Low-observability matrix completion
AssigneeAlliance for Sustainable Energy, LLC
InventorsAndrey BERNSTEIN, Yingchen ZHANG, Andreas Joachim SCHMITT
Life of this patent
Estimating the term…
Abstract
An example device includes at least one processor configured to receive electrical parameter values corresponding to at least one first location within a power network. The at least one processor is further configured to determine, using matrix completion and based on the at least one electrical parameter value, an estimated value of at least one unknown electrical parameter. The at least one unknown electrical parameter corresponds to a second location within the power network. The at least one processor is also configured to cause at least one device within the power network to modify operation based on the estimated value of the at least one unknown electrical parameter.
Claims18
A device comprising:
- at least one processor configured to:
- receive at least one electrical parameter value corresponding to at least one first location within a power network;
- determine, using matrix completion, based on the at least one electrical parameter value, an estimated value of at least one unknown electrical parameter, wherein the at least one unknown electrical parameter corresponds to a second location within the power network;
- and
- cause at least one device within the power network to modify operation based on the estimated value of the at least one unknown electrical parameter.
A method comprising:
- receiving, by a power network management system comprising at least one processor, at least one electrical parameter value corresponding to at least one first location within a power network;
- determining, by the power network management system, using matrix completion, based on the at least one electrical parameter value, an estimated value of at least one unknown electrical parameter, wherein the at least one unknown electrical parameter corresponds to a second location within the power network;
- and
- causing, by the power network management system, at least one device within the power network to modify operation based on the estimated value of the at least one unknown electrical parameter.
Dependencies are inferred from the claim text.