# US 2019/0379273 A1 · Control system and control method for reducing total harmonic distortion

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0379273 A1
- Document ID: US20190379273A1
- Status: Published application
- Kind: A1
- Application number: 16/427,503
- Filed: 2019-05-31
- Published: 2019-12-12
- Earliest claimed: 2018-06-11
- Assignees: Silergy Semiconductor Technology (Hangzhou) LTD
- Applicants: Silergy Semiconductor Technology (Hangzhou) LTD
- Inventors: Longqi Wang; Jianxin Wang
- Web page: https://patentgrep.com/patent/US20190379273A1

## CPC

- H02M 1/4225: {using a non-isolated boost converter}
- H02M 1/12: Arrangements for reducing harmonics from AC input or output
- H02M 3/156: with automatic control of output voltage or current, e.g. switching regulators
- H02M 1/0009: {Devices or circuits for detecting current in a converter}
- H02M 1/0058: {by employing soft switching techniques, i.e. commutation of transistors when applied voltage is zero or when current flow is zero (using an auxiliary actively switched resonant commutation circuit connected to an intermediate DC voltage or between two push-pull branches of an inverter bridge H02M7/4811; in resonant inverters H02M7/4815; in inverters operating from a resonant DC source H02M7/4826)}
- Y02B 70/10: Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS

## Abstract

A method of reducing THD can include: acquiring a first average inductor current during a first conduction time of a main power transistor of a power converter in a switching cycle; acquiring a second average inductor current during a second conduction time and an off time of the main power transistor in the switching cycle; and adjusting the second conduction time of the main power transistor in accordance with a difference between the first and second average inductor currents, where the first and second conduction times are successive.

## Claims

### Claim 1

A method of reducing total harmonic distortion (THD), the method comprising:
a) acquiring a first average inductor current during a first conduction time of a main power transistor of a power converter in a switching cycle;
b) acquiring a second average inductor current during a second conduction time and an off time of said main power transistor in said switching cycle; and
c) adjusting said second conduction time of said main power transistor in accordance with a difference between said first and second average inductor currents, wherein said first and second conduction times are successive.

### Claim 2 (depends on 1)

The method of claim 1, wherein said adjusting said second conduction time comprises:
a) determining whether said first average inductor current is greater than said second average inductor current;
b) increasing said second conduction time of said main power transistor when said first average inductor current is greater than said second average inductor current; and
c) decreasing said second conduction time of said main power transistor when said first average inductor current is not greater than said second average inductor current.

### Claim 3 (depends on 1)

The method of claim 1,wherein said acquiring said first and second average inductor currents comprises:
a) sampling a first inductor current during said first conduction time;
b) sampling a second inductor current during said second conduction time;
c) sampling a third inductor current during an off time of said main power transistor in said switching cycle;
d) generating said first average inductor current based on an average of said first inductor current during said first conduction time; and
e) generating said second average inductor current based on an average of said second inductor current during said second conduction time and said third inductor current during said off time.

### Claim 4

An apparatus for reducing total harmonic distortion (THD), comprising:
a) a sampling circuit configured to acquire a first average inductor current during a first conduction time of a main power transistor of a power converter in a switching cycle, and to acquire a second average inductor current during a second conduction time and an off time of said main power transistor in said switching cycle; and
b) a regulation circuit configured to adjust said second conduction time of said main power transistor based on a difference between said first and second average inductor currents, wherein said first and second conduction times are successive.

### Claim 5 (depends on 4)

The apparatus of claim 4, wherein said second conduction time of said main power transistor is increased by said regulation circuit when said first average inductor current is greater than said second average inductor current, and said second conduction time of said main power transistor is decreased by said regulation circuit when said first average inductor current is not greater than said second average inductor current.

### Claim 6 (depends on 4)

The apparatus of claim 4, wherein said sampling circuit is configured to:
a) sample a first inductor current flowing through said main power transistor during said first conduction time;
b) sample a second inductor current flowing through said main power transistor during said second conduction time;
c) sample a third inductor current flowing through a second transistor coupled in series with said main power transistor during an off time of said main power transistor in said switching cycle;
d) generate said first average inductor current based on an average of said first inductor current during said first conduction time; and
e) generate said second average inductor current based on an average of said second inductor current during said second conduction time and said third inductor current during said off time.

### Claim 7 (depends on 4)

The apparatus of claim 4, wherein said regulation circuit comprises a constant on-time control circuit configured to generate a first turn-on signal for characterizing said first conduction time based on a feedback voltage representative of an output voltage of said power converter, in order to control said main power transistor to be turned on for a constant period of time corresponding to said first conduction time.

### Claim 8 (depends on 7)

The apparatus of claim 7, wherein said regulation circuit further comprises a conduction compensation control circuit configured to generate a first compensation signal based on said difference between said first and second average inductor currents, and to regulate said second conduction time by adjusting said first compensation signal.

### Claim 9 (depends on 8)

The apparatus of claim 8, wherein when said first turn-on signal is inactive, said conduction compensation control circuit is configured to control a first ramp signal to increase to said first compensation signal, in order to generate a second turn-on signal for characterizing said second conduction time.

### Claim 10 (depends on 9)

The apparatus of claim 9, wherein said regulation circuit further comprises a logic circuit configured to generate an on-time signal to control said main power transistor to be turned on when a set signal representing that an inductor current of said power converter is low is activated, and to generate a turn-off signal for controlling said sampling circuit when said second conduction time ends.

### Claim 11 (depends on 10)

The apparatus of claim 10, wherein said sampling circuit comprises:
a) a first sampling circuit coupled to said main power transistor, and being configured to obtain said first average inductor current during said first conduction time when said first
b) a second sampling circuit coupled to said main power transistor, and being configured to obtain an average inductor current at said second conduction time when said second turn-on signal is active; and
c) a third sampling circuit coupled to a second transistor that is coupled to said main power transistor, and being configured to obtain an average inductor current during said off time when said turn-off signal is active.

### Claim 12 (depends on 10)

The apparatus of claim 10, wherein said sampling circuit comprises:
a) a fourth sampling circuit configured to obtain said first average inductor current at said first conduction time when said first turn-on signal is active; and
b) a fifth sampling circuit configured to obtain said second average inductor current when said second turn-on signal and said turn-off signal are active, wherein said fourth and fifth sampling circuits are coupled to one terminal of a sampling resistor, and another terminal of said sampling resistor is coupled to said main power transistor.

### Claim 13 (depends on 10)

The apparatus of claim 10, wherein said second turn-on signal for characterizing said second conduction time is active from a time instant of said first turn-on signal going inactive to a time instant of said turn-off signal being activated.

### Claim 14 (depends on 4)

The apparatus of claim 4, wherein said power converter comprises a boost converter.
