3d block modelling of a resource boundary in a post-blast muckpile to optimize destination delineation
AssigneeOrePro Holdings LLC
InventorsTimothy William Hunt, David Mario La Rosa, Jeffrey Scott Seaman
Life of this patent
Estimating the term…
Loading patent…
AssigneeOrePro Holdings LLC
InventorsTimothy William Hunt, David Mario La Rosa, Jeffrey Scott Seaman
Estimating the term…
A method for 3-D block modelling of a resource boundary in a post-blast muckpile to optimize destination delineation for resource control is provided. An in-situ pre-blast model of an ore deposit to be mined, movement data, blast design and explosive loading information, and post-blast topographic data are input in to the memory of a general purpose computer. Using the pre-blast block model, movement data, blast design and explosive loading information, and post-blast topographic data a three-dimensional vector field is generated. The method uses the three-dimensional vector field to move a plurality of centroids of the in-situ block model to populate a three-dimensional post-blast location. Then method optimizes the populated three dimensional post-blast location to determine a plurality of sets of optimal dig boundaries.
A method for 3-D block modelling of a resource boundary in a post-blast muckpile to optimize desired delineation for resource control, the method comprising the steps of:
A method for 3-D block modelling of a resource boundary in a post-blast muckpile to optimize grade control polygons for ore control, comprising:
A method of optimizing grade control polygons in a post-blast muckpile, comprising,
In an electronic system for storing and manipulating information, a computer implemented method of representing a three-dimensional post-blast block model of resource boundaries on a screen display, the method comprising:
Dependencies are inferred from the claim text.