# US 2019/0376713 A1 · Energy management system and energy managing method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0376713 A1
- Document ID: US20190376713A1
- Status: Published application
- Kind: A1
- Application number: 16/424,877
- Filed: 2019-05-29
- Published: 2019-12-12
- Earliest claimed: 2018-06-12
- Assignees: Hitachi, Ltd.; The University of Tokyo
- Applicants: Hitachi, Ltd.; The University of Tokyo
- Inventors: Naoki YOSHIMOTO; Yasunori AKASHI; Shohei MIYATA; Yasuhiro KUWAHARA
- Web page: https://patentgrep.com/patent/US20190376713A1

## CPC

- F24F 11/47: Responding to energy costs
- F24F 11/56: Remote control
- F24F 11/64: using pre-stored data
- F24F 11/65: for selecting an operating mode
- F24F 11/80: for controlling the temperature of the supplied air
- F24F 11/84: using valves
- F24F 11/85: using variable-flow pumps
- F24F 11/86: by controlling compressors within refrigeration or heat pump circuits
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G06N 5/02: Knowledge representation; Symbolic representation
- G06Q 50/06: Energy or water supply
- F24F 2110/10: Temperature
- F24F 2110/12: of the outside air
- F24F 2130/20: Sunlight
- F24F 2140/50: Load
- F24F 2140/60: Energy consumption
- F24F 2221/54: Heating and cooling, simultaneously or alternatively
- G05B 2219/2614: HVAC, heating, ventillation, climate control
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

An energy management system has a prediction unit that determines an effective management pattern and predicts a DR demand amount and a reception unit that prepares a control plan and determines a DR response amount from a power consumption amount, and the reception unit prepares individual control plans for (1) minimizing the sum of power consumption amounts of a cooling tower and refrigerators without changing an amount of heat, (2) improving efficiency of the refrigerators by increasing a cold water temperature at an outlet of one refrigerator, (3) stopping an operation of one refrigerator, (4) reducing motive power of the pump and (5) operating an alternative facility and stopping the operation of one refrigerator, combines together the prepared individual control plans and prepares a control plan that satisfies the predicted DR demand amount.

## Claims

### Claim 1

An energy management system that controls an operation of an air conditioning facility, comprising:
an arithmetic operation device that realizes the following respective function units by executing processing in accordance with predetermined procedures; and
a storage device that is connected to the arithmetic operation device,
wherein the air conditioning facility includes a cooling tower that cools cooling water, refrigerators that cool cold water, a pump that works to circulate the cold water, and a valve that is disposed in a flow path of the cold water,
the energy management system further comprises:
a prediction unit that determines one effective management pattern that is similar to a current effective management state in past effective management data of the air conditioning facility and predicts a DR demand amount on the basis of a weather forecast and the past effective management data of the air conditioning facility; and
a reception unit that prepares a control plan for the air conditioning facility by using the determined effective management pattern and determines a DR response amount depending on a power consumption amount in the control plan as the function units, and
wherein the reception unit prepares at least one of individual control plans for (1) minimizing the sum of power consumption amounts of the cooling tower and the refrigerator without changing an amount of heat that the refrigerator generates by controlling an operation of the cooling tower, (2) improving efficiency of the refrigerator by increasing a cold water temperature at an outlet of the refrigerator, (3) stopping an operation of at least one of the refrigerators, (4) controlling operations of the valve and the pump to reduce motive power of the pump, and (5) operating an alternative facility and stopping the operation of at least one of the refrigerator, combines the prepared individual control plans with one another in order of the plans (1) to (5), and thereby prepares a control plan that satisfies the predicted DR demand amount.

### Claim 2 (depends on 1)

The energy management system according to claim 1, wherein the reception unit prepares at least one of individual control plans for (1) controlling a temperature of the cooling water which is sent out of the cooling tower so as to minimize the sum of power consumption amounts of a fan of the cooling tower and the refrigerator, (2) increasing a temperature of the cold water that is sent out of the refrigerator, (3) stopping an operation of at least one of the refrigerators to increase a temperature of the cold water, (4) controlling operations of the valve and the pump to reduce a header-to-header differential pressure and a supplied water amount of the cold water, and (5) operating the alternative facility and stopping the operation of at least one of the refrigerators, combines the prepared individual control plans with one another in order of the plans (1) to (5), and thereby prepares a control plan that satisfies the predicted DR demand amount.

### Claim 3 (depends on 1)

The energy management system according to claim 1,
wherein the reception unit
estimates the electric power unit price in demand response on the basis of the weather forecast and past actual result data of the demand response,
decides magnitude of a profit obtained by implementing the demand response on the basis of a result of comparison between the estimated electric power unit price and a predetermined threshold value, and
in a case where the obtained profit is large, prepares a control plan for controlling a plurality of pieces of equipment.

### Claim 4 (depends on 1)

The energy management system according to claim 1,
wherein the storage device stores therein a plurality of effective management patterns of the air conditioning facility, and
the prediction unit determines the effective management pattern by selecting one effective management pattern that is similar to the current effective management state of the air conditioning facility from the effective management patterns in the storage device on the basis of a current meteorological condition and the past effective management data of the air conditioning facility.

