# US 2020/0002780 A1 · Rail and method for producing same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2020/0002780 A1
- Document ID: US20200002780A1
- Status: Published application
- Kind: A1
- Application number: 16/489,172
- Filed: 2018-03-20
- Published: 2020-01-02
- Earliest claimed: 2017-03-21
- Assignees: Jfe Steel Corporation
- Applicants: Jfe Steel Corporation
- Inventors: Minoru HONJO; Tatsumi KIMURA; Katsuyuki ICHIMIYA; Kazukuni HASE
- Web page: https://patentgrep.com/patent/US20200002780A1

## CPC

- C21D 9/04: for rails
- B21B 3/02: Rolling special iron alloys {, e.g. stainless steel}
- C21D 6/002: {containing Cr (C21D6/004 takes precedence)}
- C21D 6/005: {containing Mn}
- C21D 6/008: {containing Si}
- C21D 7/10: of the whole cross-section, e.g. of concrete reinforcing bars
- C21D 8/00: Modifying the physical properties of ferrous metals or ferrous alloys by deformation combined with, or followed by, heat treatment (hardening articles or materials formed by forging or rolling with no further heating beyond that required for the formation C21D1/02)
- C22C 38/002: {containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60}
- C22C 38/02: containing silicon
- C22C 38/04: containing manganese
- C22C 38/06: containing aluminium
- C22C 38/18: containing chromium
- C22C 38/22: with molybdenum or tungsten
- C22C 38/24: with vanadium
- C22C 38/26: with niobium or tantalum
- C22C 38/28: with titanium or zirconium
- C22C 38/32: with boron
- C22C 38/40: with nickel
- G01M 5/0025: {of elongated objects, e.g. pipes, masts, towers or railways (G01M5/0058 takes precedence)}
- G01M 5/0041: {by determining deflection or stress}
- C21D 2211/009: Pearlite
- C21D: MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING (surface treatment of metallic material involving at least one process provided for in class C23 and at least one process covered by this subclass C23F17/00; unidirectional solidification of eutectic materials or unidirectional demixing of eutectoid materials C30B)
- B21B: ROLLING OF METAL (auxiliary operations used in connection with metal-working operations covered in B21, see B21C; bending by rolling B21D; manufacture of particular objects, e.g. screws, wheels, rings, barrels, balls, by rolling B21H; pressure welding by means of a rolling mill B23K20/04)
- C22C: ALLOYS (treatment of alloys C21D, C22F)
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

A rail exhibits a high 0.2% proof stress after shipping, which is effective for improving rolling contact fatigue resistance of the rail, the rail having a chemical composition containing C: 0.70% to 0.85%, Si: 0.1% to 1.5%, Mn: 0.4% to 1.5%, P: 0.035% or less, S: 0.010% or less, and Cr: 0.05% to 1.50%, with the balance being Fe and inevitable impurities, and exhibiting, at least 90 days after a preparation date of a steel material inspection certificate of the rail which describes at least a measurement result of a 0.2% proof stress of a head of the rail, an improvement margin of a 0.2% proof stress of 40 MPa or more, relative to the 0.2% proof stress described in the steel material inspection certificate.

## Claims

### Claim 1

A rail accompanied by a steel material inspection certificate which describes at least a measurement result of a 0.2% proof stress of a head of the rail, having a chemical composition containing, in mass%,
C: 0.70% to 0.85%,
Si: 0.1% to 1.5%,
Mn: 0.4% to 1.5%,
P: 0.035% or less,
S: 0.010% or less, and
Cr: 0.05% to 1.50%, with the balance being Fe and inevitable impurities,
wherein the rail exhibits, at least 90 days after a preparation date of the steel material inspection certificate, an improvement margin of a 0.2% proof stress of 40 MPa or more, relative to the 0.2% proof stress described in the steel material inspection certificate.

### Claim 2 (depends on 1)

The rail according to claim 1, wherein the chemical composition further contains, in mass%, at least one selected from the group consisting of
V: 0.30% or less,
Cu: 1.0% or less,
Ni: 1.0% or less,
Nb: 0.05% or less,
Mo: 0.5% or less,
Al: 0.07% or less,
W: 1.0% or less,
B: 0.005% or less, and
Ti: 0.05% or less.

### Claim 3

A method for producing a rail, comprising:
hot rolling a steel raw material to obtain a rail, the steel raw material having a chemical composition containing, in mass %,
C: 0.70% to 0.85%,
Si: 0.1% to 1.5%,
Mn: 0.4% to 1.5%,
P: 0.035% or less,
S: 0.010% or less, and
Cr: 0.05% to 1.50%, with the balance being Fe and inevitable impurities;
straightening the rail with a load of 100 tf or more; and
preparing a steel material inspection certificate including at least a measurement result of a 0.2% proof stress of a head of the rail within 480 hours after the straightening.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the chemical composition further contains, in mass%, at least one selected from the group consisting of
V: 0.30% or less,
Cu: 1.0% or less,
Ni: 1.0% or less,
Nb: 0.05% or less,
Mo: 0.5% or less,
Al: 0.07% or less,
W: 1.0% or less,
B: 0.005% or less, and
Ti: 0.05% or less.
