# US 2020/0269888 A1 · Loading turntable systems and methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0269888 A1
- Document ID: US20200269888A1
- Status: Published application
- Kind: A1
- Application number: 16/741,400
- Filed: 2020-01-13
- Published: 2020-08-27
- Earliest claimed: 2019-02-22
- Assignees: Universal City Studios LLC
- Applicants: Universal City Studios LLC
- Inventors: Luis Carlos Alarcon; Steven C. Blum; Michael David Russell, Jr.
- Web page: https://patentgrep.com/patent/US20200269888A1

## CPC

- B61K 1/00: Transferring passengers, articles, or freight to and from moving trains; Slipping or coupling vehicles from or to moving trains
- A63G 1/00: Roundabouts
- A63G 4/00: Accessories for roundabouts not restricted to one of groups A63G1/00 or A63G3/00
- A63G 7/00: Up-and-down hill tracks; Switchbacks
- A63G 21/06: with passing arrangements for cars
- A63G 25/00: Autocar-like self-drivers; Runways therefor
- A63G 31/00: Amusement arrangements
- A63G 31/16: creating illusions of travel
- B61B 13/00: Other railway systems
- B61K: AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- A63G: MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- B61B: RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR (lifts or hoists, elevators, escalators, moving walkways B66B)

## Abstract

An attraction loading system is provided that includes a turntable configured to rotate about a vertical axis. A ride vehicle is configured to travel along a loading path disposed about a perimeter of the turntable. A first track switch of the system is disposed along the loading path to direct the ride vehicle to a main portion of the loading path from an attraction path, or to direct the ride vehicle to the main portion of the loading path from a secondary portion of the loading path. A second track switch of the system is disposed along the loading path to direct the ride vehicle from the main portion of the loading path to the attraction path, or to direct the ride vehicle from the main portion of the loading path to the secondary portion of the loading path.

## Claims

### Claim 1

An attraction loading system, comprising:
a turntable configured to rotate about a vertical axis;
a ride vehicle configured to travel along a loading path disposed about a perimeter of the turntable;
a first track switch disposed along the loading path configured to be disposed in a first position to direct the ride vehicle to a main portion of the loading path from an attraction path, and configured to be disposed in a second position to direct the ride vehicle to the main portion of the loading path from a secondary portion of the loading path; and
a second track switch disposed along the loading path configured to be disposed in a third position to direct the ride vehicle from the main portion of the loading path to the attraction path, and configured to be disposed in a fourth position to direct the ride vehicle from the main portion of the loading path to the secondary portion of the loading path.

### Claim 2 (depends on 1)

The attraction loading system of claim 1, wherein the ride vehicle travels along the loading path at a speed aligned with a rotational speed of the turntable such that the ride vehicle maintains a fixed distance from a particular point on an edge of the turntable while traveling along the loading path.

### Claim 3 (depends on 1)

The attraction loading system of claim 1, comprising a fixed platform positioned coaxially within the turntable and that does not rotate with the turntable.

### Claim 4 (depends on 3)

The attraction loading system of claim 3, comprising a passenger entrance path that connects to the fixed platform.

### Claim 5 (depends on 1)

The attraction loading system of claim 1, comprising a ride controller configured to control a speed of the ride vehicle in the attraction path to adjust a spacing of the ride vehicle relative to another ride vehicle.

### Claim 6 (depends on 5)

The attraction loading system of claim 5, comprising a variable speed zone disposed at an end of the attraction path, wherein the ride vehicle is configured to move through variable speed zone, and wherein the first track switch is configured to be disposed in the first position to direct the ride vehicle from the variable speed zone to the main portion of the loading path.

### Claim 7 (depends on 6)

The attraction loading system of claim 6, wherein the ride controller is configured to control the speed of the ride vehicle while the ride vehicle is in the variable speed zone to adjust the spacing of the ride vehicle relative to a second ride vehicle within the variable speed zone.

### Claim 8 (depends on 7)

The attraction loading system of claim 7, wherein the ride controller is configured to control the speed of the ride vehicle, control a second speed of the second ride vehicle, or both, within the variable speed zone to increase a distance between the ride vehicle and the second ride vehicle within the variable speed zone.

