# US 2020/0141389 A1 · Stability frame, system and method for the installation of a wind turbine on an offshore substructure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0141389 A1
- Document ID: US20200141389A1
- Status: Published application
- Kind: A1
- Application number: 16/620,365
- Filed: 2018-06-19
- Published: 2020-05-07
- Earliest claimed: 2017-06-19
- Assignees: Saipem S.P.A.
- Applicants: SAIPEM S.p.A.
- Inventors: Vincent George McCarthy; Christopher Sexton
- Web page: https://patentgrep.com/patent/US20200141389A1

## CPC

- B66C 1/108: {for lifting parts of wind turbines}
- B63B 75/00: Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
- B66C 23/185: {for use erecting wind turbines (B66C23/207 takes precedence)}
- B66C 23/525: {Double slewing cranes on ships}
- B66C 23/54: {with pneumatic or hydraulic motors, e.g. for actuating jib-cranes on tractors}
- F03D 13/10: Assembly of wind motors; Arrangements for erecting wind motors
- F03D 13/25: specially adapted for offshore installation
- F05B 2230/61: using auxiliary equipment for lifting or holding
- F05B 2230/6102: carried on a floating platform
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/727: Offshore wind turbines
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A stability frame for the installation of a wind turbine on an offshore substructure, wherein the wind turbine comprises a tower configured to be anchored to a rigging assembly below the barycenter of the wind turbine, has a main body configured to be mounted about the upper part of the tower; and a plurality of guides, which extend outwardly from the main body and are configured for constraining parts of the rigging assembly so as to laterally support the wind turbine by the rigging assembly.

## Claims

### Claim at position 1

1-21. (canceled)

### Claim at position 2

22: A wind turbine offshore substructure installation stability frame comprising:
a main body configured to be mounted about an upper part of a tower of a wind turbine, the tower being configured to be anchored to a rigging assembly below a barycenter of the wind turbine;
a plurality of guides each extending outwardly from the main body and are each configured to constrain a part of the rigging assembly; and
two hooking members mounted on the main body and configured to cooperate with an automatic hooking assembly of a crane vessel.

### Claim at position 3 (depends on 22)

23: The wind turbine offshore substructure installation stability frame of claim 22, wherein the main body comprises two attachments for tugger lines.

### Claim at position 4 (depends on 22)

24: The wind turbine offshore substructure installation stability frame of claim 22, wherein the main body is U-shaped.

### Claim at position 5 (depends on 22)

25: The wind turbine offshore substructure installation stability frame of claim 22, wherein each guide comprises two bars with flared free ends configured to facilitate an insertion of the part of the rigging assembly into the guide.

### Claim at position 6 (depends on 22)

26: The wind turbine offshore substructure installation stability frame of claim 22, wherein the plurality of guides comprises four guides arranged two-by-two along opposite sides of the main body.

### Claim at position 7 (depends on 22)

27: The wind turbine offshore substructure installation stability frame of claim 22, further comprising a clamp assembly mounted on the main body and configured to selectively anchor the main body to the tower and release the main body from the tower.

### Claim at position 8 (depends on 27)

28: The wind turbine offshore substructure installation stability frame of claim 27, wherein the clamp assembly comprises at least one idle clamp mounted to the main body and extending inwardly from the main body, and two actuated clamps configured to be actuated between retracted positions and inwardly projecting positions towards the idle clamp.

### Claim at position 9 (depends on 28)

29: The wind turbine offshore substructure installation stability frame of claim 28, further comprising at least one hydraulic cylinder for each actuated clamp.

### Claim at position 10

30: A wind turbine offshore substructure installation system comprising:
a stability frame comprising:
a main body mounted about an upper part of a tower of a wind turbine,
a plurality of guides each extending outwardly from the main body, and
two hooking members mounted on the main body;
a crane vessel comprising an automatic hooking assembly that cooperates with the two hooking members of the stability frame; and
a rigging assembly anchored to the tower below a barycenter of the wind turbine and configured to be constrained by the stability frame.

### Claim at position 11 (depends on 30)

31: The wind turbine offshore substructure installation system of claim 30, wherein the crane vessel comprises a first lifting crane and a second lifting crane, and the rigging assembly comprises a first rigging that operates with the first lifting cane and a second rigging that operates with the second lifting crane.

### Claim at position 12 (depends on 31)

32: The wind turbine offshore substructure installation system of claim 31, wherein each rigging comprises two hoisting lines, each hoisting line comprising a distal eyelet anchored to the tower and a rigid section inserted into a guide of the stability frame.

### Claim at position 13 (depends on 30)

33: The wind turbine offshore substructure installation system of claim 30, further comprising a hydraulic circuit comprising a first portion mounted on the stability frame, a second portion located in a remote position with respect to the stability frame, and an umbilical that selectively connects the first portion to the second portion.

### Claim at position 14 (depends on 33)

34: The wind turbine offshore substructure installation system of claim 33, wherein:
the first portion comprises a remotely controlled valve, a quick connect coupling connected to the umbilical, and a hydro-pneumatic accumulator, and
the second portion comprises a high-pressure unit.

### Claim at position 15 (depends on 30)

35: The wind turbine offshore substructure installation system of claim 30, further comprising a control system comprising a first portion mounted on the stability frame, a second portion located in a remote position with respect to the stability frame, and an umbilical that selectively connects the first portion to the second portion.

### Claim at position 16 (depends on 35)

36: The wind turbine offshore substructure installation system of claim 35, wherein:
the first portion comprises a sensor configured to acquire a signal correlated to the operating status of the stability frame, and
the second portion comprises a control unit and a control panel.

### Claim at position 17 (depends on 30)

37: The wind turbine offshore substructure installation system of claim 30, further comprising a first winch that operates a first tugger line connected to the stability frame.

### Claim at position 18 (depends on 37)

38: The wind turbine offshore substructure installation system of claim 37, further comprising a second winch that operates a second tugger line connected to a bottom of the tower.

### Claim at position 19

39: A method of installing a wind turbine on an offshore substructure, the method comprising:
coupling a stability frame to an upper half of a tower of the wind turbine, the stability frame comprising a main body, a plurality of guides each extending outwardly from the main body, and two hooking members mounted on the main body;
controlling a rigging assembly by a crane vessel;
anchoring the rigging assembly to a lower part of the tower below a barycenter of the wind turbine;
constraining a plurality of parts of the rigging assembly into the plurality of guides of the stability frame;
vertically lifting the wind turbine by the crane vessel;
transferring the wind turbine to the offshore substructure; and
lowering the wind turbine on the offshore substructure.

### Claim at position 20 (depends on 39)

40: The method of claim 39, wherein controlling the rigging assembly comprises controlling a first rigging of the rigging assembly by a first lifting crane of the crane vessel and controlling a second rigging of the rigging assembly by a second lifting crane of the crane vessel to insert the plurality of parts of the rigging assembly into the plurality of guides of the stability frame from opposite sides of the stability frame.

### Claim at position 21 (depends on 39)

41: The method of claim 39, wherein coupling the stability frame comprises clamping the stability frame to the upper half of the tower by a hydraulic cylinder mounted on the stability frame.

### Claim at position 22 (depends on 39)

42: The method of claim 39, further comprising tensioning a first plurality of tugger lines between the stability frame and the crane vessel.

### Claim at position 23 (depends on 42)

43: The method of claim 42, further comprising tensioning a second plurality of tugger lines between a lower part of the tower and the crane vessel.