# US 2020/0269979 A1 · Replenishment planning device and replenishment planning method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0269979 A1
- Document ID: US20200269979A1
- Status: Published application
- Kind: A1
- Application number: 16/648,721
- Filed: 2018-04-27
- Published: 2020-08-27
- Earliest claimed: 2017-09-20
- Assignees: Yamaha Hatsudoki Kabushiki Kaisha
- Applicants: Yamaha Hatsudoki Kabushiki Kaisha
- Inventors: Hajime ADACHI
- Web page: https://patentgrep.com/patent/US20200269979A1

## CPC

- B64C 27/04: Helicopters
- G01C 21/26: specially adapted for navigation in a road network
- G08G 5/00: Traffic control systems for aircraft
- G08G 5/53: for cruising
- G08G 5/55: for a single aircraft
- G08G 5/57: for unmanned aircraft
- B64U 10/16: with five or more distinct rotor axes, e.g. octocopters
- B64U 10/17: Helicopters (flying platforms B64U10/13)
- B64U 50/19: using electrically powered motors
- B64U 2101/30: for imaging, photography or videography
- B64U 2101/45: for releasing liquids or powders in-flight, e.g. crop-dusting
- B64U 2201/10: autonomous, i.e. by navigating independently from ground or air stations, e.g. by using inertial navigation systems [INS]
- B64U 2201/20: Remote controls
- B64C: AEROPLANES; HELICOPTERS
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})
- B64U: UNMANNED AERIAL VEHICLES [UAV]; EQUIPMENT THEREFOR

## Abstract

A replenishment planning device calculates a first route replenishment point on a travel route at which replenishment of a chemical becomes necessary, a second route replenishment point on the travel route which is closer to a replenishment area than the first route replenishment point is, and first and second times necessary for an unmanned helicopter to travel from a travel start point, via the first and the second route replenishment points, to a replenishment area to have the chemical replenished, and to move back to the travel route. Thereafter, a process takes the first and the second route replenishment points as next travel start points, and calculates, for each, next first and second route replenishment points, and first and second times, and is repeated for each replenishment plan pattern until the first route replenishment point reaches a travel end point, such that position information and time information for each replenishment plan pattern are generated.

## Claims

### Claim at position 1

1-13. (canceled)

### Claim 14

A replenishment planning device for planning replenishment of a consumable material loaded in and consumed by a moving body as the moving body travels, the replenishment planning device comprising:
a storage to store a travel route of the moving body including a travel start point and a travel end point, a travel speed at which the moving body travels along the travel route, a load amount of the consumable material, a consumption rate indicating an amount of consumption of the consumable material per unit time, a replenishment area to replenish the consumable material, a replenishment travel speed at which the moving body moves between the travel route and the replenishment area, and a replenishment time necessary to replenish the consumable material at the replenishment area;
a first calculator to calculate, based on the travel speed, the load amount and the consumption rate, a first route replenishment point on the travel route at which replenishment of the consumable material becomes necessary when the moving body travels from the travel start point along the travel route;
a second calculator to calculate a second route replenishment point on the travel route obtained by tracking back from the first route replenishment point along the travel route to a location that is closer to the replenishment area than the first route replenishment point;
a third calculator to calculate, based on the travel speed, the replenishment travel speed and the replenishment time, a first time necessary for the moving body to move from the travel start point to the first route replenishment point, move from the first route replenishment point to the replenishment area, have the consumable material replenished at the replenishment area, and move from the replenishment area to the travel route;
a fourth calculator to calculate, based on the travel speed, the replenishment travel speed, and the replenishment time, a second time necessary for the moving body to move from the travel start point to the second route replenishment point, move from the second route replenishment point to the replenishment area, have the consumable material replenished at the replenishment area, and move from the replenishment area to the travel route; and
a notifier to notify at least one replenishment plan pattern which includes position information based on the first route replenishment point and the second route replenishment point, and time information based on the first time and the second time; wherein
the replenishment planning device generates the position information and the time information for each of the at least one replenishment plan pattern by having the first calculator through the fourth calculator calculate the first route replenishment point, the second route replenishment point, the first time and the second time; and
thereafter repeating the process of taking the first route replenishment point and the second route replenishment point as next travel start points; and for each of which having the first calculator through the fourth calculator calculate a next first route replenishment point, a next second route replenishment point, a next first time, and a next second time until the first route replenishment point reaches the travel end point in each of the at least one replenishment plan pattern.

### Claim 15 (depends on 14)

The replenishment planning device according to claim 14, further comprising a selector to select the replenishment plan pattern to be notified based on the time information.

