# US 2020/0232323 A1 · Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0232323 A1
- Document ID: US20200232323A1
- Status: Published application
- Kind: A1
- Application number: 16/740,757
- Filed: 2020-01-13
- Published: 2020-07-23
- Earliest claimed: 2019-01-21
- Assignees: Xi'an University of Science and Technology
- Applicants: Xi'an University of Science and Technology
- Inventors: Panshi XIE; Yingyi ZHANG; Yanli ZHANG; Shuangqi TIAN; Jianjie DUAN
- Web page: https://patentgrep.com/patent/US20200232323A1

## CPC

- E21C 41/18: for brown or hard coal
- E21C 27/02: solely by slitting (rods, drums, for same E21C25/10; saws, discs, wheels E21C25/18; chains, chain guides, for same E21C25/28)
- E21D 23/0004: {along the working face}
- E21D 23/0082: {specially adapted for vertical or steep gradient seams}
- E21C: MINING OR QUARRYING
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)

## Abstract

Disclosed is a multi-section non-pillar staggered protected roadway for a deep inclined thick coal seam (DITCS) and a method for coal pillar filling between sections. The multi-section non-pillar staggered protected roadway includes a floor, a coal seam, an immediate roof, and a basic roof in a multi-section coal seam, where the floor is disposed below the coal seam, a hydraulic support is disposed in a section between the floor and the immediate roof; a return airway and a transportation roadway are respectively disposed on a left side and a right side of each section; the return airway and the transportation roadway in each section are communicated with each other through a working face; and non-pillar staggered layout is used for a return airway of a next section and a transportation roadway of a current section.

## Claims

### Claim 1

A multi-section non-pillar staggered protected roadway for a deep inclined thick coal seam (DITCS), comprising a floor, a coal seam, an immediate roof, and a basic roof in a multi-section coal seam, wherein the floor is disposed below the coal seam, a hydraulic support is disposed in a section between the floor and the immediate roof; a return airway and a transportation roadway are respectively disposed on a left side and a right side of each section; the return airway and the transportation roadway in each section are communicated with each other through a working face;
and non-pillar staggered layout is used for a return airway of a next section and a transportation roadway of a current section.

### Claim 2 (depends on 1)

The multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, wherein the non-pillar staggered layout should meet a requirement of a thickness of a coal seam between the return airway of the next section and the transportation roadway of the current section, that is, a vertical distance between the roadways is greater than 2 m.

### Claim 3 (depends on 1)

The multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, wherein when a thickness of a coal seam section is 3.5-4.0 m, lower staggered layout is used for the return airway of the next section and the transportation roadway of the current section, that is, the return airway of the next section is located on a lower right side of the transportation roadway of the current section.

### Claim 4 (depends on 1)

The multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, wherein when a thickness of a coal seam section is 4.0-5.5 m, superimposed layout is used for the return airway of the next section and the transportation roadway of the current section, that is, the return airway of the next section is located right below the transportation roadway of the current section.

### Claim 5 (depends on 1)

The multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, wherein when a thickness of a coal seam section is greater than 5.5 m, upper staggered layout is used for the return airway of the next section and the transportation roadway of the current section, that is, the return airway of the next section is located on a lower left side of the transportation roadway of the current section.

### Claim 6 (depends on 1)

The multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, wherein a flexible bolt-mesh-anchor support manner is used for the return airway in each section.

### Claim 7 (depends on 1)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 1, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata.
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 8 (depends on 2)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 2, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata;
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 9 (depends on 3)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 3, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata;
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 10 (depends on 4)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 4, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata;
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 11 (depends on 5)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 5, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata;
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 12 (depends on 6)

A method for coal pillar filling between sections of the multi-section non-pillar staggered protected roadway for a DITCS according to claim 6, comprising the following steps:
(1) during longwall mining of a DITCS, after a first-section working face is mined, mining out coal on a side obliquely below a second-section return airway along with mining of a second-section working face, successively withdrawing hydraulic supports and placing them onto a working face of a next section, forming crushed coal when fractured coal of a first section on a side obliquely above the roadway is immediately destructed because the roadway becomes instable, and transporting the crushed coal to above a second-section goaf;
(2) allowing caving gangue in a first-section goaf to move towards the second-section goaf along the passage, filling the caving gangue and the crushed coal together obliquely above the second-section goaf, so that an inclined upper part, middle part, and lower part of the second-section goaf are all filled with a destroyed rock strata;
(3) conducting roadway layout, mining, and filling of working faces of a third section, a fourth section, . . . , an Nth section by using a same method as that used for the second section.

### Claim 13 (depends on 7)

The method for coal pillar filling between sections according to claim 7, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.

### Claim 14 (depends on 8)

The method for coal pillar filling between sections according to claim 8, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.

### Claim 15 (depends on 9)

The method for coal pillar filling between sections according to claim 9, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.

### Claim 16 (depends on 10)

The method for coal pillar filling between sections according to claim 10, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.

### Claim 17 (depends on 11)

The method for coal pillar filling between sections according to claim 11, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.

### Claim 18 (depends on 12)

The method for coal pillar filling between sections according to claim 12, a flexible bolt-mesh-anchor support manner is used for all mining roadways, to ensure that gangue in an upper-section goaf can be effectively transported to a lower-section goaf in time.