### Claim 5 (depends on 1)

The energy management system according to claim 1, further comprising a restoration unit that determines a restoration model on the basis of the current meteorological condition, an operation state of the air conditioning facility and a warmth state that is achieved by the air conditioning facility, performs control of restoration from demand response in accordance with the determined restoration model, and verifies the operation state of the air conditioning facility on the basis of the operation state of the air conditioning facility that is being subjected to the restoration control and the warmth state that is achieved by the air conditioning facility concerned as the function unit.

### Claim 6 (depends on 1)

The energy management system according to claim 1, further comprising a calculation unit that verifies the operation state of the air conditioning facility while demand response is being implemented on the basis of the operation state of the air conditioning facility and a warmth state that is achieved by the air conditioning facility and re-prepares a control plan in a case where power consumption of the air conditioning facility deviates from power consumption in the prepared control plan as the function unit.

### Claim 7

An energy managing method that an energy management system that controls an operation of an air conditioning facility executes,
wherein the energy management system includes an arithmetic operation device that executes processing in accordance with predetermined procedures and a storage device that is connected to the arithmetic operation device, and
the air conditioning facility includes a cooling tower that cools cooling water, refrigerators that cool cold water, a pump that works to circulate the cold water, and a valve that is disposed in a flow path of the cold water,
the energy managing method comprising the steps of:
determining one effective management pattern that is similar to a current effective management state in past effective management data of the air conditioning facility by the arithmetic operation device;
predicting a DR demand amount on the basis of a weather forecast and the past effective management data of the air conditioning facility by the arithmetic operation device;
preparing at least one of individual control plans for (1) minimizing the sum of power consumption amounts of the cooling tower and the refrigerator without changing an amount of heat that the refrigerator generates by controlling an operation of the cooling tower, (2) improving efficiency of the refrigerator by increasing a cold water temperature at an outlet of the refrigerator, (3) stopping an operation of at least one of the refrigerators, (4) controlling operations of the valve and the pump to reduce motive power of the pump, and (5) operating an alternative facility and stopping the operation of at least one of the refrigerator, combining the prepared individual control plans with one another in order of (1) to (5) and hereby preparing a control plan that satisfies the predicted DR demand amount by the arithmetic operation device in accordance with the determined effective management pattern by the arithmetic operation device; and
determining a DR response amount from a power consumption amount in the control plan concerned by the arithmetic operation device.

### Claim 8 (depends on 7)

The energy managing method according to claim 7, wherein the arithmetic operation device prepares at least one of individual control plans for (1) controlling a temperature of the cooling water which is sent out of the cooling tower so as to minimize the sum of power consumption amounts of a fan of the cooling tower and the refrigerator, (2) increasing a temperature of the cold water that is sent out of the refrigerator, (3) stopping an operation of at least one of the refrigerators to increase a temperature of the cold water, (4) controlling operations of the valve and the pump to reduce a header-to-header differential pressure and a supplied water amount of the cold water, and (5) operating the alternative facility and stopping the operation of at least one of the refrigerators, combines the prepared individual control plans with one another in order of (1) to (5), and thereby prepares a control plan that satisfies the predicted DR demand amount.

### Claim 9 (depends on 7)

The energy managing method according to claim 7,
wherein the arithmetic operation device
estimates the electric power unit price in demand response on the basis of the weather forecast and past actual result data of the demand response,
decides magnitude of a profit obtained by implementing the demand response on the basis of a result of comparison between the estimated electric power unit price and a predetermined threshold value, and
in a case where the obtained profit is large, prepares a control plan for controlling a plurality of pieces of equipment.

### Claim 10 (depends on 7)

The energy managing method according to claim 7,
wherein the storage device stores a plurality of effective management patterns of the air conditioning facility, and
the arithmetic operation device determines the effective management pattern by selecting one effective management pattern that is similar to the current effective management state of the air conditioning facility from the effective management patterns in the storage device on the basis of a current meteorological condition and the past effective management data of the air conditioning facility.

### Claim 11 (depends on 7)

The energy managing method according to claim 7,
wherein the arithmetic operation device
determines a restoration model on the basis of the current meteorological condition, an operation state of the air conditioning facility and a warmth state that is achieved by the air conditioning facility,
performs control of restoration from demand response in accordance with the determined restoration model, and
verifies the operation state of the air conditioning facility on the basis of the operation state of the air conditioning facility that is being subjected to the restoration control and the warmth state that is achieved by the air conditioning facility concerned.

### Claim 12 (depends on 7)

The energy managing method according to claim 7,
wherein the arithmetic operation device
verifies the operation state of the air conditioning facility while demand response is being implemented on the basis of the operation state of the air conditioning facility and a warmth state that is achieved by the air conditioning facility and
re-prepares a control plan in a case where power consumption of the air conditioning facility deviates from power consumption in the prepared control plan.