### Claim 16 (depends on 15)

The replenishment planning device according to claim 15, further comprising:
a fifth calculator to calculate, for each of the at least one replenishment plan pattern when the first route replenishment point reaches the travel end point, a total time of final travel time from an immediately previous first route replenishment point or an immediately previous second route replenishment point through the travel end point, all the first times and all the second times; wherein
the selector selects the replenishment plan pattern which has a shortest total time in the time information.

### Claim 17 (depends on 14)

The replenishment planning device according to claim 14, further comprising:
a sixth calculator to calculate a position in the replenishment area which is closest from the first route replenishment point as a first replenishment point; and
a seventh calculator to calculate a position in the replenishment area which is closest from the second route replenishment point as a second replenishment point.

### Claim 18 (depends on 17)

The replenishment planning device according to claim 17, wherein
the first time calculated by the third calculator is an amount of time necessary for the moving body to move from the travel start point to the first route replenishment point, make a round trip between the first route replenishment point and the first replenishment point, and obtain the consumable material replenished at the first replenishment point; and
the second time calculated by the fourth calculator is an amount of time necessary for the moving body to move from the travel start point to the second route replenishment point, make a round trip between the second route replenishment point and the second replenishment point, and obtain the consumable material replenished at the second replenishment point.

### Claim 19 (depends on 14)

The replenishment planning device according to claim 14, wherein the second route replenishment point is also a first position on the travel route at which a ratio of a distance to the replenishment area to a travel distance from the travel start point is smallest, or is a second position on the travel route from which a distance to the replenishment area is equal to a distance from the first position to the replenishment area.

### Claim 20 (depends on 19)

The replenishment planning device according to claim 19, wherein the second route replenishment point is a position on the travel route at which a ratio of a distance to the replenishment area to a travel distance from the travel start point is smallest.

### Claim 21 (depends on 14)

The replenishment planning device according to claim 14, wherein
the travel route includes a route made of reciprocating traveling in a first direction and traveling in a second direction perpendicular or substantially perpendicular to the first direction; and
the replenishment area includes a replenishment line extending parallel or substantially parallel to the second direction.

### Claim 22 (depends on 14)

The replenishment planning device according to claim 14, wherein the moving body travels automatically along the travel route.

### Claim 23 (depends on 14)

The replenishment planning device according to claim 14, wherein the consumable material is an application material.

### Claim 24 (depends on 23)

The replenishment planning device according to claim 23, wherein
the storage further stores a consumption route in the travel route along which the application material is consumed; and
the first calculator calculates the first route replenishment point based on the travel speed, the consumption route, the load amount, and the consumption rate.

### Claim 25 (depends on 14)

The replenishment planning device according to claim 14, wherein the moving body is an unmanned aircraft.

### Claim 26

A replenishment planning method for planning replenishment of a consumable material loaded in and consumed by a moving body as the moving body travels, the replenishment planning method being based on a travel route of the moving body including a travel start point and a travel end point, a travel speed at which the moving body travels along the travel route, a load amount of the consumable material, a consumption rate indicating an amount of consumption of the consumable material per unit time, a replenishment area to replenish the consumable material, a replenishment travel speed at which the moving body moves between the travel route and the replenishment area, and a replenishment time necessary to replenish the consumable material at the replenishment area, the method comprising:
calculating, based on the travel speed, the load amount, and the consumption rate, a first route replenishment point on the travel route at which replenishment of the consumable material becomes necessary when the moving body travels from the travel start point along the travel route;
calculating a second route replenishment point on the travel route obtained by tracking back from the first route replenishment point along the travel route to a location that is closer to the replenishment area than the first route replenishment point;
calculating, based on the travel speed, the replenishment travel speed, and the replenishment time, a first time necessary for the moving body to move from the travel start point to the first route replenishment point, move from the first route replenishment point to the replenishment area, have the consumable material replenished at the replenishment area, and move from the replenishment area to the travel route;
calculating, based on the travel speed, the replenishment travel speed, and the replenishment time, a second time necessary for the moving body to move from the travel start point to the second route replenishment point, move from the second route replenishment point to the replenishment area, have the consumable material replenished at the replenishment area, and move from the replenishment area to the travel route;
taking the first route replenishment point and the second route replenishment point as next travel start points; and
notifying at least one replenishment plan pattern which includes position information based on the first route replenishment point and the second route replenishment point, and time information based on the first time and the second time; wherein
the method generates the position information and the time information for each at least one replenishment plan pattern by executing each of the calculating steps to calculate the first route replenishment point, the second route replenishment point, the first time, and the second time, and
thereafter repeating the process of executing the taking step to take the first route replenishment point and the second route replenishment point as next travel start points; and for each of which executing the calculating steps to calculate a next first route replenishment point, a next second route replenishment point, a next first time, and a next second time until the first route replenishment point reaches the travel end point in each replenishment plan pattern; and
then executes the notifying step to notify the at least one replenishment plan pattern.
