securing piece and configured to be affixed to the foundation wall.

### Claim 3

(canceled)

### Claim 4 (depends on 1)

The vapor mitigation apparatus of claim 1, wherein the mechanical clip comprises:
a first jaw member; and
a second jaw member hinged to the first jaw member, the first jaw member and second jaw member configured to secure the piece of plastic sheeting therebetween.

### Claim 5 (depends on 1)

The vapor mitigation apparatus of claim 1, wherein the mechanical clip comprises:
a base member extending substantially horizontally away from the securing piece, the base member having a distal end, the base member having a locking portion at the distal end; and
a retention member extending away from the securing piece and configured to be depressed against the locking portion, the retention member and locking portion configured to secure the piece of plastic sheeting therebetween.

### Claim 6 (depends on 1)

The vapor mitigation apparatus of claim 1, further comprising a gasket affixed to the vertical securing piece and configured to be affixed to the foundation wall.

### Claim 7

A vapor mitigation apparatus for use with the construction of a building, the building having a foundation wall and a footing, the apparatus comprising:
a vertical securing piece configured to be affixed to the foundation wall, the vertical securing piece having a first end located proximate to the footing and a second end;
a horizontal foot located at the first end of the securing piece and extending away from the securing piece, the horizontal foot is configured to rest upon the footing;
an adhesion strip affixed to the vertical securing piece and configured to be affixed to a foundation wall;
a gasket affixed to the vertical securing piece and configured to be affixed to the foundation wall; and
a mechanical clip located at the second end and configured to secure a piece of plastic sheeting.

### Claim 8 (depends on 7)

The vapor mitigation apparatus of claim 7, wherein the mechanical clip comprises:
a first jaw member; and
a second jaw member hinged to the first jaw member, the first jaw member and second jaw member configured to secure the piece of plastic sheeting therebetween.

### Claim 9 (depends on 7)

The vapor mitigation apparatus of claim 7, wherein the mechanical clip comprises:
a base member extending substantially horizontally away from securing piece, base member having a distal end, the base member having a locking portion at the distal end; and
a retention member configured to be depressed against the locking portion, the retention member and locking portion configured to secure the piece of plastic sheeting therebetween.

### Claim 10

A method for vapor mitigation in the construction of a building, the building having a foundation wall and footing, the foundation wall and footing having a circumference that surrounds a gas permeable layer, and utilizing a vapor mitigation apparatus having a vertical securing piece having a first end located and a second end, a horizontal foot located at the first end of the securing piece and extending away from the securing piece, and a mechanical clip located at the second end and configured to secure a piece of plastic sheeting, the method comprising:
affixing the vertical securing piece to the circumference of the foundation wall such that the horizontal foot rest on the footing;
placing a piece of plastic sheeting over the gas permeable layer;
securing the ends of piece of plastic sheeting to mechanical clip thereby creating a vapor barrier over the gas permeable layer; and
creating a slab of concrete by pouring a sufficient amount of concrete over the vapor mitigation apparatus and plastic sheeting to encase the vapor mitigation apparatus and cover the plastic sheeting.
