Train Load-Out Arrangement
AssigneeDer-Chang John Lee Atf Ikhthus Trust
InventorDer-Chang John LEE
Life of this patent
Estimating the term…
Loading patent…
AssigneeDer-Chang John Lee Atf Ikhthus Trust
InventorDer-Chang John LEE
Estimating the term…
A train load-out arrangement having a hopper for operatively containing particulate material and includes a discharge chute with a controllable gate or valve via which the material is operatively dischargeable into ore wagons of a rail. The arrangement includes a first track scale arranged on the track distal from the discharge chute, as well as a second track scale arranged on the track directly underneath the discharge chute. Arrangement also includes a controller arranged in signal communication with the gate and track scales and configured to determine a first wagon axle weight-displacement profile via the first track scale and a second wagon axle weight-displacement profile via the second track scale as material is discharged into a wagon, and compare said first and second wagon axle weight-displacement profiles to produce a real-time noise-compensated wagon axle weight-displacement profile.
1-35. (canceled)
A train load-out arrangement comprising:
The arrangement of claim 1, wherein a track scale comprises at least one strain gauge fitted to the track, wherein the track scale comprises a plurality of strain gauges fitted over a portion of the track.
The arrangement of any of the preceding claims, wherein the controller compares the first and second wagon axle weight-displacement profiles to produce a real-time noise-compensated wagon axle weight-displacement profile by subtracting noise-induced discrepancies in the first profile from the second profile in real-time, so that the noise-compensated profile provides a real-time indication of wagon weight.
A controller for a train load-out arrangement having a hopper operatively containing particulate material and having a discharge chute with controllable gate via which the material is operatively dischargeable into ore wagons of a rail consist passing beneath said chute on a rail track, as well as a first track scale arranged on the track distal from the discharge chute and a second track scale arranged on the track underneath the discharge chute, said controller arranged in signal communication with the gate and track scales and configured to, as the consist passes along the track:
A method for loading a train consist with particulate material, said method comprising the steps of:
Dependencies are inferred from the claim text.