Rapid testing of configuration changes in software defined infrastructure
AssigneeInternational Business Machines Corporation
InventorsBrian O'Connell, Shyam Manohar, Richard A. Locke, Aaron K. Baughman
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsBrian O'Connell, Shyam Manohar, Richard A. Locke, Aaron K. Baughman
Estimating the term…
A future event that is likely to occur in a production SDI at a future time is forecasted by analyzing operational data from the production SDI. Using a repository of correlation records, a set of configurations is forecasted likely to change in response to the future event. Corresponding to a configuration from the forecasted set of configurations, an instruction is constructed for a testing SDI. The testing SDI is caused by the instruction to initialize a test VM in the testing SDI, where the test VM is specifically configured to test a change in the configuration from the forecasted set of configurations, and where the test VM is ready to test the change when the future event occurs at the future time.
A method comprising:
A computer usable program product comprising a computer-readable storage device, and program instructions stored on the storage device, the stored program instructions comprising:
A computer system comprising a processor, a computer-readable memory, and a computer-readable storage device, and program instructions stored on the storage device for execution by the processor via the memory, the stored program instructions comprising:
Dependencies are inferred from the claim text.