# US 2020/0248551 A1 · Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0248551 A1
- Document ID: US20200248551A1
- Status: Published application
- Kind: A1
- Application number: 16/856,057
- Filed: 2020-04-23
- Published: 2020-08-06
- Earliest claimed: 2019-08-08
- Assignees: Infrastructure Renewal Institute of Southern China; WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
- Applicants: Infrastructure Renewal Institute of Southern China; WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
- Inventors: Fuming Wang; Hongyuan Fang; Yanhui Pan; Peng Zhao; Chengchao Guo
- Web page: https://patentgrep.com/patent/US20200248551A1

## CPC

- E21D 5/01: using prefabricated lining lowered into a hole filled with liquid or viscous mass
- E02D 23/08: Lowering or sinking caissons {(sinking mine shaft E21D1/00)}
- E21D 9/005: {by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit (driving shields E21D9/06)}
- F16L 55/165: a pipe {or flexible liner} being inserted in the damaged section
- F16L 55/18: Appliances for use in repairing pipes (F16L55/10 takes precedence)
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

A construction method of a rectangular working well includes steps of: (I) designing functional requirements for the rectangular working well; (II) constructing a caisson of an enclosing structure of the rectangular working well; (III) constructing an edge protector; (IV) excavating earthwork of the rectangular working well; (V) forming a back cover for the rectangular working well, and pre-embedding a sliding track, a pull ring and a back wall anchor; (VI) installing a ladder for entering the rectangular working well; (VII) preventing joint leakage; (VIII) installing a water-proof pressure plate at an entrance of the preset pipe jacking hole; (IX) constructing the sliding back wall; (X) lifting the sandwich concrete slab wall at a top of the preset pipe jacking hole; and (XI) performing pipe jacking. The structure system constructed by the present invention has many advantages such as clear function, safety, quickness, and flexible design.

## Claims

### Claim 1

A construction method of a rectangular working well with a preset pipe jacking hole and a sliding back wall in a water-rich stratum, comprising steps of:
(I) designing functional requirements for the rectangular working well, comprising steps of:
(1) collecting relevant data to determine a plane size, a depth, and a treatment method of a working well back cover, so as to satisfy well operation requirements;
(2) determining a height and a diameter of the preset pipe jacking hole according to a position, a diameter, a material and a connection method of a proposed pipeline, wherein a quantity of the preset pip jacking hole is at least one; and
(3) calculating and drawing a structure of the rectangular working well: using comparative calculation analysis of a rod system element method and numerical simulation to obtain an optimal supporting structure composition of the rectangular working well, and then drawing to complete functional requirement design for the rectangular working well;
(II) constructing a caisson of an enclosing structure of the rectangular working well, comprising steps of:
(1) preparing before construction of the caisson: comprising site leveling, laying out, excavating earth of a first layer, compacting a foundation, leveling and laying out, inspecting lines, laying a sand cushion, forming cutting edge formwork, binding steel bars, forming well body formwork, pouring concrete, curing, and demoulding;
(2) constructing the caisson by sections: comprising preparing, installing a vertical transportation machinery and drainage pumps, observing, correcting, sinking to a designed elevation by sections, and verifying the elevation;
(3) setting a thin-walled plain concrete cavity along a vertical axis where the preset pipe jacking hole is located during pouring the caisson by sections, and inserting a sandwich concrete slab wall into the thin-walled plain concrete cavity; and
(4) using reinforced concrete or steel members as a material of the enclosing structure of the rectangular working well, and performing anticorrosive measures;
(III) constructing an edge protector: setting embedded parts during construction the caisson of the enclosing structure of the rectangular working well, and connecting the edge protector and the embedded parts by bolts;
(IV) excavating earthwork of the rectangular working well: during construction of the caisson, directly excavating the earthwork above water, and excavating the earthwork below the water by high-pressure water gun loosening, hydraulic grabbing or reverse circulation pumping;
(V) forming a back cover for the rectangular working well, and pre-embedding a sliding track, a pull ring and a back wall anchor: in order to meet needs of subsequent construction, using concrete to treat the back cover of the rectangular working well; using plain concrete for anti-floating stability before connecting a caisson wall with reinforced concrete; simultaneously pre-embedding the sliding track, the pull ring and the back wall anchor during pouring the reinforced concrete back cover;
(VI) installing a ladder for entering the rectangular working well: according to needs of subsequent maintenance, designing the ladder which is installed on an internal wall of the rectangular working well by planting bars;
(VII) preventing joint leakage: using a polymer material for leakage control at joints of the rectangular working well and side walls of the caisson of the enclosing structure;
(VIII) installing a water-proof pressure plate at an entrance of the preset pipe jacking hole: fixing the water-proof pressure plate at the entrance through expansion bolts according to a position of the preset pipe jacking hole;
(IX) constructing the sliding back wall: according to a calculation result of a pipe jacking thrust, hoisting a prefabricated back wall, and fixing the back wall by the back wall anchor; installing a pull rod between the back wall anchor and the pull ring; for different pipe jacking positions, adjusting a position of the sliding back wall through the pull rod and starting pipe jacking again after fixing;
(X) lifting the sandwich concrete slab wall at a top of the preset pipe jacking hole: lifting the sandwich concrete slab wall to form the thin-walled plain concrete cavity at the preset pipe jacking hole, so as to reduce a resistance when a pipe jacking machinery passes through the preset pipe jacking hole; and
(XI) performing pipe jacking: after the pipe jacking machinery is installed in place, continuously passing through the thin-walled plain concrete cavity at the preset pipe jacking hole under a hydraulic jacking thrust for normal pipe jacking construction.

### Claim 2

A rectangular working well with a preset pipe jacking hole and a sliding back wall in a water-rich stratum, comprising: the rectangular working well (1), wherein an enclosing structure of the rectangular working well (1) is a caisson (4), a back cover (2) is provided at a bottom of the rectangular working well (1), and the preset jacking hole (3) is provided inside the rectangular working well (1) and near the bottom; the sliding back wall (14) is provided opposite to the preset jacking hole (3), a thin-walled plain concrete cavity (16) is provided in the caisson (4) along a vertical axis of the preset jacking hole (3), and a sandwich concrete panel wall (5) is inserted into the thin-walled plain concrete cavity (16).

### Claim 3 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a water-proof pressure plate (13) is fixed at an entrance of the preset pipe jacking hole (3) by expansion bolts.

### Claim 4 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a pipe jacking machinery (17) is provided in the rectangular working well (1); the pipe jacking machinery (17) is docked with a pipe jacking (18) in a thrust direction, and the pipe jacking machinery (17) pushes the pipe jacking (18) toward the preset pipe jacking hole (3).

### Claim 5 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a polymer material (12) is used for leakage control at joints between the back cover (2) and the caisson (4) as well as joints at side walls of the caisson (4).

### Claim 6 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a connector is pre-embedded on the caisson (4); an edge protector (6) is connected to a top end of the caisson (4), and the edge protector (6) is connected to the pre-embedded connector by bolts.

### Claim 7 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a ladder (11) is installed on an internal wall of the rectangular working well (1) through planting bars.

### Claim 8 (depends on 2)

The rectangular working well, as recited in claim 2, wherein a sliding track (8) and a pull ring (9) are pre-embedded on the back cover (2); the sliding back wall (14) cooperates with the sliding track (8); the sliding back wall (14) is connected to a pull rod (15) through an anchor (10), and an end portion of the pull rod (15) is connected to the pull ring (9).