# US 2019/0380091 A1 · Adaptive Method for Aggregation of Distributed Loads to Provide Emergency Frequency Support

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0380091 A1
- Document ID: US20190380091A1
- Status: Published application
- Kind: A1
- Application number: 16/392,509
- Filed: 2019-04-23
- Published: 2019-12-12
- Earliest claimed: 2018-06-07
- Assignees: State Grid Corporation of China; Global Energy Interconnection Research Institute North America; State Grid Jiangsu Electric Power Co., Ltd.
- Inventors: Haifeng Li; Xiao Lu; Yingmeng Xiang; Chunlei Xu; Di Shi; Zhe Yu; Shiming Xu; Xueming Li; Jiangpeng Dai; Zhiwei Wang
- Web page: https://patentgrep.com/patent/US20190380091A1

## CPC

- H04W 52/0212: {managed by the network, e.g. network or access point is leader and terminal is follower}
- G05B 13/042: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3287: by switching off individual functional units in the computer system
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 3/00142: {Oscillations concerning frequency}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 13/1337: {involving the use of Internet protocols}
- H04W 52/0274: {by switching on or off the equipment or parts thereof}
- H02J 2105/51: {according to a condition being electrical}
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02D 30/70: in wireless communication networks
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems and methods are disclosed for power management by estimating power contingency of a grid at a cloud control center; performing decentralized real-time measurement and making local decisions at one more computer controlled outlets connected to the grid; and aggregating distributed loads to provide emergency frequency support to the grid.

## Claims

### Claim 1

A method for power management, comprising:
estimating power contingency of a grid at a cloud control center;
performing decentralized real-time measurement and making local decisions at one more locally/remotely controlled outlets connected to the grid; and
aggregating distributed loads to provide emergency frequency support to the grid.

### Claim 2 (depends on 1)

The method of claim 1, wherein in the cloud control center, performing decision-making for frequency control by determining one or more flexible loads to shed based on the power system state, total amount of flexible loads, importance of the flexible loads, and possible contingencies.

### Claim 3 (depends on 1)

The method of claim 1, wherein in the cloud control center, performing decision-making for frequency control by analyzing switching-off conditions of the computer controlled outlets and send the conditions to the computer controlled outlets.

### Claim 4 (depends on 1)

The method of claim 1, comprising continuously measuring a frequency of the grid at the locally/remotely controlled outlets.

### Claim 5 (depends on 4)

The method of claim 4, comprising switching off one or more appliances when switching-off conditions are satisfied, or when switching-off commands sent from the cloud control center.

### Claim 6 (depends on 1)

The method of claim 1, wherein the locally/remotely controlled outlets measure voltage, current, active power, reactive power, frequency, rate of frequency change (ROFC), and switch status one or more plugged-in appliances in real-time continuously.

### Claim 7 (depends on 1)

The method of claim 1, wherein the control center aggregates the locally/remotely controlled outlets into hierarchical blocks based on appliance types and locations.

### Claim 8 (depends on 1)

The method of claim 1, wherein from measurements sent from the outlets and a total power of each block, and total power of all blocks are used to control and manage the outlets.

### Claim 9 (depends on 1)

The method of claim 1, comprising updating power system model and parameters.

### Claim 10 (depends on 1)

The method of claim 1, comprising determining a frequency response in the time domain as
Δ


f

(
t
)
=
-
R


Δ


P
DR
+
K
m

[
1
+
α


e
-
ζ


ω
n

t

sin

(
ω
r

t
+
∅
)
]
where
α
=
1
-
2

T
R

ζω
n
+
T
R
2

ω
n
2
1
-
ζ
2
ω
r
=
ω
n

1
-
ζ
2

∅
=
∅
1
-
∅
2
=
tan
-
1

(
T
R

ω
r
1
-
ζω
n

T
R
)
-
tan
-
1
(
1
-
ζ
2
-
ζ
)
ω
n
=
DR
+
K
m
2

HR
·
T
R
ζ
=
2

HR
+
(
DR
+
K
m

F
H
)

T
R
2

(
DR
+
K
m
)

ω
n
Δf(t) is the frequency change; R is a constant of the governor speed-droop control; ΔP is the initial power loss; D is the amount of load damping which indicates the sensitivity of the load in response to frequency change; Km is the power gain factor; H is the equivalent inertia constant of the system; ΔPSP is the change of the generator power set point; FH is the fraction of the power generator by the reheat turbine.

### Claim 11 (depends on 1)

The method of claim 1, comprising receiving an initial power loss ΔP at time t0=0, and determining a rate of frequency change (ROFC) g(t) as:
g

(
t
)
=
d


Δ


f

(
t
)
dt
=
-
αω
n

R


Δ


P
DR
+
K
m

e
-
ζ


ω
n

t

sin

(
ω
r

t
+
∅
1
)
]

### Claim 12 (depends on 1, 3)

The method of claim 1,3, when the ROFC is zero, comprising determining a minimum frequency fnadir and a time tnadir taken to reach fnadir as:
t
nadir
=
π
-
∅
1
ω
r
=
1
ω
r

tan
-
1

(
T
R

ω
r
ζ


ω
n

T
R
-
1
)

### Claim 13 (depends on 1)

The method of claim 1, comprising determining fnadir as:
f
nadir
=
f
n
-
R


Δ


P
DR
+
K
m

[
1
+
α


e
-

ζω
n

t
nadir

sin

(
ω
r

t
nadir
+
∅
)
]
where fn is the pre-contingency frequency of the steady state, and it is typically 1 in per unit.

### Claim 14 (depends on 1)

The method of claim 1, comprising ensuring the system frequency does not drop to below a under frequency load shedding (UFLS) point while minimizing the amount of load shedding by the locally/remotely controlled outlets.

### Claim 15 (depends on 1, 9)

The method of claim 1,9, comprising determining a threshold power loss ΔPs as
Δ


P
s
=
(
f
n
-
f
s
)
×
(
DR
+
K
m
)
R
×
[
1
+
α


e
-
ζω
n

t
nadir

sin

(
ω
r

t
nadir
+
∅
)
]
where fs is the minimal frequency allowed for the frequency control strategy.

### Claim 16 (depends on 1)

The method of claim 1, comprising determining a minimal controllable power ΔPv to be shed to prevent the frequency from dropping below fs as:
Δ


P
v
=
{
Δ


P
ma


x
-
Δ


P
s
if


Δ


P
ma


x
>
Δ


P
s
0
if


Δ


P
ma


x

≤
Δ


P
s
where a maximum amount of sudden power deficit induced among all the contingencies is Pmax.

### Claim 17 (depends on 1, 5)

The method of claim 1,5, comprising determining the frequency value fx and related ROFC value gx after the loss of power ΔPs at time at any time tx as
f
x
=
f
n
-
R


Δ


P
s
DR
+
K
m

[
1
+
α


e
-
ζ


ω
n

t
x

sin

(
ω
r

t
x
+
∅
)
]
g
x
=
αω
n

R


Δ


P
s
DR
+
K
m

e
-
ζ


ω
n

t
x

sin

(
ω
r

t
x
+
∅
1
)

### Claim 18 (depends on 1, 5)

The method of claim 1,5, comprising locally determining the switching as: if the real-time frequency measurement is fx, and at the same time the ROFC measurement is lower than gx, the switching-off condition is satisfied. For robustness, the locally/remotely controlled outlet will switch off when the switching-off condition is satisfied for multiple times.
