# US 2019/0376714 A1 · Method for carrying out an outside temperature-related control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0376714 A1
- Document ID: US20190376714A1
- Status: Published application
- Kind: A1
- Application number: 16/485,300
- Filed: 2018-02-14
- Published: 2019-12-12
- Earliest claimed: 2017-02-14
- Assignees: Grundfos Holding A/S
- Applicants: Grundfos Holding A/S
- Inventors: Casper HILLERUP LYHNE; Peter ELVEKJÆR
- Web page: https://patentgrep.com/patent/US20190376714A1

## CPC

- F24F 11/63: Electronic processing
- G05D 23/1917: {using digital means}
- F24F 11/58: using Internet communication
- F24F 2110/10: Temperature
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES

## Abstract

A method carries out an outside temperature-dependent control of at least one thermal power indicative parameter of a supply temperature of a first heating or cooling system in a first building (H). The control is carried out on the basis of the at least one thermal power indicative parameter. The at least one thermal power indicative parameter is indicative of the heat consumption or of the cooling power of at least one second heating or cooling system of a second building (H′, H″, H′″), located at a distance from the first building, and is received via a data network (1), in particular, via the Internet. An arrangement is provided for controlling a first heating or cooling system of a first building, wherein the arrangement is adapted to carry out the method mentioned above. A server is further provided that is adapted to receive at least one thermal power indicative parameter.

## Claims

### Claim 1

A method for carrying out an outside temperature-related control of a thermal property of at least a portion of a first building by regulation of a supply temperature of a first heating or cooling system of a first building, the method comprising the steps of
controlling the regulation of the supply temperature on the basis of the at least one thermal power indicative parameter, wherein the at least one thermal power indicative parameter is indicative of the heat consumption or of the cooling power of at least one second heating or cooling system of a second building located at a distance from the first building;
receiving the at least one thermal power indicative parameter via a data network; and
receiving, at a first heating or cooling system in the first building, a leading signal indicative of a time derivative of the at least one thermal power indicative parameter from a data storage for controlling the at least one thermal power indicative parameter.

### Claim 2 (depends on 1)

A method according to claim 1, wherein data indicative of the heat consumption or data concerning the cooling power of the at least one second heating or cooling system is collected continuously.

### Claim 3 (depends on 1)

A method according to claim 1, wherein the time derivative of the at least one thermal power indicative parameter is determined.

### Claim 4 (depends on 1)

A method according to claim 1, wherein the distance of the at least one second building to the first building is incorporated into the control of the at least one thermal power indicative parameter of the first heating or cooling system according to the leading signal.

### Claim 5 (depends on 1)

A method according to claim 1, characterized in that the at least one thermal power indicative parameter is indicative of the heat consumption or the cooling power of a plurality of additional heating or cooling systems of respective additional buildings being located at a distance from the first building.

### Claim 6 (depends on 5)

A method according to claim 5, wherein a relation between the at least one thermal power indicative parameter of the first building and the additional heating or cooling systems of respective additional buildings are determined.

### Claim 7 (depends on 5)

A method according to claim 5, wherein a gain factor is assigned to each of the additional buildings, wherein the gain factor is based on the relation between the at least one thermal power indicative parameter of the first building and the additional heating or cooling system of respective additional buildings, wherein the gain factors are adjusted on an ongoing basis.

### Claim 8 (depends on 5)

A method according to claim 5, wherein the first heating system in the first building is a floor heating system.

### Claim 9 (depends on 1)

A method according to claim 1, wherein the data calculated from the heat consumption or the cooling power received from the additional heating or cooling systems of the additional buildings is incorporated into the leading signal in a weighted manner.

### Claim 10 (depends on 2)

A method according to claim 2, wherein a determination of the accuracy of controlling of the at least one thermal power indicative parameter according to the leading signal is carried out.

### Claim 11 (depends on 1)

A method according to claim 1, wherein the control of the thermal property further is based on
predetermined comfort specifications with respect to temperature, according to the time of day;
an energy flow rate; and/or
additional control information being transmitted by a user.

### Claim 12 (depends on 1)

A method according to claim 1, wherein components arranged in the first heating or cooling system, which components comprise one or more of a circulation pump, at least one heat exchanger, and/or at least one valve, receive control data directly from a cloud-based data storage.

### Claim 13

A arrangement for controlling a first heating or cooling system of a first building, the arrangement is configured to:
provide an outside temperature-related control of a thermal property of at least a portion of a first building by regulation of a supply temperature of a first heating or cooling system of a first building;
control the regulation of the supply temperature on the basis of the at least one thermal power indicative parameter, wherein the at least one thermal power indicative parameter is indicative of the heat consumption or of the cooling power of at least one second heating or cooling system of a second building located at a distance from the first building;
receive the at least one thermal power indicative parameter via a data network; and
receive, at a first heating or cooling system in the first building, a leading signal indicative of a time derivative of the at least one thermal power indicative parameter from a data storage for controlling the at least one thermal power indicative parameter.

### Claim 14

A server the server being configured:
to receive one or more thermal power indicative parameter/parameters from at least one second heating or cooling system of a second building via a data network; adapted
to provide the data to a first heating and cooling system of a first building via the data network, wherein the one or more thermal power indicative parameter serves for influencing the control of a thermal property of a first building, and wherein the at least one thermal power indicative parameter is based on the heat consumption or the cooling power of the at least one second heating or cooling system, and wherein a first heating or cooling system in the first building receives a leading signal indicative of a time derivative of the at least one thermal power indicative parameter from a data storage for controlling the at least one thermal power indicative parameter.
