Production management apparatus, method, and non-transitory medium
AssigneeNEC Corporation
InventorsEisuke SANEYOSHI, Shigeru KOUMOTO, Akira SHOUJIGUCHI, Rie IWASAKI, Takahiro TOIZUMI, Ryota SUZUKI
Life of this patent
Estimating the term…
Abstract
There are provided a repair determination section that determines, based on failure information on the facility for manufacturing a product, a repair time required to repair the facility, and a recovery plan creation section that creates a recovery plan in accordance with a predetermined production evaluation indicator, based on the repair time and production information on a line with the failed facility, one or more other facilities, and on one or more other lines.
Claims20
A production management apparatus comprising:
- a processor;
- and
- a memory that stores program instructions executable by the processor, wherein the processor is configured to:
- determine, based on failure information on a facility for manufacturing a product, a repair time required to repair the facility;
- and
- create a recovery plan in accordance with a predetermined production evaluation indicator, based on the repair time and production information on a line with the failed facility, one or more other relevant facilities, and on one or more other relevant lines.
A computer-based production management method, the method comprising:
- determining, based on failure information on a facility for manufacturing a product, a repair time required to repair the facility;
- and
- creating a recovery plan in accordance with a predetermined production evaluation indicator, based on the repair time and production information on a line with the failed facility, one or more other relevant facilities, and on one or more other relevant lines.
A non-transitory computer-readable recording medium storing therein a program causing a computer to execute processing comprising:
- determining, based on failure information on a facility for manufacturing a product, a repair time required to repair the facility;
- and
- creating a recovery plan in accordance with a predetermined production evaluation indicator, based on the repair time and production information on a line equipped with the failed facility, one or more other facilities, and on one or more other lines.
Dependencies are inferred from the claim text.