### Claim 9 (depends on 7)

The attraction loading system of claim 7, wherein the ride controller is configured to control the speed of the ride vehicle, control a second speed of the second ride vehicle, or both, within the variable speed zone to decrease a distance between the ride vehicle and the second ride vehicle within the variable speed zone.

### Claim 10 (depends on 1)

The attraction loading system of claim 1, comprising a ride controller, wherein the ride controller is configured to receive a load confirmation signal associated with the ride vehicle while the ride vehicle travels along the main portion of the loading path, and wherein the ride controller is configured to adjust the position of the second track switch based on whether the ride controller receives the loading confirmation signal.

### Claim 11 (depends on 10)

The attraction loading system of claim 10, wherein, upon receipt of the confirmation signal, the ride controller is configured to position the second track switch in the third position to direct the ride vehicle from the main portion of the loading path to the attraction path.

### Claim 12 (depends on 10)

The attraction loading system of claim 10, wherein, absent of receipt of the confirmation signal, the ride controller is configured to position the second track switch in the fourth position to direct the ride vehicle from the main portion of the loading path to the secondary portion of the loading path.

### Claim 13

A method to load passengers into ride vehicles, comprising:
directing a ride vehicle along a loading path at a first location of the loading path toward a second location of the loading path;
determining an occupancy status of the ride vehicle; and
based on the occupancy status of the ride vehicle, controlling a track switch to direct the vehicle along either the loading path or along an attraction path at the second location along the loading path.

### Claim 14 (depends on 13)

The method of claim 13, wherein determining the occupancy status comprises determining whether the passengers are loading into the ride vehicle or have loaded into the ride vehicle.

### Claim 15 (depends on 14)

The method of claim 14, wherein controlling the track switch comprises controlling the track switch to direct the ride vehicle along the loading path at the second location based on determining that the passengers are loading into the ride vehicle.

### Claim 16 (depends on 15)

The method of claim 15, wherein controlling the track switch comprises controlling the track switch to direct the ride vehicle along the attraction path at the second location based on determining that the passengers have loaded into the ride vehicle.

### Claim 17 (depends on 13)

The method of claim 13, wherein directing the ride vehicle along the loading path at the first location comprises controlling a second track switch to direct the ride vehicle along a main portion of the loading path from a secondary portion of the loading path or along the main portion of the loading path from a variable speed zone of the attraction path.

### Claim 18

An attraction loading system, comprising:
a turntable configured to rotate about a vertical axis;
a loading path disposed about a perimeter of the turntable, wherein a ride vehicle is configured to move along the loading path;
a first track switch disposed along the loading path, wherein the first track switch is configured to direct the ride vehicle to a main portion of the loading path from either a secondary portion of the loading path or an attraction path; and
a second track switch disposed along the loading path, wherein the second track switch is configured to direct the ride vehicle from the main portion of the loading path to either the secondary portion of the loading path or the attraction path.

### Claim 19 (depends on 18)

The attraction loading system of claim 18, comprising a ride controller, wherein the ride controller is configured to control a speed of the ride vehicle along the loading path such that a speed of the ride vehicle along the loading path substantially matches a rotational speed of the turntable.

### Claim 20 (depends on 18)

The attraction loading system of claim 18, comprising:
a variable speed zone disposed at an end of the attraction path, wherein the first track switch is configured to direct the ride vehicle from to the main portion of the loading path from either the secondary portion of the loading path or the variable speed zone of the attraction path; and
a ride controller configured adjust a speed of the ride vehicle through the variable speed zone based on a presence of a second ride vehicle disposed along the secondary portion of the loading path.

### Claim 21

An attraction loading system, comprising:
a loading and/or unloading area comprising a conveyor;
a loading path disposed about a perimeter of the conveyor, wherein a ride vehicle is configured to move along the loading path;
an attraction path coupled to the loading path; and
a controller configured to direct the ride vehicle from the loading path onto the attraction path based on a first occupancy status of the vehicle or to direct the ride vehicle to re-loop the loading path based on a second occupancy status of the ride vehicle.
