# US 2020/0173127 A1 · Method for flood control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0173127 A1
- Document ID: US20200173127A1
- Status: Published application
- Kind: A1
- Application number: 16/783,753
- Filed: 2020-02-06
- Published: 2020-06-04
- Earliest claimed: 2012-12-19
- Inventors: Jon Erik RASMUSSEN
- Web page: https://patentgrep.com/patent/US20200173127A1

## CPC

- E02B 7/38: Rolling gates {or gates moving horizontally in their own plane, e.g. by sliding}
- E02B 3/02: Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow ({harvesting water plants A01D44/00; underwater loosening of soil or rocks for foundation construction E02D17/16}; dredging or scraping devices E02F5/28)
- E02B 5/08: Details, e.g. gates, screens
- E02B 7/205: {Barrages controlled by the variations of the water level; automatically functioning barrages (level regulators G05D9/00; the documents are filed in this subdivision and the relevant subdivision E02B7/26 - E02B7/50)}
- E02B 8/045: {automatically movable}
- F04B 49/065: {and making use of computers}
- F16K 37/005: {for measuring fluid parameters (F16K37/0033 takes precedence)}
- F17D 1/20: Arrangements or systems of devices for influencing or altering dynamic characteristics of the systems, e.g. for damping pulsations caused by opening or closing of valves (fluid dynamics F15D; damping pulsations in fluids in pipes in general F16L55/04)
- G05D 7/06: characterised by the use of electric means {(G05D7/005 takes precedence)}
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- F04B: POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS (machines for liquids, or pumps, of rotary-piston or oscillating-piston type F04C; non-positive-displacement pumps F04D; pumping of fluid by direct contact of another fluid or by using inertia of fluid to be pumped F04F)
- F16K: VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING {(devices for emptying and evacuating the excess liquid in valves or conduits F16L55/07)}
- F17D: PIPE-LINE SYSTEMS; PIPE-LINES (pumps or compressors F04; fluid dynamics F15D; valves or the like F16K; pipes, laying pipes, supports, joints, branches, repairing, work on the entire line, accessories F16L; steam traps or the like F16T; fluid-pressure electric cables H01B9/06)
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES

## Abstract

A dynamic fluid flow control structure is provided that allows precise control over fluid flow using a series of two or more orifices, at least one of which may be reconfigured to change its flow characteristics. A flood control system and a flood control process are provided that emulate a preset discharge profile over time. Some versions of the structure, process, and system can be used to provide controlled storm discharge patterns in a developed area that emulate the natural pre-development discharge patterns.

## Claims

### Claim 1

A method of mimicking a pre-development response to a storm event in a developed watershed at an outlet point, the method comprising:
(a) providing a flow control structure at the outlet point, wherein the flow control structure can be reconfigured to control the rate of flow at the outlet point;
(b) measuring a first rainfall amount at a first time;
(c) calculating a first direct runoff hydrograph based on the first rainfall amount and based on characteristics of the watershed prior to development;
(d) measuring a second rainfall amount at a second time;
(e) calculating a second direct runoff hydrograph based on the second rainfall amount and based on characteristics of the watershed prior to development;
(f) calculating a predevelopment total runoff hydrograph by summing at least the first direct runoff hydrograph and the second direct runoff hydrograph, wherein the total runoff hydrograph is a line having exactly one flow rate value for each time value; and
(g) reconfiguring the flow control structure at a third time to provide a rate of flow about equal to the flow rate value on the predevelopment total runoff hydrograph corresponding to the third time.

### Claim 2 (depends on 1)

The process of claim 1 wherein the predevelopment total runoff hydrograph emulates the relationship between rainfall and rate of volumetric discharge as observed in the developed watershed prior to development.

### Claim 3 (depends on 1)

A machine-readable data storage device comprising a computer program which, when read by a computing device, causes the computing device to perform the process of claim 1.

### Claim 4

A method of mimicking a pre-development response to a storm event in a developed watershed at an outlet point, the method comprising:
(a) providing a flow control structure at the outlet point, wherein the flow control structure can be reconfigured to control the rate of flow at the outlet point;
(b) measuring a first rainfall amount at a first time;
(c) calculating a first direct runoff volume based on the first rainfall amount and based on characteristics of the watershed prior to development;
(d) multiplying the first direct runoff volume to the first ordinate of a unit hydrograph to obtain a first predeveloped total runoff hydrograph value;
(e) reconfiguring the flow control structure at a first time to provide a rate of flow about equal to the flow rate value on the predevelopment total runoff hydrograph corresponding to the first time;
(f) measuring a second rainfall amount at a second time;
(g) calculating a direct runoff volume based on the second rainfall amount and based on characteristics of the watershed prior to development;
(h) multiplying the second direct runoff volume to the first ordinate of a unit hydrograph to obtain a first direct unit hydrograph value for the second time;
(i) multiplying the first direct runoff volume to the second time ordinate of the unit hydrograph to obtain a second direct unit hydrograph value for the second time;
(j) calculating a predevelopment total runoff hydrograph by summing at least the first direct runoff hydrograph value and the second direct unit runoff hydrograph value at the second time, wherein the total runoff hydrograph is a line having exactly one flow rate value for each time value; and
(k) reconfiguring the flow control structure at a second time to provide a rate of flow about equal to the flow rate value on the predevelopment total runoff hydrograph corresponding to the second time.

### Claim 5 (depends on 4)

The process of claim 4 wherein the predevelopment total runoff hydrograph emulates the relationship between rainfall and rate of volumetric discharge as observed in the developed watershed prior to development.

### Claim 6 (depends on 4)

A machine-readable data storage device comprising a computer program which, when read by a computing device, causes the computing device to perform the process of claim 4.
