# US 2020/0208061 A1 · Coke plant tunnel repair and flexible joints

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0208061 A1
- Document ID: US20200208061A1
- Status: Published application
- Kind: A1
- Application number: 16/729,129
- Filed: 2019-12-27
- Published: 2020-07-02
- Earliest claimed: 2018-12-28
- Assignees: Suncoke Technology and Development LLC
- Applicants: Suncoke Technology and Development LLC
- Inventors: John Francis QUANCI; Gary Dean WEST; Daniel C. CHARLES; Ryan L. YATES; Andrew Michael Butor
- Web page: https://patentgrep.com/patent/US20200208061A1

## CPC

- C10B 29/06: Preventing or repairing leakages of the brickwork
- B23P 6/04: Repairing fractures or cracked metal parts or products, e.g. castings
- B29C 73/02: using liquid or paste-like material (B29C73/16 takes precedence)
- B29C 73/10: using patches sealing on the surface of the article (B29C73/14 takes precedence)
- C10B 5/02: with vertical heating flues
- C10B 25/16: Sealing; Means for sealing
- C10B 41/00: Safety devices, e.g. signalling or controlling devices for use in the discharge of coke
- C10B 45/00: Other details
- C23D 5/08: Applying enamels non-uniformly over the surface
- G01M 3/20: using special tracer materials, e.g. dye, fluorescent material, radioactive material
- G01M 3/202: {using mass spectrometer detection systems}
- G01M 3/207: {calibration arrangements}
- C10B 15/02: with floor heating
- C10B 29/02: Brickwork, e.g. casings, linings, walls
- C10B 31/00: Charging devices
- F27D 2019/0006: {Monitoring the characteristics (composition, quantities, temperature, pressure) of at least one of the gases of the kiln atmosphere and using it as a controlling value}
- F27D 2021/0078: {against the presence of an undesirable element in the atmosphere of the furnace}
- Y02P 20/129: Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines
- Y02P 70/10: Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
- C10B: DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS (cracking oils C10G; underground gasification of minerals E21B43/295)
- B23P: METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS (arrangements for copying or controlling B23Q)
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- C23D: ENAMELLING OF, OR APPLYING A VITREOUS LAYER TO, METALS
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- F27D: DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A coke plant includes multiple coke ovens where each coke oven is adapted to produce exhaust gases, a common tunnel fluidly connected to the plurality of coke ovens and configured to receive the exhaust gases from each of the coke ovens, multiple standard heat recovery steam generators fluidly connected to the common tunnel where the ratio of coke ovens to standard heat recovery steam generators is at least 20:1, and a redundant heat recovery steam generator fluidly connected to the common tunnel where any one of the plurality of standard heat recovery steam generators and the redundant heat recovery steam generator is adapted to receive the exhaust gases from the plurality of ovens and extract heat from the exhaust gases and where the standard heat recovery steam generators and the redundant heat recovery steam generator are all connected in parallel with each other.

## Claims

### Claim 1

A flexible seal for positioning between a replacement outer wall portion and a surrounding wall of a tunnel of a high temperature tunnel of a coke manufacturing plant, the flexible seal comprising:
a pillow portion overlapping an interface between the replacement outer wall portion and the surrounding wall of the tunnel;
a fill portion extending radially inward from the pillow portion between the replacement outer wall portion and the surrounding wall of the tunnel, the fill portion comprising:
a first end connected to the pillow portion; and
a second end away from the pillow portion;
a first bracket contacting a first side of the pillow portion, the first bracket connected to the replacement outer wall portion;
a second bracket contacting a second side of the pillow portion opposite the first side of the pillow portion, the second bracket connected to the surrounding wall of the tunnel; and
a belt portion overlaying the pillow portion and connected to the first bracket and to the second bracket.

### Claim 2 (depends on 1)

The flexible seal of claim 1, wherein the belt portion is connected to the first and second brackets via one or more bolts.

### Claim 3 (depends on 1, 2)

The flexible seal of claims claim 1 or 2, wherein the belt portion comprises one or more fluid-impervious layers.

### Claim 4 (depends on 3)

The flexible seal of claim 3, wherein the belt comprises a gas-impermeable outer layer and an insulative inner layer.

### Claim 5 (depends on 4)

The flexible seal of claim 4, wherein the inner layer of the belt comprises aluminized silica.

### Claim 6

A method of constructing or repairing a tunnel in a coke plant, the method comprising:
removing a first portion of a wall of the tunnel;
forming a replacement outer wall portion, the replacement wall portion having a size substantially similar to or larger than the first portion of the wall removed from the wall;
connecting a plurality of anchors to the replacement outer wall portion, each anchor comprising a wall-attachment portion and an anchoring portion;
connecting the replacement outer wall portion to the tunnel in place of the removed first portion of the wall; and
depositing a refractory material on an inner portion of the replacement outer wall portion such that the refractory material encapsulates the anchoring portions of the anchors.

### Claim 7 (depends on 6)

The method of claim 6, further comprising connecting a refractory backer board to the anchors before depositing the refractory material on the inner portion of the replacement outer wall portion, wherein the refractory backer board is positioned between the replacement outer wall portion and the refractory material after the refractory material is deposited.

### Claim 8 (depends on 7)

The method of claim 7, further comprising scoring a first side of the refractory backer board to increase flexibility of the refractory backer board.

### Claim 9 (depends on 6)

The method of claim 6, wherein the refractory material is at least four inches thick as measured normal to an inner surface of the replacement outer wall portion.

### Claim 10 (depends on 6)

The method of claim 6, wherein the replacement outer wall portion comprises steel.

### Claim 11 (depends on 6)

The method of claim 6, wherein depositing the refractory material on the inner portion of the replacement outer wall portion includes gunning the refractory material onto the inner portion of the replacement outer wall portion.

### Claim 12

(canceled)

### Claim 13 (depends on 6)

The method of claim 6, further comprising identifying the first portion of the wall as a portion having damage.

### Claim 14 (depends on 13)

The method of claim 13, further comprising using infrared imaging to determine a boundary of the damage.

### Claim 15 (depends on 14)

The method of claim 14, further comprising defining a perimeter of the first portion of the wall to be replaced outside of the boundary of the damage.

### Claim 16 (depends on 6)

The method of claim 6, wherein the refractory material is configured to withstand heats of at least 600° F.

### Claim 17

(canceled)

### Claim 18 (depends on 6)

The method of claim 6, wherein the refractory material is configured to withstand heats of at least 2800° F.

### Claim 19

(canceled)

### Claim 20 (depends on 6)

The method of claim 6, wherein the refractory material is configured to withstand heats of at least 3200° F.

### Claim 21 (depends on 6)

The method of claim 6, wherein depositing the refractory material on the inner portion of the replacement outer wall portion comprises shooting the refractory material through an opening in the tunnel.

### Claim 22

(canceled)

### Claim 23 (depends on 6)

The method of claim 6, wherein removing a first portion of a wall of the tunnel comprises removing a desired length of tunnel such that the first portion of the wall of the tunnel is an annular portion of tunnel.

### Claim 24 (depends on 6)

The method of claim 6, further comprising sealing a perimeter of the replacement outer wall portion with respect to the tunnel with a seal.

### Claim 25 (depends on 24)

The method of claim 24, wherein sealing the perimeter of the replacement outer wall portion includes introducing a flexible seal between the replacement outer wall portion and a surrounding wall of the tunnel, the flexible seal comprising:
a pillow portion overlapping an interface between the replacement outer wall portion and the surrounding wall of the tunnel;
a fill portion extending radially inward from the pillow portion between the replacement outer wall portion and the surrounding wall of the tunnel, the fill portion comprising:
a first end connected to the pillow portion; and
a second end away from the pillow portion;
a first bracket contacting a first side of the pillow portion, the first bracket connected to the replacement outer wall portion;
a second bracket contacting a second side of the pillow portion opposite the first side of the pillow portion, the second bracket connected to the surrounding wall of the tunnel; and
a belt portion overlaying the pillow portion and connected to the first bracket and to the second bracket.

### Claim 26 (depends on 24)

The method of claim 24, further comprising forming a vacuum high temperature gas-tight seal over the interface between the replacement wall outer portion and the surrounding wall of the tunnel.

### Claim 27 (depends on 26)

The method of claim 26, wherein forming a gas-tight seal over the interface between the replacement wall outer portion and the surrounding wall of the tunnel includes sealing the belt portion against the first bracket and the second bracket.

### Claim 28 (depends on 6)

The method of claim 6, further comprising applying a mastic coating to the inner portion of the replacement outer wall portion.

### Claim at position 29

29-52. (canceled)